Loading…
Loading…
Tender ID
Tender Value
₹4.4 L
EMD Value
₹8,820
Closing Date
18 Mar 2026, 4:00 pmClosed
XEN REW Kathua
xenrew
Constt. of water tankies (7nos) at near kem lahad and near shop mohd saleem NHO mohd hussain dabbi seri mushtaq ahmed lahad, mohd ayaz butt saleem dhar (6th call)
2026_RDPR_305981_2
e-NIT No.395/REW/K of 2025-26 Dated 12/03/2026
Open Tender
Civil Works
Percentage
30 days
LOHAI MALHAR
sbd
2 documents required · 2 mandatory
₹500
Rural Development and Panchayati Raj
₹8,820
12 Mar 2026
12 Mar 2026
19 Mar 2026
12 Mar 2026
18 Mar 2026
12 Mar 2026
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides andramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth asdirected: All kinds of soil :
Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work upto plinth level with 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size)
Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
Brick work with common burnt clay (non-modular) bricks of class designation 7.5 infoundation and plinth including curing in Cement mortar 1:6 Mix.
Providing and laying in position specified grade of reinforced cement concrete incl. curing but excluding the cost of centering, shuttering, finishing and reinforcement. Allworks upto plinth level1:1½:3 Mix.
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing inposition and binding all complete upto plinth level
Centering and shuttering including strutting, propping etc. and removal of form for: Foundation
Centering and shuttering including strutting, propping etc. and removal of form for: Suspended Floor
12 mm Cement plasterof mix:1 : 4 ( 1 cement : 4 fine sand)
12mm Cement plaster finished with a floating coat of neat cement of mix: 1 : 4 ( 1 cement : 4 fine sand)
Carriage of Materials from source to Site Sand + Agg for 62 KM by MT + 200 M by HL
Carriage of Materials from source to Site Bricks for 122 KM by MT + 200 M by HL
Add Cost for CIB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 7.97 MB
BOQ_993695.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .