| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.0 LAdmitted-Finance | ₹9.0 L | L1 | Admitted-Finance |
| 2 | L2₹9.3 LAdmitted-Finance | ₹9.3 L | L2 | Admitted-Finance |
| 3 | L3₹9.5 LAdmitted-Finance | ₹9.5 L | L3 | Admitted-Finance |
| 4 | L4₹10.1 LAdmitted-Finance | ₹10.1 L | L4 | Admitted-Finance |
| 5 | L5₹10.8 LAdmitted-Finance | ₹10.8 L | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | IMPLA GENERAL SUPPLIERS L4 | Heaven Electricals L3 | M/S MODERN POWER SOLUTIONS L1 | S A S ELECTRIC WORKS L5 | M/S WANI ELECTRICAL CONTRACTOR L2 |
|---|---|---|---|---|---|---|---|---|
| 1.00Work items identified; | ||||||||
| 1.01 | Supply,Installation ,testing and commisioning of 9mtr (410 SP-33) long Steel Tubular Poles complete with base plate(350x350x5mm), top cap, Earthing Channel (75x40x6) including digging of pit ,positioning etc, complete in all respect as per Relevant IS. | 24 | Nos. | 16,000 ₹3.8 L | 15,000 ₹3.6 L | 16,800 ₹4.0 L | 16,000 ₹3.8 L | 15,200 ₹3.6 L |
| 2.01 | Supply,Installation ,testing and commisioning of 8mtr (410 SP-15) long Steel Tubular Poles complete with base plate(350x350x5mm), top cap, Earthing Channel (75x40x6) including digging of pit ,positioning etc, complete in all respect as per Relevant IS. | 18 | Nos. | 11,500 ₹2.1 L | 11,900 ₹2.1 L | 11,000 ₹2.0 L | 11,000 ₹2.0 L | 11,000 ₹2.0 L |
| 3.01 | Supply,laying, stringing, tensioning, binding of 50 Sqmm ACSR Conductor complete in all respects as per Relevant IS. | 4.4 | Km. | 52,000 ₹2.3 L | 40,000 ₹1.8 L | 30,000 ₹1.3 L | 49,000 ₹2.2 L | 43,000 ₹1.9 L |
| 4.01 | Supply Carraige upto site, fixing of GI V Cross arm & GI F Top with clamps duly fabricated as per site requirement including clamps, GI Nuts & Bolts,washers etc complete in all respects as per Relevant IS. | 504 | Kg | 125 ₹63,000 | 120 ₹60,480 | 127 ₹64,008 | 135 ₹68,040 | 115 ₹57,960 |
| 5.01 | Supply,Carraige upto site,Installation,testing and Commissioning of 11 KV polymer composite Pin Insulators 12 kv.5KN, Lighting impulse 75 Kv positive and 80 Kv negative, Creepage distance 320mm complete in all respects as per Relevant IS. | 72 | No. | 200 ₹14,400 | 170 ₹12,240 | 190 ₹13,680 | 275 ₹19,800 | 160 ₹11,520 |
| 6.01 | Supply,Carraige upto site,Installation,testing and Commissioning of 11 KV polymer composite Disc Insulators 12 kv.45 KN, Lighting impulse 75 Kv positive and 80 Kv negative, Creepage distance 320mm complete in all respects as per Relevant IS. | 6 | set | 200 ₹1,200 | 1,200 ₹7,200 | 50 ₹300 | 375 ₹2,250 | 50 ₹300 |
| 7.01 | Supply,Carraige upto site,Installation,testing and Commissioning ofgalvanised stay set with 50x8mm stay clamp,guy insulator(2 No.s),anchor plate(200x200x6mm) nuts and bolts ,2 nos turn buckles,1.8 m long,16 mm diameter solid GS stay rod & 7/3.15 mm dia GI starnded wire complete | 4 | No.s | 100 ₹400 | 1 ₹4 | 10 ₹40 | 1,500 ₹6,000 | 50 ₹200 |
| 8.01 | Supply,Carraige upto site,Installation,testing and Commissioning of GI Mukhi Clamps as per standards | 135 | Kgs | 125 ₹16,875 | 120 ₹16,200 | 110 ₹14,850 | 140 ₹18,900 | 115 ₹15,525 |
| 9.01 | Supply,Carraige upto site,Installation,testing and Commissioning of 16 KN shackle insulators | 50 | No.s | 50 ₹2,500 | 50 ₹2,500 | 35 ₹1,750 | 100 ₹5,000 | 40 ₹2,000 |
Tender Value
₹12.4 L
EMD Value
₹24,720
Closing Date
11 Dec 2025, 6:00 pmClosed
Executive Engineer ED Budgam KPDCL
Executive Engineer ED Budgam KPDCL
Restoration of HT/LT network under SDRF damaged at Various places due to floods.
2025_PDD_297130_1
89 of 2025-26
Open Tender
Electrical and Maintenance Works
30 days
ED Budgam, KPDCL
AS PER SBD
7 documents required · 7 mandatory
₹1,000
Executive Engineer ED Budgam KPDCL
₹24,720
15 Dec 2025
3 Dec 2025
12 Dec 2025
3 Dec 2025
11 Dec 2025
4 Dec 2025
3 Dec 2025 - 4 Dec 2025
Amount
Work items identified;
Supply,Installation ,testing and commisioning of 9mtr (410 SP-33) long Steel Tubular Poles complete with base plate(350x350x5mm), top cap, Earthing Channel (75x40x6) including digging of pit ,positioning etc, complete in all respect as per Relevant IS.
Supply,Installation ,testing and commisioning of 8mtr (410 SP-15) long Steel Tubular Poles complete with base plate(350x350x5mm), top cap, Earthing Channel (75x40x6) including digging of pit ,positioning etc, complete in all respect as per Relevant IS.
Supply,laying, stringing, tensioning, binding of 50 Sqmm ACSR Conductor complete in all respects as per Relevant IS.
Supply Carraige upto site, fixing of GI V Cross arm & GI F Top with clamps duly fabricated as per site requirement including clamps, GI Nuts & Bolts,washers etc complete in all respects as per Relevant IS.
Supply,Carraige upto site,Installation,testing and Commissioning of 11 KV polymer composite Pin Insulators 12 kv.5KN, Lighting impulse 75 Kv positive and 80 Kv negative, Creepage distance 320mm complete in all respects as per Relevant IS.
Supply,Carraige upto site,Installation,testing and Commissioning of 11 KV polymer composite Disc Insulators 12 kv.45 KN, Lighting impulse 75 Kv positive and 80 Kv negative, Creepage distance 320mm complete in all respects as per Relevant IS.
Supply,Carraige upto site,Installation,testing and Commissioning ofgalvanised stay set with 50x8mm stay clamp,guy insulator(2 No.s),anchor plate(200x200x6mm) nuts and bolts ,2 nos turn buckles,1.8 m long,16 mm diameter solid GS stay rod & 7/3.15 mm dia GI starnded wire complete
Supply,Carraige upto site,Installation,testing and Commissioning of GI Mukhi Clamps as per standards
Supply,Carraige upto site,Installation,testing and Commissioning of 16 KN shackle insulators
Cement bottoming 1:2:4 mix as per Standards 0.5/0.45 cum/pole.
Earthing Complete by GI Pipe 40 mm 3mtr long through GI Strip.25x3mm
Painting of Poles with one coat of Red Oxide and two or more coats of alimunium paint to obtain proper finish/uniformity as per standards.
Supply and fixing of anti climbing device(GI barbed wire with clamps) complete in all respects as per drawings.
Supply of pliers for lineman
Supply of earthing rods
Paint mark of scheme
Supply and fixing of danger plates with clamps as per drawings.
NOTE: 1.The rates quoted by the bidder for all the items shall be inclusive of GST/freight/insurance/storage/installation/testing and any other charges FOR Restoration of HT/Lt network damaged at Chadura Bus Adda F5 under SDRF Restoration of HT/Lt network damaged at Panzan Chadura under SDRF Restoration of HT/Lt network damaged at Wathoora Dangerpora under SDRF Restoration of HT/Lt network damaged at Bangund Hafroo under SDRF Restoration of HT/Lt network damaged at Chalwan Chontinaar under SDRF Restoration of HT/Lt network damaged at Hayatpora under SDRF under SDRF
M/S WANI ELECTRICAL CONTRACTOR (BID ID -2667158)
Heaven Electricals (BID ID -2666214)
IMPLA GENERAL SUPPLIERS (BID ID -2665503)
S A S ELECTRIC WORKS (BID ID -2666880)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.48 MB
Tendernotice_2.pdf
PDF • 1.65 MB
BOQ_962924.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid