Tender Value
₹45.5 L
EMD Value
₹90,932
Closing Date
31 Aug 2026, 9:00 am2d left
Divisional Engineer
Divisional Engineer Mansa Pwrmdc Division Mansa
Estimate for Lining/Relining by laying UGPL of w/c of O/L RD 20680-R of Lad Banjara Disty of Village Dirba Distt. Sangrur (Laying and Jointing of RCC UGPL system and other allied works in construction watercourse
2026_WR_173442_2
19 of 2026
Open Tender
Civil Works
Item Rate
180 days
Dirba
Please refer Tender documents.
3 documents required · 3 mandatory
₹590
₹90,932
Yes
Mansa
24 Aug 2026
24 Aug 2026
31 Aug 2026
24 Aug 2026
31 Aug 2026
24 Aug 2026
26 Aug 2026
Project in-charge
Work Manager/Site Engineer
Engineering Graduate
PUNJAB WATER RESOURCE MANAGEMENT & DEVELOPMENT CORPORATION
Name of Constructor/Agency/L & C Society
Name of the Work
Truck/Tractor with trolley
Water Tanker
Sheep foot roller
Mortar tank
Soaking tank
Standard measuring box 1’ x 1’ x 11/4’ depth
PUNJAB WATER RESOURCES MANAGEMENT & DEVELOPMENT CORPORATION LTD.
SCHEDULE (D) (Summary of Experience of Agency/Contractor/L&C Society for similar nature of work)
Name of the Contractor / L&C Society
Name of the Work
Please fill information about the each relevant work completed during the last Five years for works Costing more than Rs._________________
Name of Employer
PUNJAB WATER RESOURCES MANAGEMENT & DEVELOPMENT CORPORATION LTD.
PRE-QUALIFACTION SCHEDULE (E) AFFIDAVIT
1. That I have submitted a bid for execution of work relating to"
in response to NIT issued by the
2. That all information given in the pre-qualification schedule forms and in the attachments are true and correct.
3. That the undersigned hereby authorize (s) and request (s) any bank/person/firm or corporation to furnish pertinent information required by the Deptt. deemed necessary regarding my (our) competence and general reputation
4. That the undersigned understands that if any further qualifying information shall be required I/We agree to furnish such information at the request of department/project/implementing agency.
PUNJAB WATER RESOURCES MANAGEMENT & DEVELOPMENT CORPORATION LTD.
SCHEDULE (F) ADDDITIONAL INFORMATION
Name of the Work
The bidder can add here any further information relevant to the evaluation of their pre-qualification bid :-
PUNJAB WATER RESOURCES MANAGEMENT & DEVELOPMENT CORPORATION
MANSA PWRMDC DIVISION, MANSA
Estimate for Lining/Relining by laying UGPL of w/c of O/L RD 20680-R of Lad Banjara Disty of Village Dirba Distt. Sangrur (Laying and Jointing of RCC UGPL system and other allied works in construction watercourse)
DNIT 19/2026 Dated 12/08/2026
Name of Firm
Earth work Excavation for pipe line in trenches and pits up to 1.5 meters depth in open area where disposal of surplus earth is done alongwith alignment, including trimming and dressing sides, levelling of beds of trenches to correct grade, cutting joint holes, refilling; consolidation and watering of refill in 15cm layers and Restoration of unmetalled or unpaved surface to its original condition excluding cost of shoring and timbering but including the cost of dewatering of rain water, diversion for traffic, night signals, providing & fixing caution boards, watching, fencing etc.
Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick-Jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres.
First class brick masonary 229 mm thick laid in cement sand mortar 1.6 in foundation and plinth including supply recarriage of bricks cement .
10mm thick cement plaster 1.4 on sides walls (-) Rs.1.25/- for scaffolding.
10mm thick cement plaster 1:4 on bed and top.
Reinforced cement concrete 1:2:4 hand mixed but including steel reinforcement
Cement Conc.1:2:4 including supply, carriage & with stone ballast or shingle
Cement concrete 1:4:8 with brick ballast 40mm gauge
Lowering and jointing including material of RCC pipes 500 mm dia into trenches & laying same to correct alignment ( complete)
Lowering and jointing including material of RCC pipes 150mm dia into trenches & laying same to correct alignment ( complete)
Wrought Iron and mild steel ladders, framed grills, grating etc. complete fixed in position in D-tank
Providing & fixing M.S. foot rests made of 23x25 mm square bar including fixing in Haudis complete with cement concrete 1:2:4
Providing and fixing of Alfa Valve fitted on riser pipe to act as Nakka (D regulators)
Centering &shuttering for Concrete faces
Providing & Fixing of Steel Shuter Gate Assembly
Dismantling of Brick work in Cement
Any Other Item
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.66 MB
TB01.xls
Tender Documents • 0.05 MB
20680-RBoqPipe.xls
Additional Documents • 0.07 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].