Executive Engineer
Electric Division, JPDCL Udhampur
erection, maintenance works of HT, LT lines and creation, Augmentation of substation
2022_PDD_174465_1
ED/UDH/09 of 2022-23, dt. 17-06-2022.
Open Tender
Electrical and Maintenance Works
Item Rate
5 days
Different loactions in District Udhampur
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
Executive Engineer Electric Division JPDCL
₹60,000
12 Aug 2022
18 Jun 2022
4 Jul 2022
18 Jun 2022
2 Jul 2022
18 Jun 2022
18 Jun 2022 - 25 Jun 2022
Erection/Maintenance of HT/LT Line & Creation/Augmentation of Substations
Erection of PCC 8 Mtr Pole
Erection of PCC 9 Mtr Pole
Erection of PCC 11 Mtr Pole
Erection of ST 8 Mtr Pole
Erection of ST 9 Mtr Pole
Erection of ST 11 Mtr Pole
Erection of ST 13 Mtr Pole
Dismantling of PCC Pole 8 Mtr Long
Dismantling of PCC Pole 9 Mtr Long
Dismantling of PCC Pole 11 Mtr Long
Dismantling of ST Pole 8 Mtr Long
Dismantling of ST Pole 9 Mtr Long
Dismantling of ST Pole 11 Mtr Long
Dismantling of ST Pole 13 Mtr Long
Unloading of PCC 8 Mtr Pole
Unloading of PCC 9 Mtr Pole
Unloading of PCC 11 Mtr Pole
Unloading of ST 8 Mtr Pole
Unloading of ST 9 Mtr Pole
Unloading of ST 11 Mtr Pole
Unloading of ST 13 Mtr Pole
loading of PCC 8 Mtr Pole
loading of PCC 9 Mtr Pole
loading of PCC 11 Mtr Pole
loading of ST 8 Mtr Pole
loading of ST 9 Mtr Pole
loading of ST 11 Mtr Pole
loading of ST 13 Mtr Pole
Average carriage of PCC 8 Mtr Pole upto 100 Mtr
Average carriage of PCC 8 Mtr Pole upto (101-200) Mtr
Average carriage of PCC 9 Mtr Pole upto 100 Mtr
Average carriage of PCC 9 Mtr Pole upto (101-200) Mtr
Average carriage of PCC 11 Mtr Pole upto 100 Mtr
Average carriage of PCC 11 Mtr Pole upto (101 -200) Mtr
Average carriage of ST 8 Mtr Pole upto 100 Mtr
Average carriage of ST 8 Mtr Pole upto (101 -200) Mtr
Average carriage of ST 9 Mtr Pole upto 100 Mtr
Average carriage of ST 9 Mtr Pole upto (101 -200) Mtr
Average carriage of ST 11 Mtr Pole upto 100 Mtr
Average carriage of ST 11 Mtr Pole upto (101-200) Mtr
Average carriage of ST 13 Mtr Pole upto 100 Mtr
Average carriage of ST 13 Mtr Pole upto (101 -200) Mtr
Installation of Link Set
Installation of DO Set
Installation of HG Set
Installation of GO Set
Installation of LA Set
Average carriage of 25 KVA Transformer upto 100 Mtr
Average carriage of 63 KVA Transformer upto 100 Mtr
Average carriage of 100 KVA Transformer upto 100 Mtr
Average carriage of 25 KVA Transformer (101 - 200) Mtr
Average carriage of 63 KVA Transformer (101 - 200) Mtr
Average carriage of 100 KVA Transformer (101 - 200) Mtr
Average carriage of 250 KVA Transformer upto 100 Mtr
Average carriage of 300 KVA Transformer upto 100 Mtr
Average carriage of 400 KVA Transformer upto 100 Mtr
Average carriage of 500 KVA Transformer upto 100 Mtr
Average carriage of 630 KVA Transformer upto 100 Mtr
Average carriage of 250 KVA Transformer (101 - 200) Mtr
Average carriage of 300 KVA Transformer (101- 200) Mtr
Average carriage of 400 KVA Transformer (101 - 200) Mtr
Average carriage of 500 KVA Transformer (101 - 200) Mtr
Average carriage of 630 KVA Transformer (101 - 200) Mtr
loading of 25 KVA Transformer
loading of 63 KVA Transformer
loading of 100 KVA Transformer
loading of 250 KVA Transformer
loading of 300 KVA Transformer
loading of 400 KVA Transformer
loading of 500 KVA Transformer
loading of 630 KVA Transformer
Unloading of 25 KVA Transformer
Unloading of 63 KVA Transformer
Unloading of 100 KVA Transformer
Unloading of 250 KVA Transformer
Unloading of 300 KVA Transformer
Unloading of 400 KVA Transformer
Unloading of 500 KVA Transformer
Unloading of 630 KVA Transformer
Mounting of 25 KVA Transformer
Mounting of 63 KVA Transformer
Mounting of 100 KVA Transformer
Mounting of 250 KVA Transformer
Mounting of 300 KVA Transformer
Mounting of 400 KVA Transformer
Mounting of 500 KVA Transformer
Mounting of 630 KVA Transformer
Erection of Guys in HT Line
Erection of Guys in LT Line
Earthing of Substation complete (Poles, Transformer, CT/PT, LA)
Dismantling of Link Set
Dismantling of DO Set
Dismantling of G O Set
Dismantling of HG Set
Dismantling of LA Set
Dismantling of GO Set
Erection of Jumper Set HT Side
Erection of Jumper Set LT Side
Dismantling of Jumper Set HT Side
Dismantling of Jumper Set LT Side
Dismounting of 25 KVA Transformer
Dismounting of 63 KVA Transformer
Dismounting of 100 KVA Transformer
Dismounting of 250 KVA Transformer
Dismounting of 300 KVA Transformer
Dismounting of 400 KVA Transformer
Dismounting of 500 KVA Transformer
Dismounting of 630 KVA Transformer
Erection of ACSR Squirel Conductor
Erection of ACSR Weasel Conductor
Erection of ACSR Rabbit Conductor
Erection of ACSR Dog Conductor
Dismentling of ACSR Squirel Conductor
Dismentling of ACSR Weasel Conductor
Dismentling of ACSR Rabbit Conductor
Dismentling of ACSR Dog Conductor
Tightening of loose conductor Squirrel/Weasel
Tightening of loose conductor Rabbit/Dog
Route clearance
Fixing of LT Circuit Component of Substation (LT cables, Thimbles, Busbar, Shackle insulators) with Fuse Set / MCCB with Box
Dismantling of LT Circuit Component of Substation (LT cables, Thimbles, Busbar, Shackle insulators) with Fuse Set / MCCB with Box
Branch Cutting
Unloading T & P items i.e Line materials Substations/HT/LT lines
Loading T & P items i.e Line materials Substations/HT/LT lines
Average carriage of T & P items i.e Line materials Substations/HT/LT linesupto 100 Mtr
Average carriage of T & P items i.e Line materials Substations/HT/LT lines (101 - 200) Mtr
Survey/Route Alignment
Drilling of Holes /Each
Fixing/Installation of 11 KV Disc Insulators with fittings
Dismentling of 11 KV Disc Insulators with fittings
Fixing of U-Clamps and Shackle Insulators
Dismentling of U-Clamps and Shackle Insulators
Fixing of 11 KV Pin Insulators with Pins
Dismentling of 11 KV Pin Insulators with Pins
Fixing of Top Clamps for Pin Insulators
Dismantling Fixing of Top Clamps for Pin Insulators
Fixing of Braces
Dismantling of Braces
Fixing of Danger Plates
Dismentling of Danger Plates
Fixing of Anti Climbing Devices Plates
Dismentling of Anti Climbing Devices
Painting of Steel Tubular Poles Including Cross arms clmaps etc. (Upto 9 Mtr.)
Painting of Steel Tubular Poles Including Cross arms clmaps etc. (Above 9 Mtr.)
Painting of Cross arms and Clamps of PCC/Wodden Poles.
Providing of earthing (Spiral/Pipe/Rod Type) including fixing to the pole and cross arm etc.
Fixing of Spacers for LV Lines (for 5 Wire System)
Fixing of Spacers for LV Lines (for 4 Wire System)
Fixing of Spacers for LV Lines (for 3 Wire System/ 2 wire System)
Fixing of Pre fabricated bracket and cross arm bed for placement of transformer (for transformers upto including 250 KVA)
Fixing of MS Channels 2/1 feet long along with Braces
Fixing of MS Channels 5/4.5/4/3 feet long along with Braces
Fixing of MS Channels 10/9/7/6 feet long along with Braces
Fixing of M S Angle Iron 9/8/7/6 feet long
Fixing of MS Angle Iron 5/ 4.5/ 3 feet long
Unloading of CT/PT Unit
Average carriage of CT/PT Unit upto 100 Mtr
Average carriage of CT/PT upto (101 - 200) Mtr
Erection of CT/PT Unit along with Trivector Meter
Erection of CT PT Unit
Testing and commissioning of CT/PT Unit
Fixing of Suspension/Anchoring Clamps
Laying of HT AB Cable 35 mm sq
Laying of HT AB Cable 50 mm sq
Laying of HT AB Cable 70 mm sq
Laying of HT AB Cable 95 mm sq
Laying of HT AB Cable 120 mm sq
Laying of HT AB Cable 185 mm sq
Laying of HT AB Cable 300 mm sq
Laying of HT AB Cable 400 mm sq
Laying of HT XLPE Cable 35 mm sq
Laying of HT XLPE Cable 50 mm sq
Laying of HT XLPE Cable 70 mm sq
Laying of HT XLPE Cable 95 mm sq
Laying of HT XLPE Cable 120 mm sq
Laying of HT XLPE Cable 185mm sq
Laying of HT XLPE Cable 300 mm sq
Laying of HT XLPE Cable 400 mm sq
Laying of LT AB Cable 35 mm sq
Laying of LT AB Cable 50 mm sq
Laying of LT AB Cable 70 mm sq
Laying of LT AB Cable 95 mm sq
Laying of LT AB Cable 120 mm sq
Laying of LT AB Cable 185 mm sq
Laying of LT AB Cable 300 mm sq
Laying of LT AB Cable 400 mm sq
Laying of LT XLPE Cable 35 mm sq
Laying of LT XLPE Cable 50 mm sq
Laying of LT XLPE Cable 70 mm sq
Laying of LT XLPE Cable 95 mm sq
Laying of LT XLPE Cable 120 mm sq
Laying of LT XLPE Cable 185 mm sq
Laying of LT XLPE Cable 300 mm sq
Laying of LT XLPE Cable 400 mm sq
Dismantling of HT AB Cable 35 mm sq
Dismantling of HT AB Cable 50 mm sq
Dismantling of HT AB Cable 70 mm sq
Dismantling of HT AB Cable 95 mm sq
Dismantling of HT AB Cable 120 mm sq
Dismantling of HT AB Cable 185 mm sq
Dismantling of HT AB Cable 300 mm sq
Dismantling of HT AB Cable 400 mm sq
Dismantling of HT XLPE Cable 35 mm sq
Dismantling of HT XLPE Cable 50 mm sq
Dismantling of HT XLPE Cable 70 mm sq
Dismantling of HT XLPE Cable 95 mm sq
Dismantling of HT XLPE Cable 120 mm sq
Dismantling of HT XLPE Cable 185mm sq
Dismantling of HT XLPE Cable 300 mm sq
Dismantling of HT XLPE Cable 400 mm sq
Dismantling of LT AB Cable 35 mm sq
Dismantling of LT AB Cable 50 mm sq
Dismantling of LT AB/ Cable 70 mm sq
Dismantling of LT AB Cable 95 mm sq
Dismantling of LT AB Cable 120 mm sq
Dismantling of LT AB Cable 185 mm sq
Dismantling of LT AB Cable 300 mm sq
Dismantling of LT AB Cable 400 mm sq
Dismantling of LT XLPE Cable 35 mm sq
Dismantling of LT XLPE Cable 50 mm sq
Dismantling of LT XLPE Cable 70 mm sq
Dismantling of LT XLPE Cable 95 mm sq
Dismantling of LT XLPE Cable 120 mm sq
Dismantling of LT XLPE Cable 185 mm sq
Dismantling of LT XLPE Cable 300 mm sq
Dismantling of LT XLPE Cable 400 mm sq
Fixing of Heat Shrinkable Outdoor Kit for AB/XLPE cables of HT Lines
Fixing of Straight Through Cable Jointing Kit for AB/XLPE cables of LT Lines
Dismantling of Pin Insulators
Dismantling of MS Channels 4.5/3 feet long along with Braces
Dismantling of M S Angle Iron 9 feet long
Dismantling of MS Angle Iron 5/4.5/3 feet long
Fixing of IPC 120/50mm
Transportation of Write back of Dismantled Material to Divisional Store Udhampur
Laying of LT PVC Single Core Cable 95 mm sq for Dt's
Laying of LT PVC Single Core Cable 185 mm sq for Dt's
Laying of LT PVC Single Core Cable 300 mm sq for Dt's
Laying of LT PVC Single Core Cable 400 mm sq for Dt's
Laying of LT PVC Single Core Cable 630 mm sq for Dt's
Fixing of Al. Thimbles of different Sizes 95/120/150 mm for Dt's
Fixing of Al. Thimbles of different Sizes 185/240 mm for Dt's
Fixing of Al. Thimbles of different Sizes 300 mm for DT's
Fixing of Al. Thimbles of different Sizes 400 mm for Dt's
Fixing of Al. Thimbles of different Sizes 630 mm for Dt's
Stone Pad (300 mmx 300 mm x 75 mm)
Fixing of Aluminium Jointing Sleeves
Fixing of Suspension/Tension Clamp with eye hook
Fixing of Wedge connectors/PG Calmps
Fixing of GI Barbed wire for anti climbing
Fixing of LT Distribution Box for 63/100 KVA DTR with MCCB for incomer & SFU's for Outgoing Corcuits
Fixing of LT Distribution Box for 200/250/300/400 KVA DTR with MCCB for incomer & SFU's for Outgoing Corcuits
Fixing of LT Distribution Box for 500/630 KVA DTR with MCCB for incomer & SFU's for Outgoing Corcuits
Fixing of 32/63 amps TPN Switch Disconnector Fuse Unit
Dismantling of old 3-phase energy meter
Erection of Prodigy Meter
Cement concrete 1:2:4 mixed with 60% Boulder for Construction of Platform for Transformer including Cost of materials (Cement, Bazri, stone & Sand) & Charges of Shuttering
Fixing of bobin insulator
Making & Fixing of cradle guard of 8 SWG G.I. Wire comprising of 10 no. cross pieces per spam including connection to earth on both side
Fabrication, Instalation, Testing and commissioning of LT fuse set comprising of requisite Al bus bar mounted on LT polymer insulator assembled on angle iron frame including necessary clamps
Straightening of 11 mtr long ST Pole (ST-410SP56)
Straightening of 9 mtr long ST Pole (ST-410SP33)
Straightening of 8 mtr long ST Pole (ST-410SP15)
Straightening of 9 mtr long PCC Pole
Straightening of 8 mtr long PCC Pole
Dismantling of HT/LT Leads
Raina Builders and Suppliers
AJAY KAPOOR
M/s GCS Associates
VAISHALI ELECTRICALS AND GENERAL ORDER SUPPLIERS
ADITYA SHARMA
RAGHAV SARIN
SAI ENGINEERING AND CONTRACTOR
R K ELECTRICALS CONSTRUCTION AND SUPPLIERS
M R ENGINEERS & TRADERS
vijay builders
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .