Tender Value
₹18.3 Cr
EMD Value
₹10.6 L
Closing Date
27 Feb 2026, 3:30 pmClosed
Yes (up to 3 members)
No
Two Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
90 days
Expenditure
Deposit Work
BRIDGE
14 conditions · 3 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N crores or V, whichever is lower; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of total contractual payments in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
Similar nature of work for this tender is "Any Civil Engineering work comprising of Construction of RCC Box by pushing technique".
22 conditions · 3 needing a document upload
Documents to be uploaded only in the website by the Tenderer Following Annexure duly filled and signed are to be uploaded online only prior to Closing of Tender. Original copy of all the documents to be submitted to office within 7 days whenever demanded by the Railway. Otherwise, Railway reserves rights to Reject/Accept such tender/offer without any reference to the tenderer/ tenderers. Annexure are available at Upload/View Document menu in Home Page of IREPS portal for works tender. Annexure Description 1. Annexure-I(a) Details of the Works Completed by the tenderer during the last seven years to be filled & submitted as per Annexure-I(a). 2. Annexure-I(b) Details of contractual payment received by the Tenderer during the last 3 (three) financial years including the current financial year to be filled & submitted in Annexure-I(b).3 Annexure-II Details of Plants and Machinery with the tenderer to be filled & submitted as per Annexure- II. 4. Annexure-III Details of Personnel and Organization of the Tenderer to be filled & submitted as per Annexure-III. 5. Annexure-IV Details of Works Presently on hand of the Tenderer to be filled & submitted as per Annexure- IV. 6. Annexure-V Details regarding Association of Railway Officer(s) with the tenderer to be filled & submitted as per Annexure- V. 7. Annexure-VI List of the Arbitration Cases of the Tenderer during last five years to be filled & submitted as per Annexure-VI. 8. Annexure-VII List of the Court Cases of the Tenderer during last Five years to be filled & submitted in Annexure- VII. 9. Annexure- VIII NEFT MANDATE FORM. All Payments to the agency (including the refund of the Bid Security of the unsuccessful bidder preferably) will be remitted through NEFT. The Tenderer is required to submit Bank details and A/C No. etc. in Annexure- VIII. 10. Annexure-IX GST COMPLAINT INVOICE: To be filled & submitted as per Annexure-IX. 11. Annexure V (A) by each partners of Partnership Firm/ JV/ HUF/ LLP; FORMAT FOR CERTIFICATE TO BE SUBMITTED / UPLOADED BY TENDERER ALONGWITH THE TENDER DOCUMENTS as per Annexure-V (A) of GCC-2022 12. Annexure-XI LETTER OF CREDIT: To be filled & submitted as per Annexure-XI. 13. Annexure-VIA BID SECURITY: Bank Guarantee Bond from any scheduled commercial bank of India to be filled & submitted as per Annexure-VIA. 14. Annexure-VIB Annual Contractual Turnover Data for the Previous 3/4 Years (Contractual Payment only) to be filled & submitted as per Annexure-VIA. 15. Submission of Form VA properly. 16. Annexure-VI of GCC- 2022: TENDERER'S CREDENTIALS (BID CAPACITY) to be submitted as per Annexure-VI of GCC-2022. (This annexure will be applicable, if tenders having advertised value more than Rs 20 crore wherein eligibility criteria includes bid capacity).
Demand for the Financial Criteria, Association of Railway Officers, List of Arbitration cases, Court cases and Mandate for NEFT are to be uploaded with a scanned copy duly filled in and signed as per annexure no. IV, V, VI, VII, VIII,IX,XI. Annexure-VI, VI A & VI B of GCC-2022 respectively. These Annexure are available in View Document menu at Home page and is downloadable. The details of the uploaded documents should be produced whenever demanded for verification on written request at any point of time of the tender and contract within 7 days Otherwise, Railway reserves rights to Reject/Accept such tender/offer without any reference to the tenderer/tenderers.
Demand for Mandate for NEFT is to be uploaded with a scanned copy duly filled in and signed as per annexure no. VIII. This Annexure is available in View Document menu at Home page and is downloadable.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Open e-tender for the work of Provision of Construction of limited height subway (6.0 * 6.0) m precast RCC.box by box pushing method at NTPC more in New Farakka-Azimganj section of Malda Division under Assistant Engineer/ New Farakka in the jurisdiction of Divisional Engineer-I/Malda/Eastern Railway.
158-MLDT-25-26~ER
158-MLDT-25-26
Open
Works - General
18 Months
Maldah, West Bengal
₹0
₹10.6 L
27 Feb 2026
4 Feb 2026
13 Feb 2026
113 items across 5 schedules · ₹18,13,61,593.71 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| Making water tight coffer dam earthen platform by any means i.e. by earth work or by filled with earth sand retained on nominal slope or ballah piling as necessary or lay any other means in a particular space i.e. in excavation etc. to enable the space to be dewatered. The rate also includes removal of earthen platform and clearing work site upto the satisfaction of Site In-charge. After the work is completed written approval of Railway Engineer should be obtained for operating this item. Ingredients of RCC including cement, labour, tools & plants and all testing as directed by the Site Engineer In-charge. | cum | 550.00 | 352 | 1,93,600 | |
| 2 | Supplying and driving hard wood ballah piles of sal or similar types of length varying from 5m to 6m and of average diameter 150mm. The rates includes supplying and erecting of derricks, monkey, all other necessary equipments, tools, plants, fuel, labours etc. as required for completion of the work in all respect. The rate also includes application on single layer bitumen on the ballah piles before they driven in to the ground. The ballah shall be driven only when these are passed by the competent authority and driven order is given. | Metre | 5000.00 | 508 | 25,40,000 |
| 3 | Driving Rail of section 90R/52kg/75 lbs of length 8 mtr. to 10 mtr. The rate should be included labours, cutting of rails (to be supplied by the Railway free of cost), leading of rails to the site of work upto man in distance of 100 mtr. from the unloading site. Supply of all tools & plants, fuel, lift complete Note: Approx. 2/3rd of rail length will be driven inside the earth and payment will be made for the length of rail driven in the earth only. | Metre | 1500.00 | 681 | 10,21,500 |
| 4 | Driving SH Rail of section 90R/52kg OR any section of rail below ground level across to Railway track during power block time up to required depth as per direction of site in cherge.The rate includes chiseling at one end with contractors own arrangement with derrick/rope/pulleycap/monkey,cutting of rails,trolleying/leadeing of rails to the site etc. complete in all respect.The rail will be supplied by Railway free of cost. | RM | 1500.00 | 760 | 11,40,000 |
| 5 | Supplying and fixing galvanised sheet/galvanised self supporting sheet in roofing made from mild steel having thickness minimum 0.80 BMT having coating of zinc/Aluminium+zinc including cutting to size and shape including cutting to size and shape including fixing .The rate shall include all cost of materials.taxes,labour,tools plants,fiture and machinery all lead and fit transportation,fixture etc complete and fixing as per direction of Engineer in charge at site. | Sqm | 2000.00 | 3,266 | 65,32,000 |
| 6 | RCC M-35 grade as per Rlys approved drawing and specification for construction of bridge sub structure /super strucre /RCC jacketing of arch ,pier abutment etc.The rate includes design of concrete mix manufacture of concrete y batching plant ,cost of form work included erection and de- shuttering ,placement of concrete using concrete pump /placing boom,compaction steel reinforecement cutting ,bending and binding of reinforcement with inding wires and placing in proper position,curing of concrete up to specified period complete in all respect including all lead lift crossing road /track etc.The rate also includes cost of all ingredient of RCC in/c cement,sand aggregate ,admixture ,labour tools and plants etc.but excluding the cost of reinforcement.The contractor has to construct the approach road to the site at his own cost ,if required no extra payment will be made for this. | cum | 460.00 | 12,698 | 58,41,080 |
| 7 | Reinforcement Cement concrete of M- 25 grade as per Railways approved drawing & specification for foundation of flooring, drop wall, curtain wall. The rate includes designing of concrete mix, manufacturing of concrete by concrete batching plant, cost of form work including erection & de-shuttering, batching plant, placement of concrete by concrete pump, compaction including cutting ,bending & binding of reinforcement with binding wires & placing in proper position ,curing of concrete up to specified period complete in all respect including all lead ,lift crossing road/track etc. The rate also including cost of all ingredients including cement admixture, labour, tools, planta etc. Steel reinforcement supply will be paid separately | cum | 1072.00 | 12,332 | 1,32,19,904 |
| 8 | Makings of sleeper cribs including dismantling and removal of therefrom the side placing of 45'-0"span relieving steel girders for safe passage of train including removal thereof, other ancillary works complete in all respect as will be required for safe movement of Trains. The works shall be done as per direction and upto the complete satisfaction of the Railway's Engineer in charge of the work. The rate includes earth work in excavation in all type of soil as require for making the sleeper cribs and placement of relieving girder including removal of the earth or any other materials like ballast, boulder etc. Away from the site of work as required, removal of the existing track to facilitate placement of relieving girders, Linking of track on the relieving girder, Other attention to track as required for safe movement of trains. The rate also includes all lead, Lift crossing of Railway track or any other obstruction, Supply of tools plants, labour, fuel etc. All p-way materials required for completion of this item and wooden sleepers for making of wooden cribs etc. Shall be supplied by the railway free of cost either at the site of work or from the store of PWI or from any other place between the site of work, and the store of PWI and the rate is inclusive thereof, The relieving girders shall be supplied by the Railway free of cost at the site of work. The rate also includes removal of the existing track including dismantled materials at the side of work and transportation. Thereof to the store PWI . **Note- Unit 'Numbers' to be read as 'SPAN'** | Numbers | 2.00 | 90,463 | 1,80,926 |
| 9 | Assistance to Crane work as directed by site-in-charge prior to Crane work like preparation of base for prop. by dressing of earth filling and placing of sand bags at required distance from the bridge approach and cutting of holding down bolts before lifting of Girder and also after lifting of Girder for proper seating of slabs, cutting of other infringements like old pipes for shifting of Cables etc. and dismantling of Cribs prepared earlier. This includes lifting of ballast in bags in cess around bridge or assisting any other type of lifting of ballast on the bridges and approaches. Assisting, unloading, loading, lifting, loading of different Crane materials from the Crane for Crane working. | Job | 4.00 | 7,477 | 29,908 |
| 10 | Cost of Railway (140-MT) BD crane hiring charges. | Per Day | 2.00 | 9,34,191 | 18,68,382 |
| 11 | Dismantling of existing track including segregating and stacking of released components such as Rails, sleepers, fittings etc. at site as per instruction of Engineer In charge or his representatives. All dismantled materials like sleepers, fittings and plants etc. except Rail are to be deposited to concerned PWI/ Stores or as instructed by Site in charge. The rate is inclusive of all tolls & plants all lead, lift, transportation, complete in all respect and no extra payment will be made on any account for this work | Track metre | 200.00 | 323 | 64,600 |
| 12 | Linking of track with new rails/ existing rails at site to the proper alignment with 52Kg/ 60Kg. rails & PSC sleepers with M+7 or M+8 density including complete fitting ensuring correct spacing of sleepers, squaring, maintaining proper gauge, alignment, Cross level etc. Complete in all respect. | Track metre | 200.00 | 416 | 83,200 |
| 13 | Supplying and spreading the sand/stone dust over RCC box and in foundation including compaction by machine means as approved by Railway Engineer at site .The work is to be done during traffic block. | cum | 680.00 | 599 | 4,07,320 |
| 14 | Extra over sand stone dust filling over item no.supplying and spreading sand/stone dust over RCC BOX/ or item no.15 (during block ) | cum | 60.00 | 731 | 43,860 |
| 15 | Extra over Earth work in cutting in foundation trolley refeges side drain cross drain etc. over (USSR-013111-03) ,ITEM NO.11 OF SCHEDULE (During block period). | cum | 1760.00 | 2,340 | 41,18,400 |
| 16 | Supply, fabrication and installation of H-piles with M.S. sheets lagging or sheet piles complete with all runners, struts, wales, brackets, steel packing stiffner, bracing, etc. including all lead, lift, tools, tackles and plants. The payment shall be made as per actual weight of steel used including the weight of MS plate lagging for H-piles with all contractor's labour, material, tools, plants, welding set, driving rig, hammer, etc. complete. Note: i) The contractor shall ensure judicious use of the released liners for the purpose of the lagging. It should be noted that no MS plate shall be supplied by Railway for this purpose. ii) Sheet piles may be used in place of H-piles & lagging, for which also same rate will be applicable. Total weight of sheet piles, etc. (supplied by contractor) used for shoring shall be considered for payment. | Metre | 1000.00 | 59,451 | 5,94,51,000 |
| 17 | Boring 150mm / 200mm dia bore holes by hand or by mechanical augering of suitable process in all kinds of soil like sand, silt, clay etc. (excluding Rocks) collecting disturbed & undisturbed samples at every 1.5m or less depending upon changes in layer/ strata as per standard method specified in IS code, preserving disturbed samplesin properly sealed and lebelled polethene bags, mesurement of ground water table, conducting standard penetration test in bore holes in every 1.50m depth interavals as per IS: 2131-1981, preparing field bore log simulteanously with the progress of boring and submisssion of the same alongwith the disturbed samples placed in order of ascending depth immediately after completion of bore hole. Mobilization of plants, equipments, at each bore hole location will be of Contractor's own cost from ground level to 15m. | Metre | 80.00 | 731 | 58,480 |
| 18 | Submisssion of report on sub soil investigation in 03 copies which shall include (i) site plan showing position of bore hole, (ii) detailed longitudinal section of each bore hole showing the classification of soil and values of important parameters i.e. N.C. & P values, (iii) the result of various samples of each bore holes in proper tabuler form (as per IRC- 78- 1983 Sh- 2) (iv) Calculation of bearing capacity of soil & settlement of pile/ open foundation with specific design load. (v) Bearing capacity & technical recommendation of deep foundation for proposed structure. (vi) Classification of soil showing different strata with all soil parameter. (VII) Every bore hole should show ground level & bed level. (VIII) Level of ground to water level. (IX) In case rock is encountered, classification & characteristic of rock, RQD, safe bearing capacity, founding level should be mentioned. Nature of cleavage plane to be specified. (X) Report should show recommendation of type of foundation with detailed calculation for bearing capacity, settlement & embedment in incompressible layer/ Rock as per latest IS/ IRC/ IRS recommendations. One set of work includes the soil investigation conducted as per instruction of Engineer- In - Charge as per site condition. | Each Job | 1.00 | 63,610 | 63,610 |
| 19 | Erection/launching of newly assembled girders and placement of the same on proper alignment line and level under traffic block with the help of Road crane/crane or any other means arranged by the contractor at his own cost duly maintaining safety. The erection scheme is to be submitted by the contractor and the work will be carried out after approval of the scheme by the railway authority. The rate is inclusive of all men and materials like tools & plants & obstacles, heavy machines road cranes etc. required to carry out the work as required. All ancillary works as required for erection. | MT | 1000.00 | 19,783 | 1,97,83,000 |
| 20 | Maintance of track over reliving girder and its approaches ensuring the safty of track by maintaining correct gauge,alignment ,longitudinal and cross levels as per IRPWM fit for 30kmph including tighening/recouping of all fittings and fastening over relieving girder and its approaches etc. with contractor's labour,tools ,plants equipment etc as per direction of site engineer in charges as a complete job.The rate shall also include the protection of bank in case of settlement of sleeper/CC crib.Contractor has to provide the gang of minimum 15 labours along with supervisor experienced in track work per day including one watchman from 5.0PM to 8.0 AM.The payment under this item shall be made after launching of reliving girder till the removal of same .Note:A penalty of Rs.500/-per labour per day shall be imposed in case of Non availbility of any labour/supervisor .In charge in this regard shll be final & binding to contractor. | Day | 200.00 | 7,596 | 15,19,200 |
| 21 | Pushing /insertion /placing of pre-cast RCC Box of internal diamension 6.0mx6.0 m (approx)through air pushing during block/Non block period in previously fully/parting excavation embankment for all heights and depth including normal to embankment or in skew including designing /providing /fixing of steel fram for pushing of precast RCC Box and its apprival by Railway.Rate is inclusive of cost of all types of jacks ,power pack,T&P,M.S pins and extension pieces required additional struts forfurther pushing ,consumable ,fuel ,labour,taxes,and supervision etc.including provision of all necessary arrangments for pushing including all leads,lifts,assents,decents,loading ,unloading handling,crossing of stream, nallah,Rly tracks ,level crossing etc. or any other obstruction ,cost of all safety precaution ,all labour and materials as a complete job.The resource deployment shall be adequate enough to ensure controlled air pushing @ 4.03/hrs(effective) nothing extra paid shall be paid on this accouts. | RM | 22.00 | 56,693 | 12,47,246 |
| 22 | Supply, providing, laying & fixing 5mm thick concrete canvas (flexible concrete impregnated fabric that hardness when hydrated to form a thin, durable water proof and fire resistance concrete layer within 24 hrs.) in Limited Height subway and other required work.The rate includes all the cost of lead , lift, loading, unloading, transportation,ascent,decent, crossing of Railway track, road, nullah wherever required, all contractor's labour, materials all taxes,royalty etc. and all the incidental charges to complete in all respect in all respect. Contractor shall submit all relevant test certificates of the materials. Mass of unset concrete canvas should be 75kg/m2. | Sqm | 150.00 | 8,671 | 13,00,650 |
| 23 | Supplying of machine hard stone crushed track ballast confirming to RDS0's specification IRS-GE-1 of June'2016 (as amended vide upto date correction slips) including leading to point loading and loading the same into BOBYN type wagons F.O.R Bakudih quarry. The rate is inclusive of all cost, labour, materials, tools, and plants, equipment, machinery, all ead/lift, handling/ re-handling, loading/unloading, transportation, crossing bf Railways tracks/nalah/river/stream as required, Safety precautions in vicinity of Railway track, inclusive of all Royalties, taxes (including GST) levied by central/state Govt. & local bodies and all other incidental charges etc. complete in all respect. | cum | 900.00 | 1,695 | 15,25,500 |
| 24 | Supplying of wooden block size 2750x250x200mm made of sal wood suitable for temporary arrangement of Relieving Girder as per direction of site Engineer in charge.These blocks shall become property of Railway after completion of work. | cum | 50.00 | 95,704 | 47,85,200 |
| 25 | Fabrication, supplying and fixing of retro-reflective signage boards made of high-intensity grade encapsulated lens type retro-reflective sheeting conforming to ASTM D 4956 Type-III specifications and having approved patterns over its entire surface bonded on to 2mm thick aluminium sheet with back supporting angle iron frame (40X40X6)mm duly reveted with solid M.S. and aluminium revets, etc. The entire face of the sign board should be covered and bonded with yellow/red/white/blue high intensity encapsulated lens type reflecting sheeting with distinctive lined patterns on front side on plain surface with heat lamp vaccuum machine only. The white/blue/yellow/red portion of the board shall be screen printed on the high intensity sheet base including fixing the bolt on portal/support/wall/dowel rod, etc. with contractor's clamp/cleat/bolt/revet/weld including all contractor's material, labour, tools and plants including all lead, lift and all other incidental charges necessary for successful completion of the work as per specifiction and as directed by Engineer in charge | Sqm | 15.00 | 4,687 | 70,305 |
| Schedule total | ₹12,70,88,871 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
CheckList_2.pdf
ATTACHMENT
FormVIB.pdf
ATTACHMENT
GCC_April-2022_2022_CE-I_CT_GCC-2022_POLICY_27.04.22.pdf
ATTACHMENT
FormVA.pdf
ATTACHMENT
GCCAcs6.pdf
ATTACHMENT
FormV.pdf
ATTACHMENT
GCC2022ACS-3_20230426_114140.pdf
ATTACHMENT
GCCACS4.pdf
ATTACHMENT
Commercialcompliance.pdf
ATTACHMENT
TechnicalCompliance.pdf
ATTACHMENT
ACS-2toGCC-2022.pdf
ATTACHMENT
GCCACS5.pdf
ATTACHMENT
GCCACS.pdf
ATTACHMENT
ModifiedTDofHQ-29.08.25.pdf
ATTACHMENT
GCCAcs7.pdf
ATTACHMENT
GCC-2022ACS9.pdf
ATTACHMENT
Tele_Cir_17-2013regardingcablecut.pdf
ATTACHMENT
BGFormat.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .