Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.2 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹4.0 L+₹71,255.32 (21.9%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹4.1 L+₹81,836.68 (25.2%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹4.1 L+₹82,857.39 (25.5%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L5₹4.1 L+₹85,642.47 (26.4%)Admitted-Fee/PreQual/Technical/Finance | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹4.9 L
EMD Value
₹14,582
Closing Date
21 Sept 2026, 4:00 pmClosed
EX ENGINEER REW KULGAM
EX ENGINEER REW KULGAM
CONSTRUCTION OF ROAD FROM MAIN ROAD TO GUJJAR BASTI HERPORA GUDDAR PHASE I KULGAM 405
2026_RDPR_324388_15
e- NIT No. 77 OF REWK/2026-27 Dated 12-09-2026
Open Tender
Civil Works
Percentage
30 days
KULGAM
Please refer Tender documents.
2 documents required · 2 mandatory
₹250
EX ENGINEER REW KULGAM
₹14,582
29 Sept 2026
12 Sept 2026
22 Sept 2026
12 Sept 2026
21 Sept 2026
12 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Preparation of subgrade by excavating earth to an average of 22.5 cm
depth, dressing to camber and consolidation with road roller of 8-12 tonne
capacity including making good the undulation etc. and disposal of surplus
earth upto 50 meters. | 141.45 | sqm | 153 | ₹21,641.85 |
| 2 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 min width) and for shafts, wells, cess pits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto1.5m,including getting out excavated earth and disposal of surplus excavated earth as directed 2.8.1 all kinds of soil | 48.7 | cum | 479.3 | ₹23,341.91 |
| 3 | P/L nallah stone stone solling including all carriages | 20.37 | cum | 1,200 | ₹24,444 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but
excluding the cost of centring and shuttering. All work upto plinth level with:
(1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 35.54 | cum | 6,356.99 | ₹2,25,927.42 |
| 5 | Form work of ordinary timber planks for in situ concrete work. | 90.45 | sqm | 286.35 | ₹25,900.36 |
| 6 | Providing and laying in position stone soling/ Nallah Muck/ RBM using Nallah stone including all leads, lifts and carriages complete job. | 117.3 | cum | 991.45 | ₹1,16,297.09 |
| 7 | Providing and laying non-pressure NP2 class (light duty) R.C.C. pipes
with collars jointed with stiff mixture of cement mortar in the proportion
of 1:2 (1 cement: 2 fine sand) including testing of joints etc. complete 20.5.4 450 mm dia. R.C.C. pipe | 15 | rm | 3,100 | ₹46,500 |
| 8 | Photograph / sign Board Charges of Approved Quality | 1 | job | 2,000 | ₹2,000 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.54 MB
BOQ_1094223.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .