Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.0 LAccepted-Finance 110 MINI SHOPPING COMPLEX NEHRU MARKET JAMMU | L1 | Accepted-Finance Being lowest bidder | |
| 2 | L2₹1.1 L+₹5,000 (4.78%)Rejected-Finance MAIN CHOWK TABAB TILLO JAMMU | JAMMU | JAMMU AND KASHMIR | 180001 | L2 | Rejected-Finance Not being lowest bidder | |
| 3 | L3₹1.1 L+₹5,099 (4.88%)Rejected-Finance | L3 | Rejected-Finance Not being lowest bidder | |
| 4 | L4₹1.1 L+₹10,000 (9.57%)Rejected-Finance NOT AVAILABLE | L4 | Rejected-Finance Not being lowest bidder |
Tender Value
Refer Docs
EMD Value
₹3,000
Closing Date
6 Aug 2021, 2:00 pmClosed
Executive Engineer
MID, Jammu
fabrication of saddle for suction pipeline along with allied mechanical works at lift irrigation station Aijipur Trewa.
2021_IFC_131452_1
MID/J/e-NIT/2021-22/49
Open Tender
Machineries/ Mechanical Engg Items
Lump-sum
30 days
trewa
Please refer Tender documents.
7 documents required · 7 mandatory
₹200
Executive Engineer MID Jammu
₹3,000
jammu
24 Aug 2021
20 Jul 2021
7 Aug 2021
20 Jul 2021
6 Aug 2021
31 Jul 2021
20 Jul 2021 - 6 Aug 2021
26 Jul 2021
Amount
Designing and fabrication of MS saddle to support suction pipeline from lift irrigation station to intake point by way of dismantling existing 40 ft suction pipe after cutting of damaged nuts and bolts. Stacking the pipeline at safe place. Fabrication of saddle support by using angle iron 50 x 50 x 6 mm under the pipe for support. Total length of angle iron required will be 200 ft. The saddle structure must be properly welded to withstand the weight of suction pipeline. The job included leveling of area below the supports of saddle and grouting the saddle with concrete mixture to support the weight of suction pipeline and vibrations. Installation of suction pipeline over the saddle with long boom crane, manual labour without damaging the fabricated saddle. Replacement of 6 no’s 300 mm diameter flanges on suction pipeline. Assembling of suction pipeline using new hexagonal nuts and bolts, rubber gaskets between all the flanges. Providing and fitting of new 250 mm diameter foot valve on the suction pipeline. Painting of suction pipeline and saddle with one coat of red oxide primer and coat of black enamel paint. Complete job includes cost of material, labor charges, painting charges, crane charges, charges of civil work.
GANPATI ELECTRICAL AND MECHANICAL WORKS
SMART TECH AND CO
N B Engineering and Electric Works
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .