| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹10.3 LAccepted-Finance | ₹10.3 L | 1 | Accepted-Finance Bidder quoted the less than the estimate Value |
| 2 | 2₹10.4 LRejected-Finance | ₹10.4 L | 2 | Rejected-Finance Bidder quoted the More than the estimate Value |
| Sl No | Description | Qty | Unit | SRI RAM CONSTRUCTION L2 | KK CONSTRUCTIONS L1 |
|---|---|---|---|---|---|
| 1.00 | Labour for cutting open BT Road for laying sewer main required labours etc., complete as per standard specifications. | 24 | 1 M³ | 1,000 ₹24,000 | 995 ₹23,880 Lowest |
| 2.00 | Earth work Open excavation by Mechanical Means for Open Earthwork in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers. | 68 | 1 M³ | 205 ₹13,940 | 200 ₹13,600 Lowest |
| 3.00 | Dismantling the existing Reinforced cement concrete including removing the debris from the site and stacking useful material at work site for reuse etc., complete complying with standard specification. | 1.1 | 1 M³ | 4,900 ₹5,390 | 4,840 ₹5,324 Lowest |
| 4.00 | Brick work in following Cement Mortar using best quality Burnt Clay Brick of size 9” x 4 1/2” x 3” with class designation of 10 conforming to IS 1077-1992 for foundation and basement including Cost of Mortar Plasticizer curing, etc.,complete complying with standard specification and as directed by the departmental officers. Brickwork shall be done as per IS 2212-1991 adopting English Bond generally.other type of bond shall be done as directed by the Executive Engineer in charge. | 14 | 1 M³ | 7,700 ₹1,07,800 | 7,686 ₹1,07,604 Lowest |
| 5.00 | Plastering with cement mortar 1:5 mix (one cement five P-sand), 12mm thick in all floors using clean screened M-Sand and including cost of curing for fifteen days from the completion of the work and surface should free from undulations and including the cost of preparing the surface for plastering and protecting from other damages till setting of mortar etc., complete complying with standard specification. | 116 | 1 M² | 305 ₹35,380 | 299 ₹34,684 Lowest |
| 6.00 | Supply and filling in foundation and basement with Gravel in layers of not more than 15cm.thick well rammed watered and compacted with surface vibrator, watered and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 116 | 1 M³ | 650 ₹75,400 | 644 ₹74,704 Lowest |
| 7.00 | Cement Concrete 1:5:10 (One cement, Five crushed stone sand and Ten hard broken stone jelly) using 40mm gauge hard broken jelly for flooring including laying,nsolidating, finishing, rendering the top surface rough to receive the floor, curing, etc. complete multiplying with standard specification and as directed by the departmental officers. The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers - Mixing by Manual means | 29 | 1 M³ | 5,600 ₹1,62,400 | 5,519 ₹1,60,051 Lowest |
| 8.00 | Plain Cement Concrete 1:2:4 (one cement, two crushed stone sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.- Mixing by manual means | 20 | 1 M³ | 7,000 ₹1,40,000 | 6,986 ₹1,39,720 Lowest |
| 9.00 | Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 2.10M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton and as directed by the departmental Officers (Payment for centering shall be given after the concrete is laid)- Centering for Curved RCC surfaces. | 49 | 1 M² | 810 ₹39,690 | 806 ₹39,494 Lowest |
| 10.00 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel reinforcement grills of all variety like HYSD/CTD/TMTand all grade like Fe 500, Fe550D, Fe 500 D etc., for all RCC works as per design given including cost of steel reinforcement and G.I. binding wire, wastage etc. complete complying with standard specification and as directed by the departmental officers | 1.6 | 1 Qtl | 9,500 ₹15,200 | 9,475 ₹15,160 Lowest |
Tender Value
₹10.5 L
EMD Value
₹21,000
Closing Date
20 Feb 2026, 3:00 pmClosed
Commissioner Tiruppur City Municipal Corporation
Tiruppur City Municipal Corporation
Raising of UGD Manholes at ward No 30 Areas
2026_MAWS_655240_19
E1/2942/2025
Open Tender
Civil Works
Works
90 days
Tiruppur City Municipal Corporation
Ple refer Tender Notice
3 documents required · 3 mandatory
₹0
₹21,000
25 Jul 2026
12 Feb 2026
20 Feb 2026
12 Feb 2026
20 Feb 2026
12 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Labour for cutting open BT Road for laying sewer main required labours etc., complete as per standard specifications. | 24 | 1 M³ | - | - |
| 2 | Earth work Open excavation by Mechanical Means for Open Earthwork in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers. | 68 | 1 M³ | - | - |
| 3 | Dismantling the existing Reinforced cement concrete including removing the debris from the site and stacking useful material at work site for reuse etc., complete complying with standard specification. | 1.1 | 1 M³ | - | - |
| 4 | Brick work in following Cement Mortar using best quality Burnt Clay Brick of size 9” x 4 1/2” x 3” with class designation of 10 conforming to IS 1077-1992 for foundation and basement including Cost of Mortar Plasticizer curing, etc.,complete complying with standard specification and as directed by the departmental officers. Brickwork shall be done as per IS 2212-1991 adopting English Bond generally.other type of bond shall be done as directed by the Executive Engineer in charge. | 14 | 1 M³ | - | - |
| 5 | Plastering with cement mortar 1:5 mix (one cement five P-sand), 12mm thick in all floors using clean screened M-Sand and including cost of curing for fifteen days from the completion of the work and surface should free from undulations and including the cost of preparing the surface for plastering and protecting from other damages till setting of mortar etc., complete complying with standard specification. | 116 | 1 M² | - | - |
| 6 | Supply and filling in foundation and basement with Gravel in layers of not more than 15cm.thick well rammed watered and compacted with surface vibrator, watered and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 116 | 1 M³ | - | - |
| 7 | Cement Concrete 1:5:10 (One cement, Five crushed stone sand and Ten hard broken stone jelly) using 40mm gauge hard broken jelly for flooring including laying,nsolidating, finishing, rendering the top surface rough to receive the floor, curing, etc. complete multiplying with standard specification and as directed by the departmental officers. The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers - Mixing by Manual means | 29 | 1 M³ | - | - |
| 8 | Plain Cement Concrete 1:2:4 (one cement, two crushed stone sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.- Mixing by manual means | 20 | 1 M³ | - | - |
| 9 | Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 2.10M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton and as directed by the departmental Officers (Payment for centering shall be given after the concrete is laid)- Centering for Curved RCC surfaces. | 49 | 1 M² | - | - |
| 10 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel reinforcement grills of all variety like HYSD/CTD/TMTand all grade like Fe 500, Fe550D, Fe 500 D etc., for all RCC works as per design given including cost of steel reinforcement and G.I. binding wire, wastage etc. complete complying with standard specification and as directed by the departmental officers | 1.6 | 1 Qtl | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 11.26 MB
BOQ_785952.xls
BOQ • 0.32 MB
19_Conditions.pdf
Tender Documents • 0.61 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].