| 1 | SINGLE₹12.7 LAccepted-AOC SARSAVAH RAJA POST JAYANT DISTT SINGRAULI MP 486890 | JAYANT | SINGRAULI | MP | 486890 | SINGLE | Accepted-AOC PLACEMENT OF WORK ORDER TO SINGLE BIDDER WITH APPROVAL OF GM KHADIA |
| Sl No | Description | Qty | Unit | SUNSHINE ENGINEERING L1 |
|---|---|---|---|---|
| 1.00Scope of Work/Technical Specifications etc. 1.Thorough Joint Cleaning: Ensuring that joint is thoroughly cleaned prior to welding is essential to achieve high quality welds. 2. Grinding of cracks for V groove preparation. 3. Crack removal Confirmation: It is crucial to confirm the complete removal of any cracks through DP test. 4. Preheating the joint: Preheating the joint before welding helps to prevent thermal shock and reduce risk of cracking. 5. Maintaining Interpose Temperature during 03 layer of welding of cracks: Carefully maintaining the interpose temperature is necessary to ensure the integrity of the weld. 6. Post- Heating the Weld Joint: Post-heating the weld joint after completion helps to relieve residual stresses and reduce the risk of cracking. 7. Conduct DP test-03 times (after root, after 03 layer welding, after final welding) per crack. 8. Conduct UT per crack to find hidden internal cracks, voids, and flaws in the welded joints. 9. Controlled Cooling rate: After welding is completed, it is imperative to properly cover the weld joint to control the cooling rate, preventing the formation of undesirable microstructures. 10. submission of report to Incharge Dragline. Note: Maximum deployement of manpower likely to be 1. Skilled Welder for 184 nos. of mandays, 2. Skilled Fitter for 184nos. of mandays and 3. Un-skilled helper for 184 nos. of mandays. Additional term and condition- a- Contractor shall be responsible for movement of their manpower with their vehicle. b- Contractor shall provide PPE to engaged manpower. c- Contractor shall be responsible for all statuary liability like safety of manpower, vehicle & machine, distribution of SOP to the personal engaged for the work and ensured its followability etc. | ||||
| 2.00Charges for repairing of 26 cracks at Roller pads (base and rotate frame), rotate frame structure and housing of rotate pinion bearing as per above scope of work. | ||||
| 2.10 | Labour charges including contractor's profit per crack. | 26 | Job | 9,700 ₹2,52,200 Lowest |
| 2.20 | Grinding of cracks for V preparation including charges for grinder per crack | 520 | Hrs | 100 ₹52,000 Lowest |
| 2.30 | DP Test 3 times(after root, after 3 layer, after final layer) per crack | 78 | Nos. | 500 ₹39,000 Lowest |
| 2.40 | UT test per crack | 26 | Job | 1,000 ₹26,000 Lowest |
| 2.50 | Stress Releiving by control heating and cooling per crack | 26 | Job | 9,500 ₹2,47,000 Lowest |
| 2.60 | Hiring of welding machine | 52 | Day | 100 ₹5,200 Lowest |
| 3.00Charges for repairing of 20Nos. Cracks in various base chambers as per above scope of work. | ||||
| 3.10 | Labour charges including contractor's profit per crack. | 20 | Job | 9,700 ₹1,94,000 Lowest |
Tender Value
₹12.7 L
EMD Value
₹15,900
Closing Date
26 Sept 2026, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GENERAL MANAGER EXCAVATION, NCL KHADIA PROJECT
NCL KHADIA PROJECT, SHAKTINAGAR, SONEBHADRA, U.P. - 231222
Repairing of various cracks of revolving frame, rail pads, base chambers, housing rotate pinion etc. of 33BY72 W2000 Somnath Dragline of Khadia Project.
2026_NCL_365220_1
KHD/G.M. (Excv)/E-Tender/26-27/488
Open Tender
Excavation Department Work
Item Rate
30 days
NCL KHADIA PROJECT, SHAKTINAGAR
Please refer Tender documents.
6 documents required · 6 mandatory
₹15,900
1 Nov 2026
9 Sept 2026
28 Sept 2026
9 Sept 2026
26 Sept 2026
10 Sept 2026
9 Sept 2026 - 16 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Scope of Work/Technical Specifications etc. 1.Thorough Joint Cleaning: Ensuring that joint is thoroughly cleaned prior to welding is essential to achieve high quality welds. 2. Grinding of cracks for V groove preparation. 3. Crack removal Confirmation: It is crucial to confirm the complete removal of any cracks through DP test. 4. Preheating the joint: Preheating the joint before welding helps to prevent thermal shock and reduce risk of cracking. 5. Maintaining Interpose Temperature during 03 layer of welding of cracks: Carefully maintaining the interpose temperature is necessary to ensure the integrity of the weld. 6. Post- Heating the Weld Joint: Post-heating the weld joint after completion helps to relieve residual stresses and reduce the risk of cracking. 7. Conduct DP test-03 times (after root, after 03 layer welding, after final welding) per crack. 8. Conduct UT per crack to find hidden internal cracks, voids, and flaws in the welded joints. 9. Controlled Cooling rate: After welding is completed, it is imperative to properly cover the weld joint to control the cooling rate, preventing the formation of undesirable microstructures. 10. submission of report to Incharge Dragline. Note: Maximum deployement of manpower likely to be 1. Skilled Welder for 184 nos. of mandays, 2. Skilled Fitter for 184nos. of mandays and 3. Un-skilled helper for 184 nos. of mandays. Additional term and condition- a- Contractor shall be responsible for movement of their manpower with their vehicle. b- Contractor shall provide PPE to engaged manpower. c- Contractor shall be responsible for all statuary liability like safety of manpower, vehicle & machine, distribution of SOP to the personal engaged for the work and ensured its followability etc. | |||||
| 2Charges for repairing of 26 cracks at Roller pads (base and rotate frame), rotate frame structure and housing of rotate pinion bearing as per above scope of work. | |||||
| 2.1 | Labour charges including contractor's profit per crack. | 26 | Job | 9,724 | ₹2,52,824 |
| 2.2 | Grinding of cracks for V preparation including charges for grinder per crack | 520 | Hrs | 100 | ₹52,000 |
| 2.3 | DP Test 3 times(after root, after 3 layer, after final layer) per crack | 78 | Nos. | 500 | ₹39,000 |
| 2.4 | UT test per crack | 26 | Job | 1,000 | ₹26,000 |
| 2.5 | Stress Releiving by control heating and cooling per crack | 26 | Job | 9,500 | ₹2,47,000 |
| 2.6 | Hiring of welding machine | 52 | Day | 100 | ₹5,200 |
| 3Charges for repairing of 20Nos. Cracks in various base chambers as per above scope of work. | |||||
| 3.1 | Labour charges including contractor's profit per crack. | 20 | Job | 9,724 | ₹1,94,480 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.21 MB
ITB.pdf
Tender Documents • 0.39 MB
COC_ATC.pdf
Tender Documents • 1.44 MB
Annexures.pdf
Tender Documents • 0.82 MB
BOQ_378143.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .