Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.7 LAccepted-AOC | L1 | Accepted-AOC AOC Issued | |
| 2 | L2₹17.8 L+₹836.34 (0.05%)Rejected-Finance | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | PRIYA L2 | S SAKTHIMURUGAN L1 |
|---|---|---|---|---|---|
| 1.00 | Earthwork excavation and depositing on bank with an initial lead of 10m and lift of 2m in the following classification of soils as directed by Deparment officers. Hard stiff clay, block cotton, hard red earth shales, murram, ordinary gravel, stoney eart (First depth of 2m) | 58.32 | cum | 264 ₹15,396.48 | 263.7 ₹15,378.98 Lowest |
| 2.00 | Earthwork excavation and depositing on bank with an initial lead of 10m and lift of 2m in the following classification of soils as directed by Deparment officers. Hard stiff clay, block cotton, hard red earth shales, murram, ordinary gravel, stoney eart (2 nd Depth) | 8.75 | cum | 264 ₹2,310 | 263.7 ₹2,307.38 Lowest |
| 3.00 | Sand filling for foundation with clear river sand including cost of sand watering, ramming and consolidation etc complete as directed by Department officers. | 4.37 | cum | 2,296 ₹10,033.52 | 2,295.5 ₹10,031.34 Lowest |
| 4.00 | Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete as directed by Department officers. | 4.37 | cum | 6,108 ₹26,691.96 | 6,107.3 ₹26,688.9 Lowest |
| 5.00 | RCC in M30 GRADE using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete as directed by Department- For footing below G.L.( 1,50 to 4,50 below GL ) | 13.52 | cum | 9,458 ₹1,27,872.16 | 9,457.5 ₹1,27,865.4 Lowest |
| 6.00 | RCC in M30 GRADE using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete as directed by Department- For Column and Brace upto G.L ( 0 to1,50 below GL ) | 1.75 | cum | 9,319 ₹16,308.25 | 9,318.8 ₹16,307.9 Lowest |
| 7.00 | RCC in M30 GRADE using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete as directed by Department- For column and brace I 0 to 4.50m from GL | 2.83 | cum | 9,461 ₹26,774.63 | 9,460 ₹26,771.8 Lowest |
| 8.00 | RCC in M30 GRADE using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete as directed by Department- For column and brace II 4.50m to 7.32m from GL | 2.22 | cum | 9,738 ₹21,618.36 | 9,737.8 ₹21,617.92 Lowest |
| 9.00 | RCC in M30 GRADE using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete as directed by Department- For column and brace III 7.32 to 10.98m from GL | 2.53 | cum | 10,016 ₹25,340.48 | 10,015.7 ₹25,339.72 Lowest |
| 10.00 | For column beam floor slab side wall from 10.98m to 14.64 m from GL | 11.38 | cum | 10,294 ₹1,17,145.72 | 10,293.5 ₹1,17,140.03 Lowest |
Tender Value
₹18 L
EMD Value
₹18,000
Closing Date
31 Oct 2025, 6:50 pmClosed
Block Development Officer(B.P), Kumaratchi
Block Development Officer(B.P), Kumaratchi
Construction of New OHT 30000 Litre Capacity (12m Stage) at Melavanniyur in Nedumbur Panchayat in Kumaratchi Block.
2025_RDTN_616663_3
PMKKKY
Open Tender
Civil Works
Works
120 days
Kumaratchi
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹18,000
Yes
4 Nov 2025
25 Oct 2025
31 Oct 2025
25 Oct 2025
31 Oct 2025
25 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_737245.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.50 MB
BOQ_737245.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .