| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.5 LAccepted-AOC SIDDIM KAFFER KALIMPONG 734314 | KALIMPONG | KALIMPONG | WEST BENGAL | 734314 | ₹3.5 L | L1 | Accepted-AOC The lowest bidder L1, is accepted |
| 2 | L2₹3.5 LRejected-AOC | ₹3.5 L | L2 | Rejected-AOC The second lowest bidder L2, is rejected |
| 3 | L3₹3.6 LRejected-AOC | ₹3.6 L | L3 | Rejected-AOC The third lowest bidder L3, is rejected |
Tender Value
₹3.5 L
EMD Value
₹7,000
Closing Date
24 Feb 2026, 10:00 amClosed
EE AED , Kalimpong
Office of the Executive Engineer, Algarah Engineering Division, Kalimpong
Footpath and Other Allied Works at Tamang Gumba, Paiyong Gram Panchayat under Lava Block, Kalimpong, GTA.
2026_GTA_1003566_5
12/EE/AED/KPG/GTA/2025-26
Open Tender
CIVIL WORKS
90 days
Paiyong
Please refer Tender documents.
6 documents required · 6 mandatory
₹750
₹7,000
16 Mar 2026
11 Feb 2026
26 Feb 2026
11 Feb 2026
24 Feb 2026
11 Feb 2026
Earthwork in cutting to form road section in correct profile including removal of spoils not exceding initial lead of 50m and initial lift of 1.5m (iii) in mixed hard soil (i.e., hard moorum and soil containing laterite and boulders which do not require blasting)
Earthwork in excavation of foundation trenches or drains in all sorts of soils including removing spreading or stacking the spoils within a lead of 75 m as directed including trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water etc. all complete. (a) Depth of excavation not exceeding 1.5 m.
Earthwork in filling in foundation trenches or plinth with good earth in layers not exceeding 150 mm including watering and ramming etc. layer by layer complete. (a) With earth obtained from excavation of foundation.
Removal of rubbish,earth etc from the working site and disposal of the same beyond the compound in conforming with the Muncipality/Corporation Rules for such disposal,loading into trucks and cleaning the site in all respect as per direction of Enginner in charge
Single layer brick flat soling of picked bricks including ramming and dressing bed to proper level and filling joints with powdered earth or local sand.
Cement Concrete with graded stone ballast (30 mm size) excluding shutteirng. (B) In ground floor (with N.B. Variety Stone metal) (a) (1:3:6) proporaton
Stone Boulder 150 mm of N. Bengal variety
Labour for laying 150 mm to 200 mm boulder soling including rough dressing hand packing and ramming down small pieces in the interstics including rolling and preparing the bed to proper level and filling up all joints with sandy clay or earth
Hire and Labour charges for shuttering with centreing and necessary staging upto 4 m. using approved stoutprops and thick hard wood planks of approved thickness with required bracing for concrete slab, beams and columns,lintels curved or straight including fitting & fixing and striking out after completion of works (upto roof of ground floor) (a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-in-Charge
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.64 MB
Tendernotice_2.pdf
PDF • 0.75 MB
Tendernotice_3.pdf
PDF • 0.15 MB
BOQ_2460148.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid