Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹32.8 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹35.8 L+₹3.0 L (9.13%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹39.1 L+₹6.4 L (19.4%)Rejected-Finance 11A SECTOR G INDUSTRIAL AREA GOVINDPURA BHOPAL BHOPAL MADHYA PRADESH 462023 | BHOPAL | MADHYA PRADESH | 462023 | L3 | Rejected-Finance L3 | |
| 4 | L4₹40.3 L+₹7.5 L (23.0%)Rejected-Finance E 39 NEW INDUSTRIAL AREA PHASE 2 MANDIDEEP DISTT RAISEN 462046 M P | MANDIDEEP | RAISEN | MADHYA PRADESH | 462046 | L4 | Rejected-Finance L4 | |
| 5 | L5₹47.0 L+₹14.2 L (43.4%)Rejected-Finance GOPAL BAGH JABALPUR MADHYA PRADESH MP | JABALPUR | MADHYA PRADESH | 482001 | L5 | Rejected-Finance L5 |
Tender Value
₹69.9 L
EMD Value
₹69,900
Closing Date
19 Nov 2025, 5:30 pmClosed
Executive Engineer
1st floor Tawa complex, E-5 Arera Colony, Bittan Market Bhopal
High mast installation with operation and maintenance for 36 months at different industrial areas under MPIDC RO Sagar Distt Sagar (M.P.)
2025_MIDCL_459678_1
07 Sagar of 2025-26
Open Tender
Electrical and Maintenance Works
Percentage
MPIDC RO Sagar
As per tender documents
2 documents required · 2 mandatory
₹11,800
₹69,900
25 Feb 2026
30 Oct 2025
21 Nov 2025
30 Oct 2025
19 Nov 2025
30 Oct 2025
eProcurement System Government of Madhya Pradesh Created By: Surendra Charar Created Date/Time: 05-Jan-2026 02:54 PM Tender Title: High mast installation with operation and maintenance for 36 months at different industrial areas under MPIDC RO Sagar Distt Sagar (M.P.) Tender ID: 2025_MIDCL_459678_1
Tender Inviting Authority: Executive Engineer, MPIDC RO Sagar
Name of Work: High mast installation with operation and maintenance for 36 months at different industrial areas under MPIDC RO Sagar Distt Sagar (M.P.)
Contract No: NIT No. Sagar 07 of 2025-26
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words (Iteration 0)
1.00 SWASTIK ENGINEERS AND CONSULTANTS (GSTN-23ACGFS0773A1ZK) BID ID -1373876 6988277.000 -53.100 3277501.913 Thirty Two Lakh Seventy Seven Thousand Five Hundred and One
2.00 RAVINDRA KUMAR JAIN CONTRACTOR (GSTN-23AHAPJ5744R1Z0) BID ID -1374581 6988277.000 -32.750 4699616.283 Fourty Six Lakh Ninty Nine Thousand Six Hundred and Sixteen
3.00 Shinfield Engineering Pvt. Ltd. (GSTN-23AANCS6574K2ZQ) BID ID -1380316 6988277.000 -42.300 4032235.829 Fourty Lakh Thirty Two Thousand Two Hundred and Thirty Five
4.00 ENERGYGREEN TECHNOPOWER PVT LTD (GSTN-23AAECE7344J1ZM) BID ID -1381563 6988277.000 -44.000 3913435.120 Thirty Nine Lakh Thirteen Thousand Four Hundred and Thirty Five
5.00 POWER PROGRESS INDIA PRIVATE LIMITED (GSTN-NA) BID ID -1379726 6988277.000 -48.820 3576600.169 Thirty Five Lakh Seventy Six Thousand Six Hundred
Lowest Amount Quoted BY: SWASTIK ENGINEERS AND CONSULTANTS(3277501.913)
BOQ Summary Details Tender Title: High mast installation with operation and maintenance for 36 months at different industrial areas under MPIDC RO Sagar Distt Sagar (M.P.) Tender ID: 2025_MIDCL_459678_1
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 SWASTIK ENGINEERS AND CONSULTANTS (BID ID -1373876) 3277501.913 L1
2 POWER PROGRESS INDIA PRIVATE LIMITED (BID ID -1379726) 3576600.169 L2
3 ENERGYGREEN TECHNOPOWER PVT LTD (BID ID -1381563) 3913435.120 L3
4 Shinfield Engineering Pvt. Ltd. (BID ID -1380316) 4032235.829 L4
5 RAVINDRA KUMAR JAIN CONTRACTOR (BID ID -1374581) 4699616.283 L5
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.70 MB
Tenderdoc07.pdf
Tender Documents • 2.42 MB
BOQ_540584.xls
BOQ • 0.22 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .