Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹23 L
EMD Value
₹2.3 L
Closing Date
27 Nov 2026, 12:00 pm5d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
EE CD1 PWD BASTI
O/o EE CD1 PWD BASTI
Janpad Basti me Karyalaya Adhishashi Abhiyanta Nirman Khand 1 LNV Basti me Awar Abhiyanta Kaksha ka Nirman Karya
2026_CEUBZ_1211223_1
2881/4A DATE 01-10-2026
Open Tender
Civil Works - Buildings
Lump-sum
90 days
work
AS PER SBD
2 documents required · 2 mandatory
₹944
₹2.3 L
O/o EE CD1 PWD BASTI
21 Nov 2026
21 Nov 2026
27 Nov 2026
21 Nov 2026
27 Nov 2026
21 Nov 2026
21 Nov 2026 - 27 Nov 2026
23 Nov 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation in ordinary soil (loam clay, or sand) including filling lift up to 1.50 metre (5 fts.) and lead up to 30 mt. (100 fts.) & including filling, watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge up to a distance of 30 M. (100 fts.) from the foundation trenches.Excavation up to 1.50 mt. depthAs per DSR No.2.6.1 (Rates are excluding G.S.T. but Including All Taxes Royalty, Labour cess, Materials & T.&P.) | 16 | Cum | 123.9 | ₹1,982.4 |
| - | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40mm nominal size)As per DSR No.4.1.8 (Rates are excluding G.S.T. but Including All Taxes Royalty, Labour cess, Materials & T.&P.) | 4 | Cum | 4,756.4 | ₹19,025.6 |
| - | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. As per DSR No.2.27 (Rates are excluding G.S.T. but Including All Taxes Royalty, Labour cess, Materials & T.&P.) | 2 | Cum | 1,482.9 | ₹2,965.8 |
| - | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)-(Grade beam)As per DSR No.5.1.2 (Rates are excluding G.S.T. but Including All Taxes Royalty, Labour cess, Materials & T.&P.) | 6 | Cum | 6,316.2 | ₹37,897.2 |
| - | Providing and laying damp-proof course 40mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand: 4 graded stone aggregate 20 mm nominal size)As per DSR No.4.1 (Rates are excluding G.S.T. but Including All Taxes Royalty, Labour cess, Materials & T.&P.) | 3 | SQM | 286.8 | ₹860.4 |
| - | Providing & applying a coat of residual petroleum bitumen of grade of VG-10 of approved quality using 1.7kg per square metre on damp proof course after cleaning the surface with brushes and finally with a piece of cloth lightly soaked in kerosene oil.As per DSR No.4.13 (Rates are excluding G.S.T. but Including All Taxes Royalty, Labour cess, Materials & T.&P.) | 3 | SQM | 102 | ₹306 |
| - | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more.As per DSR No.5.22.6 (Rates are excluding G.S.T. but Including All Taxes Royalty, Labour cess, Materials & T.&P.) | 48 | SQM | 7,530.6 | ₹3,61,468.8 |
| - | 15 mm thick plinth plaster [1 cement : 4 coarse sand]As per DSR No.13.5.1 (Rates are excluding G.S.T. but Including All Taxes Royalty, Labour cess, Materials & T.&P.) | 5 | SQM | 287.5 | ₹1,437.5 |
| - | Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete.As per DSR No.5.9.1 (Rates are excluding G.S.T. but Including All Taxes Royalty, Labour cess, Materials & T.&P.) | 11 | SQM | 273.8 | ₹3,011.8 |
| - | Centering and shuttering including strutting, propping etc. and removal of form for : Columns, Pillars, Piers, Abutments, Posts and Struts.As per DSR No.5.9.6 (Rates are excluding G.S.T. but Including All Taxes Royalty, Labour cess, Materials & T.&P.) | 8 | SQM | 671.2 | ₹5,369.6 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.65 MB
Tendernotice_2.pdf
PDF • 0.23 MB
BOQ_2301846.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .