Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹24.4 LAccepted-AOC | ₹24.4 L | 1 | Accepted-AOC workorderissued |
| 2 | Rejected-Technical ERAL | - | - | Rejected-Technical Rejected |
| Sl No | Description | Qty | Unit | ATHIVEL L2 | R.gunasekarn CO L1 |
|---|---|---|---|---|---|
| 1.00 | Picking the existing surface 3 to 5 cm deep removal of picked up staff to the side berms and using the useful metal to the road hand packing to camber sectioning levelling etc.,complete as per including labour charges for picking and other tools and plants etc., complete as per standard specifications. 404 of MORTH | 666 | Sqm | 30 ₹19,980 | 23.3 ₹15,517.80 |
| 2.00 | Providing and laying WMM (Wet Mix Macadam) of specified on the prepared sub base with graded stone aggregate and granular material of quality size and grading pasting in layor with motor grader and compaction with vibratory rollers of 80-100 KN static weight and fine dressing for required grade and cross slope as shown on the drawing equipments equipments safety measures testing and incidents necessary to complete the work as per MORTH 406 | 200 | Cum | 2,430 ₹4.9 L | 2,427 ₹4.9 L |
| 3.00 | Providing and laying Prime Coat over the Wet Mix Macadam surface using 7 Kg of SS1 Grade Emulsion bitumen for 10 Sq.m including cost of Emulsion bitumen which will be supplied by the contractor himself at his own cost as per special condition including cost and conveyance to site handling charges including labour charges for brushing,cleaning and preparing the surface for Applyinging the tack coat and labour for applying and required quantity of bitumen binder as tack coat by bitumen sprayer including hire and fuel charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights flags etc., completed Complying with Standard Specification as per Clause 503 MORTH Specification. | 1,998 | Sqm | 90 ₹1.8 L | 85.7 ₹1.7 L |
| 4.00 | Providing and laying Tack Coat over the Wet Mix Macadam surface using 2.50 Kg of RS1 Grade Emulsion bitumen for 10 Sq.m including cost of Emulsion bitumen which will be supplied by the contractor himself at his own cost as per special condition including cost and conveyance to site handling charges including labour charges for brushing,cleaning and preparing the surface for Applyinging the tack coat and labour for applying and required quantity of bitumen binder as tack coat by bitumen sprayer including hire and fuel charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights flags etc., completed Complying with Standard Specification as per Clause 503 MORTH Specification. | 1,998 | Sqm | 20 ₹39,960 | 19.5 ₹38,961 |
| 5.00 | Providing and laying 50 mm conslidated thick Dense Bituminuous macadam using 0.24 cum of 26.50-13.20 mm,0.25cum of 13.20-2.36mm and 0.23cum of 2.36mm and below and with 53.20kg of VG30 bitumen premixing 10 sqm including cost and conveyance of all materials to CMP site,heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 tons capacity,conveying the mix by tipper trucks to work site,spreading the mix uniform thickness of 50mm with paver to the specified grade and cross sections and compaction by vibratory/ pneumapic roller to the required density etc., including labour for accending to pavor at sites etc., including hire charges and fuel charges for 20-30T CMP with bitumen Boiler,tipper trucks, paver finisher/9 m paver finisher,vibratory/ pneumapic rollers and all other tools and plant required including to all other incidental charges etc., complete as per specification using CMP as clause 505 MORTH Rev-5. | 100 | Cum | 10,625 ₹10.6 L | 10,619 ₹10.6 L |
| 6.00 | Providing and laying Bituminous concrete to 30mm thick using 0.13 cum of 19.00-9.50 mm, 0.13cum of 9.50-2.36 mm and 0.26cum of 2.36mm and below with 46.28kgs of VG 30 /VG 40 bitumen and 4.02kgs plastic waste for 10 sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20–30 tonnes capacity, conveying the mix by tipper trucks to paver site spreading the mix to uniform thickness of 30 mm with mechanical Paver to the specified grades and cross sections and consolidated by 80 - 10 tonne vibratory/ pneumatic roller to the required density etc., including labor for attending to paver site etc., including hire charges and fuel charges for 20 – 30t CMP with bitumen boiler, tipper trucks, paver finisher,/ 9m paver finisher, vibratory/ pneumatic rollers and all other tools and plant required including fule and all other incidental charges etc., complete as per specification using CMP as for clause 507of MORTH Rev-5Rev-5. | 60 | Cum | 11,180 ₹6.7 L | 11,172 ₹6.7 L |
Tender Value
₹29.5 L
EMD Value
₹29,500
Closing Date
26 Feb 2026, 3:00 pmClosed
Executive officer
186, Main Road Naduvaikkurichi Sawyerpuram
Providing BT road at 7th ward Iruvappapuram Kaspa in Sawyerpuram Town panchayat.
2026_DTP_664716_1
792/2025
Open Tender
Civil Works
Sawyerpuram Town Panchayat Area
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹29,500
20 May 2026
23 Feb 2026
27 Feb 2026
23 Feb 2026
26 Feb 2026
23 Feb 2026
Picking the existing surface 3 to 5 cm deep removal of picked up staff to the side berms and using the useful metal to the road hand packing to camber sectioning levelling etc.,complete as per including labour charges for picking and other tools and plants etc., complete as per standard specifications. 404 of MORTH
Providing and laying WMM (Wet Mix Macadam) of specified on the prepared sub base with graded stone aggregate and granular material of quality size and grading pasting in layor with motor grader and compaction with vibratory rollers of 80-100 KN static weight and fine dressing for required grade and cross slope as shown on the drawing equipments equipments safety measures testing and incidents necessary to complete the work as per MORTH 406
Providing and laying Prime Coat over the Wet Mix Macadam surface using 7 Kg of SS1 Grade Emulsion bitumen for 10 Sq.m including cost of Emulsion bitumen which will be supplied by the contractor himself at his own cost as per special condition including cost and conveyance to site handling charges including labour charges for brushing,cleaning and preparing the surface for Applyinging the tack coat and labour for applying and required quantity of bitumen binder as tack coat by bitumen sprayer including hire and fuel charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights flags etc., completed Complying with Standard Specification as per Clause 503 MORTH Specification.
Providing and laying Tack Coat over the Wet Mix Macadam surface using 2.50 Kg of RS1 Grade Emulsion bitumen for 10 Sq.m including cost of Emulsion bitumen which will be supplied by the contractor himself at his own cost as per special condition including cost and conveyance to site handling charges including labour charges for brushing,cleaning and preparing the surface for Applyinging the tack coat and labour for applying and required quantity of bitumen binder as tack coat by bitumen sprayer including hire and fuel charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights flags etc., completed Complying with Standard Specification as per Clause 503 MORTH Specification.
Providing and laying 50 mm conslidated thick Dense Bituminuous macadam using 0.24 cum of 26.50-13.20 mm,0.25cum of 13.20-2.36mm and 0.23cum of 2.36mm and below and with 53.20kg of VG30 bitumen premixing 10 sqm including cost and conveyance of all materials to CMP site,heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 tons capacity,conveying the mix by tipper trucks to work site,spreading the mix uniform thickness of 50mm with paver to the specified grade and cross sections and compaction by vibratory/ pneumapic roller to the required density etc., including labour for accending to pavor at sites etc., including hire charges and fuel charges for 20-30T CMP with bitumen Boiler,tipper trucks, paver finisher/9 m paver finisher,vibratory/ pneumapic rollers and all other tools and plant required including to all other incidental charges etc., complete as per specification using CMP as clause 505 MORTH Rev-5.
Providing and laying Bituminous concrete to 30mm thick using 0.13 cum of 19.00-9.50 mm, 0.13cum of 9.50-2.36 mm and 0.26cum of 2.36mm and below with 46.28kgs of VG 30 /VG 40 bitumen and 4.02kgs plastic waste for 10 sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20–30 tonnes capacity, conveying the mix by tipper trucks to paver site spreading the mix to uniform thickness of 30 mm with mechanical Paver to the specified grades and cross sections and consolidated by 80 - 10 tonne vibratory/ pneumatic roller to the required density etc., including labor for attending to paver site etc., including hire charges and fuel charges for 20 – 30t CMP with bitumen boiler, tipper trucks, paver finisher,/ 9m paver finisher, vibratory/ pneumatic rollers and all other tools and plant required including fule and all other incidental charges etc., complete as per specification using CMP as for clause 507of MORTH Rev-5Rev-5.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_798253.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.48 MB
BOQ_798253.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid