Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹8.5 LAdmitted-Fee/PreQual/Technical/Finance FESUDA CHANDAULI | CHANDAULI | CHANDAULI | UTTAR PRADESH | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L1₹8.5 LAdmitted-Fee/PreQual/Technical/Finance 00 SHREE BALAJI ENTERPRISES TUBEWELL KE PASS BARWALA NAGAUR RAJASTHAN 341505 UDYAM RJ 35 0016306 | NAGAUR | RAJASTHAN | 341505 | L1 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹10.0 L
EMD Value
₹99,716
Closing Date
31 Oct 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
C.E.
KMC Motijheel kanpur
imp. C.C. Sarvice lane with Nali from Juhi Lal colony in Block No 335 to Block No 339 in back in ward 84 Zone 3
2026_NNKAN_1191533_2
228/AA-3/26-27
Open Tender
Civil Works
Fixed-rate
imp. C.C. Sarvice lane with Nali from Juhi Lal col
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
₹99,716
5 Nov 2026
24 Oct 2026
31 Oct 2026
24 Oct 2026
31 Oct 2026
24 Oct 2026
45 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | work in Surface excavation not exceeding 30 cm in depth but ceeding 1.5 m in width as well as 10 sqm on plan including etc all comp | 70.09 | cum | 170 | ₹11,914.62 |
| 2 | Desilting of Open Nala including etc all comp | 217.38 | cum | 180 | ₹39,127.5 |
| 3 | R.C.C. Work providing and laying in position cement concrete of specified grade excluding the coast of centering etc all comp | 12.46 | cum | 4,380 | ₹54,574.8 |
| 4 | Class -150 Brick Work in 1:4 cement C.Sand in foundation and plinth etc all comp | 35.95 | Cum | 6,600 | ₹2,37,283.2 |
| 5 | construction of granular sub base (GSB) ect all comp | 25.85 | cum | 3,676 | ₹95,024.6 |
| 6 | Laying old cemenet cocrete interlocking paver blocks of any design/Shape laid in tequired line etc all comp. | 298.45 | sqm | 255 | ₹76,104.75 |
| 7 | R.C.C. Work Providing and laying in position and laying in position Ready Mixed concrete manufactured in fully autonatic batching plant etc all comp | 31.02 | Cum | 8,538.54 | ₹2,64,865.51 |
| 8 | Supply and fixing of sign board With pedastal including all labour work supply and fixing of Sign board with pedastal etc all comp | 1 | Nos | 3,840 | ₹3,840 |
| 9 | R.C.C. Work R.C.C. Work With cement approved coarse sand and 20 mm approved stone ballast in proportion for raft foundation With 1:1.5:3 ( 1 cement 1.5C.Sand 20 mm size stone ballast ) etc all comp | 3.81 | cum | 8,600 | ₹32,774.6 |
| 10 | M.S or iron in plain work such as hevey size as fabrication of M.S M.S or iron in plain Work such as hevey size as fabrication | 2.99 | Qtl | 7,200 | ₹21,528 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.74 MB
BOQ_2271313.xls
BOQ • 0.22 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .