Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹15.8 L
EMD Value
₹16,200
Closing Date
26 Oct 2026, 5:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
SE R and B Division No-II
Office of SE R and B Division No-II
STMC - For 1 no of road for a length of 3.04 km under Rayagada (R and B) Division-II,Rayagada (Package No -1)
2026_EICCL_143027_1
TCN-9/2026-27
Open Tender
Civil Works - Roads
Percentage
360 days
Rayagada
2 documents required · 2 mandatory
₹6,000
₹16,200
Yes
12 Oct 2026
12 Oct 2026
27 Oct 2026
12 Oct 2026
26 Oct 2026
12 Oct 2026
12 Oct 2026 - 25 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material upto 1000m lead including cost of all labour, machinery etc complete as per Technical Specifications and Clause - 201 of MoRT&H Specifications for Road & Bridge works (5th Revision) &including cost of all materials, labour, T&P,Cess, EMF,DMF and aditinal charges, royalty etc complete in all respect and as per direction of the Engineer-in-charge. | 7,512 | Sqm | 8.63 | ₹64,828.56 |
| 2 | Providing and Applying Tack coat with bitumen emulsion @ 0.2 kg of bitumen per sqm. On the prepared bituminous/ granular surface including scraping and cleaning the road surface as per clause-501 & 503 of MoRT&H specification for Road & Bridge works (5th Revision), including hire and running charges of all machineries, including cost, conveyance, royalty and EMF,DMF and aditinal charges of all materials, all labour with T&P, Cess required for the work etc. complete as per technical specification and direction of Engineer-in-Charge. | 1,061.91 | Sqm | 18.4 | ₹19,539.14 |
| 3 | Providing and laying 25 mm thick compacted Semi Dense Bituminous Concrete (Grading-II) using 60/70 penetration grade Bitumen and crusher broken hard granite aggregates of specified grading, premixed with bituminous binder @ 5 per cent of weight of mix and filler in a Hot Mix Plant of 100-120 TPH, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction including cost of all materials, labour, T&P,Cess, EMF,DMF and aditinal charges, royalty etc complete in all respect and as per direction of the Engineer-in-charge. | 26.55 | Cum | 13,564.45 | ₹3,60,136.15 |
| 4 | Providing Bituminous Macadam of grading -2 using crushed stone Gr.-2 materials & 60/70 penetration grade of bitumen, preparing preemixed materials with hot mix plant, transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled including cost, conveyance, royality of all materials & cost of all labour, machinery etc complete as per clauses 501 and 504 of MoRT&H Specifications for Road & Bridge works (5th Revision) &including cost of all materials, labour, T&P, Cess ,EMF,DMF and aditinal charges, royalty etc complete in all respect and as per direction of the Engineer-in-charge. | 10.62 | Cum | 10,127.63 | ₹1,07,555.43 |
| 5 | Providing, laying, spreading & compacting graded stone aggregate to wet mix macadam specification including premixing the material at OMC in mechanical mix plant, carriage of mixed material to site, laying in uniform layers on well prepared surface & compacting to achieve the desired density including cost, conveyance, royality of all materials & cost of all labour, machinery etc complete as per approved Drawing & Technical Specifications and Clause -406 of MoRT&H Specifications for Road & Bridge works (5th Revision) including cost of all materials, labour, T&P, EMF,DMF and aditinal charges royalty etc complete in all respect and as per direction of the Engineer-in-charge. | 15.93 | Cum | 2,453.91 | ₹39,090.79 |
| 6 | Construction of embankment with materials deposited at site from road way cutting and foundation of CD & structures graded and initial lead of 1000m and initial lift and compacted to meet requirement of table 300.2 & Clause 305 of MORT&H specifications including cost, conveyance, spreading, watering, grading & compacting using Vibratory Road Roller, including cost of all materials, labour, T&P, EMF,DMF and aditinal charges etc complete in all respect and as per direction of the Engineer-in-charge. | 243.32 | Cum | 274.61 | ₹66,818.11 |
| 7 | Providing compacted granular materials in shoulder by using moorum having required P.I. value with sand admixture if required, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC and compacting with vibratory roller to achieve the desired density, as per approved Drawing & Technical Specifications and as per Clause - 407 of MoRT&H Specifications for Road & Bridge works (5th Revision) including cost, conveyance, royality & other taxes of materials, cost of labour, machinery, etc complete.including cost of all materials, labour, T&P,Cess, EMF,DMF and aditinal charges etc complete in all respect and as per direction of the Engineer-in-charge. | 54.07 | Cum | 970.27 | ₹52,462.5 |
| 8 | Clearing slab/ box type culverts and pipe culverts including clearing, cleaning and reshaping of upstream and down stream faces of these culverts within right of way. The job includes disposal of excess material recovered from site including vegetation outside ROW with all leads and lifts complete in all respect as per direction of Engineer In-Charge and as per maintenance standards Clause no 3.1.(Frequency of cleaning will be one time in a year i.e. before start of monsoon) including cost of all materials, labour, T&P,Cess, EMF,DMF and aditinal charges etc complete in all respect and as per direction of the Engineer-in-charge. | 13.44 | Cum | 235.7 | ₹3,167.81 |
| 9 | Painting 2 coats with Syntatic Enamel paint over a coat of primer of any elevation on road kerb,Parapet & Guard post after cleaning surface including cost of materials, cost conveyance and EMF,DMF and aditinal charges of all materials and labour with T&P,Cess required for the work etc. complete in all floors as per direction of the Engineer-in-charge. | 450.6 | Sqm | 84.52 | ₹38,084.71 |
| 10 | Tree painting Water bond cement paint two coats over a coat of white wash with approved coloring materials on the prepared surface with cost conveyance royalties and EMF,DMF and aditinal charges of all the materials and all labour with T&P,Cess required for the work etc. (Including cost of coloring materials) complete in all respect in all floors as per drawing and Technical Specification and as directed by the Engineer-in- Charge | 450.6 | Sqm | 49.19 | ₹22,165.01 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 2.02 MB
Tendernotice_1.pdf
PDF • 1.09 MB
BOQ_613101.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .