Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹27.0 LAccepted-AOC 222 LAXMI MARKET JAYANT JAYANT SINGRAULI MADHYA PRADESH 486890 | SINGRAULI | MADHYA PRADESH | 486890 | L-1 | Accepted-AOC on L-1 basis in open tender | |
| 2 | Rejected-Technical 22 AMBEDKAR NAGAR PO SHAKTINAGAR | SHAKTINAGAR | SONBHADRA | UTTAR PRADESH | 231222 | - | Rejected-Technical Rejected as not L1 | |
| 3 | Rejected-Technical CETI GATE P O SINGRAULI DISTT SINGRAULI M P PIN 486886 | SINGRAULI | SINGRAULI | MADHYA PRADESH | 486886 | - | Rejected-Technical Rejected as not L1 | |
| 4 | Rejected-Technical AXIS BANK LTD A 12 MITTAL TOWAR NARIMAN POINT MUMBAI C O VOLTAS LTD VOLTAS SPARE PARTS DEPOT OLD HUTMENT COLONY SINGRAULI MP NEAR NAWANAGAR POLICE STATION | MUMBAI | MUMBAI | MADHYA PRADESH | 486887 | - | Rejected-Technical Rejected as not L1 |
Tender Value
₹41.9 L
EMD Value
₹52,400
Closing Date
8 Sept 2022, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GENERAL MANAGER (EXCV)
GM(Excv) Nigahi Area NCL, PO Nigahi Dist Singrauli, MP-486884
OTR Tyre Demounting, mounting, Disassembling, Assembling and Tyre Inflation pressure checking work of various Model Dumpers, Motor Graders, Pay loaders, Cranes, and Water sprinkler at New Workshop and Old Workshop at site at Nigahi Project.
2022_NCL_254528_1
NGH/EXCV/TENDERS/22-23/035
Open Tender
Excavation Department Work
Item Rate
365 days
Nigahi Project
As per NIT
5 documents required · 5 mandatory
₹52,400
1 Nov 2022
27 Aug 2022
9 Sept 2022
27 Aug 2022
8 Sept 2022
28 Aug 2022
27 Aug 2022 - 1 Sept 2022
Amount
Scope of Work: OTR Tyre Demounting, mounting, Disassembling, Assembling and Tyre Inflation pressure checking work of various Model Dumpers, Motor Graders, Pay loaders, Cranes, and Water sprinkler at New Workshop and Old Workshop at site at Nigahi Project for the period of 12 Months/365 days. Note : The contractor should arrange material all the tools and tackles , socket, tee handle, Torque wrench and other accessories for carrying out the job. All other facility/materials like crane/dozer, power connection if required for execution of job shall be provided free of cost by department in mines area only. However, the swintch gear, power cable required for this purpose shall be contractor's responsibility.
Description of work at Old-Workshop, Nigahi Project at site - Wheel / OTR Tyre demounting from equipment, dismantling of wheel, reassembly after necessary repair, fitment back on machine ( irrespective of location of tyres in machine ) size of tyre (27.00 x 49, 24.00 x 49, 35/65 - 33 and 29.50 x 25) at site at Old Workshop, Nigahi Project
Cost/ charges for Dismantling of wheel/ OTR Tyre for size (27.00 x 49, 24.00 x 49 ) (Minimum 1 No. Skilled + 3 Nos. semi skilled manpower to be deployed for 1.5 hrs.) including Labour charges, contractor profit, any misc. charges, CMPF/EPF and CMPS/ Pension etc.
Cost/ charges for Assembling of wheel/ OTR Tyre for size (27.00 x 49, 24.00 x 49) (Minimum 1 No. Skilled + 3 Nos. semi skilled manpower to be deployed for 1.5 hrs.) including Labour charges,Contractor profit , any misc. charges, CMPF/EPF and CMPS/Pension etc.
Cost/ Charges for Demounting of wheel/ OTR Tyre for size( 27.00 x 49, 24.00 x 49) (Minimum 1 No. Skilled + 3 Nos. semi skilled manpower to be deployed for 2.5 hrs.) including Labour charges, Contractor profit , any misc charges, CMPF/EPF and CMPS/Pension etc.
Cost/ Charges for Fitment of wheel/ OTR Tyre back on machine for size( 27.00 x 49, 24.00 x 49) (Minimum 1 No. Skilled + 3 Nos. semi skilled manpower to be deployed for 3.5 hrs.) including Contractor profit , Labour charges, any misc. charges, CMPF and CMPS/Pension etc.
Description of work at Old-Workshop, Nigahi Project at site -Wheel / OTR Tyre demounting from equipment, dismantling of wheel, reassembly after necessary repair, fitment back on machine ( irrespective of location of tyres in machine ) size of tyre (23.50 x 25, 20.50 x 25, and 18.00 x 25) at site at Old Workshop, Nigahi Project
Cost/ Charges for Dismantling of wheel/ OTR Tyre for size ( 23.50 x 25, 20.50 x 25 and 18.00 x 25) (Minimum 1 No. Skilled + 3 Nos. semi skilled manpower to be deployed for 1 hrs.) including Labour charges, any misc. charges, Contractor profit , any misc. charges, CMPF/EPF and CMPS/Pension etc.
Cost/ Charges for Assembling of wheel/ OTR Tyre for size ( 23.50 x 25, 20.50 x 25 and 18.00 x 25) (Minimum 1 No. Skilled + 3 Nos. semi skilled manpower to be deployed for 1 hrs.) including , Labour charges, Contractor profit , any misc. charges, CMPF/EPF and CMPS/Pension etc.
Cost/ Charges for Demounting of wheel/ OTR Tyre for size ( 23.50 x 25, 20.50 x 25 and 18.00 x 25) (Minimum 1 No. Skilled + 3 Nos. semi skilled manpower to be deployed for 2 hrs.) including Labour charges, contractor profit, any mis. charges, CMPF/EPF and CMPS/Pension etc.
Cost/ Charges for Fitment of wheel/ OTR Tyre back on machine for size ( 23.50 x 25, 20.50 x 25 and 18.00 x 25) (Minimum 1 No. Skilled + 3 Nos. semi skilled manpower to be deployed for 2 hrs.) including Labour charges, Contractor profit , any misc. charges, CMP/EPF and CMPS/Pension etc.
Charges for Tyre inflation pressure checking and up keeping work form 6AM to 2 PM and 2 PM to 10PM ( Minimum 2 skilled manpower x 8 hrs. x 365 days)
Description of work at New-Workshop, Nigahi Project at site - Wheel/ OTR demounting from equipment, dismantling of wheel, reassembly after necessary repair, fitment on machine ( irrespective of location of tyres in machine ) size of tyre (37.00 R 57 and 40.00 R 57 ) at New Workshop at site
Cost/ charges for Dismantling of Wheel/ OTR Tyre for size ( 37.00 R 57 and 40.00 R 57) (Minimum 1 No. Skilled + 3 Nos. semi skilled manpower to be deployed for 1.5 hrs.) including Labour charges, Contractor profit,misc. charges,CMPF/EPF and CMPS/Pension etc.
Cost/Charges for Assembling of wheel/ OTR Tyre for size ( 37.00 R 57 and 40.00 R 57) (Minimum 1 No. Skilled + 3 Nos. semi skilled manpower to be deployed for 2 hrs.) including Labour charges, Contractor profit, any misc. charges CMPF/EPF and CMPS/Pension etc.
Cost/ charges for Demounting of wheel/ OTR Tyre for size ( 37.00 R 57 and 40.00 R 57) (Minimum 1 No. Skilled + 3 Nos. semi skilled manpower to be deployed for 3 hrs.) including Contractor profit , Labour charges, any misc charges, CMPF/EPF and CMPS/Pension etc.
Cost/Charges for Fitment of wheel/ OTR Tyre back on machine for size ( 37.00 R 57 and 40.00 R 57) (Minimum 1 No. Skilled + 3 Nos. semi skilled manpower to be deployed for 3.5 hrs.) including Contractor profit , Labour charges, any misc charges, CMPF/EPF and CMPS/Pension etc.
Description of work at New-Workshop, Nigahi Project at site - Wheel/ OTR demounting from equipment, dismantling of wheel, reassembly after necessary repair, fitment on machine ( irrespective of location of tyres in machine ) size of tyre (30.00 x 51 and 27.00 x 49 ) at New Workshop at site
Cost/ charges for Dismantling of Wheel/ OTR Tyre for size (30.00 x 51 and 27.00 x 49 ) (Minimum 1 No. Skilled + 3 Nos. semi skilled manpower to be deployed for 1.5 hrs.) including Labour charges, Contractor profit,misc. charges,CMPF/EPF and CMPS/Pension etc.
Cost/Charges for Assembling of wheel/ OTR Tyre for size (30.00 x 51 and 27.00 x 49 ) (Minimum 1 No. Skilled + 3 Nos. semi skilled manpower to be deployed for 1.5 hrs.) including Labour charges, Contractor profit, any misc. charges CMP/EPFF and CMPS/Pension etc.
Cost/ charges for Demounting of wheel/ OTR Tyre for size (30.00 x 51 and 27.00 x 49 ) (Minimum 1 No. Skilled + 3 Nos. semi skilled manpower to be deployed for 2.5 hrs.) including Contractor profit , Labour charges, any misc charges, CMPF/EPF and CMPS/Pension etc.
Cost/Charges for Fitment of wheel/ OTR Tyre back on machine for size (30.00 x 51 and 27.00 x 49 ) (Minimum 1 No. Skilled + 3 Nos. semi skilled manpower to be deployed for 3.5 hrs.) including Contractor profit , Labour charges, any misc charges, CMPF/EPF and CMPS/Pension etc.
Charges for Tyre inflation pressure checking and up keeping work form 6AM to 2 PM and 2 PM to 10PM ( Minimum 2 skilled manpower x 8 hrs. x 365 days)
Total impact of GST for the purpose of CTC
A D M CONSTRUCTION
MAGADH ENTERPRISES
Universal MEP Projects & Engineering Services Limited
stage.html
html • 0.04 MB
techsummary_263149.pdf
PDF • 0.76 MB
finsummary_263149.pdf
PDF • 0.21 MB
LOI07.pdf
PDF • 0.76 MB
BOQ Comparative Chart
xlsx • 0.01 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .