| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 LAccepted-Finance | L1 | Accepted-Finance As per norms of UPPTCL | |
| 2 | L2₹1.7 L+₹2,460 (1.50%)Accepted-Finance | L2 | Accepted-Finance As per norms of UPPTCL | |
| 3 | L3₹1.7 L+₹6,960 (4.26%)Accepted-Finance HNO 613 P 41 440 SA SITAPUR ROAD GAURBHEETH FAIZULLAGANJ 2 LUCKNOW LUCKNOW UTTAR PRADESH 226020 | LUCKNOW | LUCKNOW | UTTAR PRADESH | 226020 | L3 | Accepted-Finance As per norms of UPPTCL | |
| 4 | Not Admitted-Fee/PreQual/Technical 259 ANAND VIHAR COLONY NAWADA SEKHAN PILIBHIT BYPASS ROAD BAREILLY UTTAR PRADESH 243005 | BAREILLY | UTTAR PRADESH | 243005 | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹2,000
Closing Date
15 Jul 2025, 12:00 pmClosed
Executive Engineer
Electricity Transmission Division, UPPTCL, Hussainganj, Sitapur.
Shifting old and unservisable materials for evacuating and dismantling of store for installation 40 MVA TF.
2025_UPTCL_1054560_1
SHORT TERM E-TENDER NO.6/ETD(S)/2025-26
Open Tender
Electrical Works
Item Rate
30 days
Sitapur
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
A/C No. 10906917956, ISFC Code No. SBIN0000720
₹2,000
19 Jul 2025
5 Jul 2025
15 Jul 2025
5 Jul 2025
15 Jul 2025
5 Jul 2025
5 Jul 2025 - 15 Jul 2025
Amount
Following work is to be carried out for shifting of materials from Yard Store (0007/3) to open store for installation of 40MVA T/F-III at 220KV Substation Sitapur:-
For stacking of materials making space in open yard by cutting of pale fancing /cutting of undesired tree and shifting of already laid old materials for stacking of materials to be shifted from yard store.
Shifting of old and unservisable materials from yard store to nearby store/open store with the help of men power. The work includes shorting of different type of materials and dragging them from store to 40 MVA T/F -I for safety purpose and then loading them into trolly and unloading the materials in open store. All men power (10 men for 9 Days) and T&P will be provided by firm at their on cost.
Hiring of hydra for shifting of materials like transformer bushing, old model 220KV ABCB pole, 220KV and 132KV CT/PT and other heavy materials.
Hiring of tractor trolly for shifting of materials like iron scrap, wooden scrap, old and empty drums and other unservisable/ damaged materials etc.
Stacking of all shifted materials from yard store properly as transformer bushing,heavy old model CT/PT, empty drums etc. with the help of menpower (10 men for 6 Days) and hydra for completion of work.
After stacking of all shifted maretials making fancing of old pales by repairing them and fixing around the materials for safety purpose by electric welding for complition of work satisfactorily.
M/s Pankaj Computers (BID ID -5331340)
jyoti enterprises (BID ID -5331373)
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .