| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.4 CrAccepted-Finance | ₹3.4 Cr | 1 | Accepted-Finance Accepted |
| 2 | 2₹3.8 CrAccepted-Finance | ₹3.8 Cr | 2 | Accepted-Finance Accepted |
| 3 | 3₹4.5 CrAccepted-Finance | ₹4.5 Cr | 3 | Accepted-Finance Accepted |
| 4 | 4₹5.2 CrAccepted-Finance | ₹5.2 Cr | 4 | Accepted-Finance Accepted |
Tender Value
₹4.6 Cr
EMD Value
₹9.3 L
Closing Date
5 May 2026, 3:00 pmClosed
Executive Engineer, CD-VI
EE CD-VI Bharat Nagar Office Complex Delhi-52
Construction of approach road and RCC outfall drain of Sant Nagar B- Block upto Burari Bakhtawarpur road via Khushal Chowk in Burari AC-02(Regn. No. 444).
2026_IFC_290552_1
EE/CD-VI/ACS-03/2026-27 (2nd Call)
Open Tender
Civil Works
180 days
Khushal Chowk Burari
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹9.3 L
5 May 2026
29 Apr 2026
5 May 2026
29 Apr 2026
5 May 2026
29 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Hiring & running charges of JCB machine on hourly basis including all operations i.e. to and fro, carriage, crawling of machine, operator and fuel etc. complete. | 120 | Hour | 997.85 | ₹1,19,742 | BI01010001010000000000000515BI0100001113 |
| 2 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. | 51 | Cubic Metre | 1,553.3 | ₹79,218.3 | BI01010001010000000000000515BI0100001118 |
| 3 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 977 | Cubic Metre | 1,064.75 | ₹10,40,260.75 | BI01010001010000000000000515BI0100001122 |
| 4 | Desilting of side drains and disposal of material to nearby NDMC dhalao within 1 km by tractor trolley including loading , unloading etc complete including execution of work in foul conditions. All kinds of soil. | 437 | Cubic Metre | 510 | ₹2,22,870 | BI01010001010000000000000515BI0100001123 |
| 5 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil. | 558 | Cubic Metre | 177.7 | ₹99,156.6 | BI01010001010000000000000515BI0100001125 |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) | 211 | Cubic Metre | 4,782.2 | ₹10,09,044.2 | BI01010001010000000000000515BI0100001125 |
| 7 | Centering and shuttering including strutting, propping etc. and removalof form for all heights: Foundations, footings, bases of columns, etc. for mass concrete | 821 | Square Metre | 207.1 | ₹1,70,029.1 | BI01010001010000000000000515BI0100001125 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for all heights : Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 11,904 | Square Metre | 404.3 | ₹48,12,787.2 | BI01010001010000000000000515BI0100001125 |
| 9 | Providing and laying in position ready mixed M-25 grade concrete for reinforced cement concrete work, using cement content as per approved design mix, manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work, including pumping of R.M.C. from transit mixer to site of laying , excluding the cost of centering, shuttering finishing and reinforcement, including cost of admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer - in - charge. (Note :- Cement content considered in this item is @ 330 kg/cum. Excess/ less cement used as per design mix is payable/recoverable separately). All works upto plinth level | 1,204 | Cubic Metre | 7,169.45 | ₹86,32,017.8 | BI01010001010000000000000515BI0100001125 |
| 10 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more | 1,18,136 | Kilogram | 60.45 | ₹71,41,321.2 | BI01010001010000000000000515BI0100001125 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.54 MB
BOQ_385605.xls
BOQ • 0.31 MB
464khushalchowk.pdf
Tender Documents • 1.18 MB
Download all tender documents and submit your bid