| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.6 LAccepted-Finance | L1 | Accepted-Finance BOQ Rate accepted | |
| 2 | L2₹6.9 L+₹21,908 (3.30%)Accepted-Finance 245 1A SATIN SEN SARANI KOLKATA 700054 | KOLKATA | KOLKATA | WEST BENGAL | 700054 | L2 | Accepted-Finance BOQ Rate accepted |
Tender Value
Refer Docs
EMD Value
₹8,300
Closing Date
19 Jun 2023, 2:00 pmClosed
SE Civil TTPS TTN 4
Office of the SE Civil TTPS TTN 4
Renovation and Repair works to the pressed tiles, columns, beams ceiling and flooring of the St.Thomas School Building at Thermal Nagar
2023_EB_322462_1
Spec.No.SE CIVIL TTPS 113 2023 2024
Open Tender
Civil Works - Others
Item Rate
120 days
Tuticorin Thermal Power Station
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹8,300
Yes
21 Jun 2023
3 Jun 2023
20 Jun 2023
3 Jun 2023
19 Jun 2023
3 Jun 2023
Amount
Providing two legged scaffolding for works up to 3m heights, using 10 to 13 cm. dia. casuarina props, the distance between the two rows being 1.25m and the spacing of posts being 2m in both the rows with two horizontal posts with 0.5m overlap on either side and braces at 2m c/c including longitudinal & transverse middle braces to step up and providing a platform with country wood planks of 40 mm thick & 1m width, etc. including cost of all materials, labours, lead, lift, safety measures, etc. complete. a) up to 3 mtr Level.
b) 6 mtr Level.
Chipping the existing concrete and roughening the surface for future bonding and thorough cleaning the surface including cost of all materials, labours, lead, lift, curing, etc. complete.
Clean removal of cement plaster from walls including cost of all materials, labours, lead, lift, curing, etc. complete.
Providing PCC 1:1.5:3 screed concrete using OP/PP cement with 6 to 10mm chips machine crushed HBG metal including cost of all materials, labours, lead, lift, curing, etc. complete
Dismantling the existing damaged RCC Structure and clear away the debris from the site including cost of all labour, lead, lift, etc., complete.
Supplying and providing R.T.S reinforcements including cost of all materials, labour, lead, lift, etc., complete.
Providing plinth protection to around the Block with P.C.C 1:3:6 using OP Cement with 20mm size machine crushed HBG metal including cost of all materials, labour, lead, lift, etc., complete.
Providing centering and shuttering arrangement for supporting the R.C.C. sunshade, slab, columns etc., including cost of all materials, labour, lead, lift, etc., complete.
Plastering with C.M 1:3, 20 mm thick including cost of all materials, labours, lead, lift, curing, etc. complete
Plastering with C.M 1:5, 12 mm thick including cost of all materials, labours, lead, lift, curing, etc. complete
Special ceiling plastering with C.M.1:3, 10 mm thick for RCC works including cost of all materials, labours, lead, lift, hacking the area, , curing, etc. complete
Pointing with C.M 1:3 to full depth of tiles including cost of all materials, labours, lead, lift, curing, etc. complete.
Dismantling one course of pressed tile roof in cement mortar and relaying with new pressed tiles of size 20x20x2cm in cement mortar 1:3 mixed with crude oil 10% by weight of cement over a bed of 25mm surkhi concrete and pointing with same mortar including cost of all labour, lead, lift, etc., complete.
Hollow block masonry using hollow block of size (16'' x 8'' x6'') in CM 1:5 including cost of all materials, labours, lead, lift, curing, etc. complete.
Collection and insertion of glass pieces over the top surface of compound wall for safety purpose including cost of class pieces labour, lead, lift, etc., complete.
Supplying and providing New PVC panelled door shutters hollow type 200x20mm panels with 1mm wall thickness for panels and styles and rails of suitable size with 2mm wall thickness suitably reinforced using MS Angle/ flat including cost of necessary Aluminium hinges and other furniture fitting such as screw, bolt and nuts 3Nos 3" Aluminium hinges 2Nos.3" Aluminium Tower bolt 2Nos, 4"Aluminium handles including cost of all materials, lead, lift, etc., complete.
KRISHNA ENTERPRISES
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .