| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.3 LAccepted-AOC | ₹18.3 L | L1 | Accepted-AOC AOC |
| 2 | L2₹18.8 LRejected-Finance | ₹18.8 L | L2 | Rejected-Finance L2 |
| 3 | L3₹19.6 LRejected-Finance | ₹19.6 L | L3 | Rejected-Finance L3 |
| 4 | L4₹19.6 LRejected-Finance | ₹19.6 L | L4 | Rejected-Finance L4 |
| 5 | L5₹20.3 LRejected-Finance 117 2 KAKA DEV KANPUR | KANPUR NAGAR | UTTAR PRADESH | 208001 | ₹20.3 L | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | Mukut Bihari Lal Contractor L3 | M/S VASUDEV CONSTRUCTION L4 | M/S SHREE JEE CONSTRUCTIONS L1 | OM SAI CONSTRUCTION COMPANY L5 | SHREE ENGINEERS L2 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in Excavation of foundation in ordinary soil including all lift & lead and including back filling, watering and ramming excavated earth into the trenches or into the space between the structure and the side of foundation trenches or into the plinth with removal and disposal of surplus earth as direction of engineer-in-charge from the foundation trenches including cost of labour, all T&P leads and lift etc complete. | 334.74 | CUM | 60 ₹20,084.40 | 50 ₹16,737 | 50 ₹16,737 | 80 ₹26,779.20 | 521 ₹1.7 L |
| 2.00 | Providing and laying of Cement Concrete (M-10 grade) 1:3:6 including cost of all material, labour and T&P etc. complete required for proper complition of work. | 55.78 | CUM | 4,000 ₹2.2 L | 4,900 ₹2.7 L | 3,500 ₹2.0 L | 4,400 ₹2.5 L | 756 ₹42,169.68 |
| 3.00 | Providing and laying of Cement Concrete (M-15 grade) 1:2.4 including cost of all material, labour and T&P etc. complete required for proper complition of work. | 14.48 | CUM | 5,400 ₹78,192 | 5,300 ₹76,744 | 4,100 ₹59,368 | 5,600 ₹81,088 | 854 ₹12,365.92 |
| 4.00 | Providing and laying first class M-150 brick work in (1:4) cement mortar including cost of all materials, labour, T&P, all lifts and leads etc. complete. | 192.31 | CUM | 5,000 ₹9.6 L | 5,000 ₹9.6 L | 5,000 ₹9.6 L | 5,000 ₹9.6 L | 4,500 ₹8.7 L |
| 5.00 | Providing and laying R.C.C. M-20 (1:1.5:3) cement concrete including cost of all material labour and T&P all lift and leads etc. complete | 43.22 | CUM | 6,400 ₹2.8 L | 6,000 ₹2.6 L | 6,000 ₹2.6 L | 5,800 ₹2.5 L | 4,500 ₹1.9 L |
| 6.00 | Providing and laying C.C. M-25 (1:1:2) cement concrete including cost of all material labour and T&P all lift and leads etc. complete | 3.85 | CUM | 7,000 ₹26,950 | 6,500 ₹25,025 | 4,000 ₹15,400 | 4,400 ₹16,940 | 3,500 ₹13,475 |
| 7.00 | Providing and fixing Centering & shuttering including cost of all material labour, T&P, all lifts and leads, etc for proper completion of work for C.C. work (Abutments) | 69.53 | SQM | 400 ₹27,812 | 450 ₹31,288.50 | 300 ₹20,859 | 650 ₹45,194.50 | 3,520 ₹2.4 L |
| 8.00 | Providing and fixing Centering & shuttering including cost of all material labour, T&P, all lifts and leads, etc for proper completion of work for C.C. work (Wing Wall) | 20.58 | SQM | 500 ₹10,290 | 800 ₹16,464 | 500 ₹10,290 | 600 ₹12,348 | 520 ₹10,701.60 |
| 9.00 | Providing and fixing Centering & shuttering including cost of all material labour, T&P, all lifts and leads, etc for proper completion of work for R.C.C. work. | 139.58 | SQM | 500 ₹69,790 | 600 ₹83,748 | 300 ₹41,874 | 550 ₹76,769 | 1,050 ₹1.5 L |
| 10.00 | Supply and fixing of 20 mm expansion joint in slab between dirt wall and slab including cost all labour, T&P material etc. complete as per direction of Engineer-in-Charge. | 15.07 | SQM | 350 ₹5,274.50 | 50 ₹753.50 | 99 ₹1,491.93 | 365 ₹5,500.55 | 350 ₹5,274.50 |
Tender Value
Refer Docs
EMD Value
₹43,000
Closing Date
17 Dec 2025, 5:00 pmClosed
EE M G C C Div 8 Bulandshahr
EE M G C C Div 8 Bulandshahr
Lot 4 Const. of VRB at Km. 4.300 of Kamalpur Dy.
2025_UPIDC_1090465_20
02/EE/2025-26
Open Tender
Civil Works - Canal
120 days
SAMBHAL
2 documents required · 2 mandatory
₹944
₹43,000
Yes
28 Jan 2026
12 Dec 2025
18 Dec 2025
12 Dec 2025
17 Dec 2025
12 Dec 2025
12 Dec 2025 - 17 Dec 2025
Amount
Earth work in Excavation of foundation in ordinary soil including all lift & lead and including back filling, watering and ramming excavated earth into the trenches or into the space between the structure and the side of foundation trenches or into the plinth with removal and disposal of surplus earth as direction of engineer-in-charge from the foundation trenches including cost of labour, all T&P leads and lift etc complete.
Providing and laying of Cement Concrete (M-10 grade) 1:3:6 including cost of all material, labour and T&P etc. complete required for proper complition of work.
Providing and laying of Cement Concrete (M-15 grade) 1:2.4 including cost of all material, labour and T&P etc. complete required for proper complition of work.
Providing and laying first class M-150 brick work in (1:4) cement mortar including cost of all materials, labour, T&P, all lifts and leads etc. complete.
Providing and laying R.C.C. M-20 (1:1.5:3) cement concrete including cost of all material labour and T&P all lift and leads etc. complete
Providing and laying C.C. M-25 (1:1:2) cement concrete including cost of all material labour and T&P all lift and leads etc. complete
Providing and fixing Centering & shuttering including cost of all material labour, T&P, all lifts and leads, etc for proper completion of work for C.C. work (Abutments)
Providing and fixing Centering & shuttering including cost of all material labour, T&P, all lifts and leads, etc for proper completion of work for C.C. work (Wing Wall)
Providing and fixing Centering & shuttering including cost of all material labour, T&P, all lifts and leads, etc for proper completion of work for R.C.C. work.
Supply and fixing of 20 mm expansion joint in slab between dirt wall and slab including cost all labour, T&P material etc. complete as per direction of Engineer-in-Charge.
Providing and fixing steel reinforcement including cost of steel, binding wire, bending, binding, welding, cutting, placing in proper position, all lifts and leads, all material labour and T&P etc. complete
Providing and laying of 12 mm Thick Plaster in 1:4 Cement mortar including cost of all material labour, T&P, Curing etc. complete for proper completion of work.
Providing and laying local sand below floor including cost of all materials, labour and T&P all lift and leads etc. complete
Providing and painting Bitumin (85/40 grade) in two coats including cost of all material, T&P, heating, labour all lifts and leads etc. complete as per direction of Engineer-in-Charge.
Providing and laying of two coat tar Fell Painting including cost of all material, labour, T&P complete for proper completion of work.
Providing and fixing of M-100 mm dia PVC pipe in proper position for drainage spout i/c all material labour and T&P etc. required for proper completion of work.
SHREE ENGINEERS (BID ID -5752931)
Mukut Bihari Lal Contractor (BID ID -5752996)
M/S VASUDEV CONSTRUCTION (BID ID -5752997)
OM SAI CONSTRUCTION COMPANY (BID ID -5750168)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.89 MB
Lot4.pdf
Tender Documents • 7.83 MB
BOQ_2022677.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid