Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.0 LAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | L2₹10.0 L+₹1,050.01 (0.11%)Accepted-Finance | L2 | Accepted-Finance L2 | |
| 3 | L3₹11.1 L+₹1.1 L (10.8%)Accepted-Finance | L3 | Accepted-Finance L3 | |
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification | |
| 5 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹15 L
EMD Value
₹30,000
Closing Date
17 Aug 2026, 6:00 pmClosed
Executive Engineer
PWD (RandB) Division Udhampur
Construction of Niabat Office Ghordi Udhampur (under UT Capex Budget 2026-27)
2026_PWDJK_320322_3
e-NIT 105 of 2026-27 Dated 10.08.2026
Open Tender
Civil Works
Percentage
60 days
Udhampur
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Executive Engineer PWD RandB Division Udhampur
₹30,000
10 Sept 2026
10 Aug 2026
18 Aug 2026
11 Aug 2026
17 Aug 2026
11 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:100% Qty. in All kinds of soil. | 46.34 | cum | 479.3 | ₹22,210.76 |
| 2 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge 100% Qty. in All kinds of soil. | 33.12 | cum | 592.9 | ₹19,636.85 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering all work up to plinth level in 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate) 40mm nominal size crushed. | 7.34 | cum | 5,202.9 | ₹38,189.29 |
| 4 | Providing and laying in position cement concrete 1 cement:3 fine sand:6 graded crushed stone aggregates 20mm size excluding the cost of centring and shuttering- all works upto plinth level 20% Boulders | 26.06 | cum | 4,774.46 | ₹1,24,422.43 |
| 5Centering and shuttering including strutting, propping etc. and removal of form for: | |||||
| 5.1 | Foundations, footings, bases of columns etc. for mass concrete. | 94.57 | Sqm | 286.35 | ₹27,080.12 |
| 5.2 | Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. | 26.35 | Sqm | 628.95 | ₹16,572.83 |
| 5.3 | Lintel, beams, plinth beams, girders, bressumers and cantilevers | 11.8 | Sqm | 577.55 | ₹6,815.09 |
| 5.4 | Columns, pillars, piers, abutments, posts and struts. | 42.12 | Sqm | 742.55 | ₹31,276.21 |
| 5.5 | Edges of Slabs and breaks in floors and walls .under 20 cm wide | 36.28 | rmt | 262.2 | ₹9,512.62 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.59 MB
BOQ_1064582.xls
BOQ • 0.30 MB
File.PDF
PDF • 0.09 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .