Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Infra Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹12.4 L
EMD Value
₹31,650
Closing Date
25 Oct 2023, 10:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Directorate of Municipal Administration
Anandkumar S Zalaki
Construction of UGD line,CD,and drain at kallimanin plot new ward no 02 dharwad
DMA/2023-24/OW/WORK_INDENT1077
DMA/2023-24/OW/WORK_INDENT1077
Open
Other Works
Electronic Documents, First(One Cover)
DMA City Corporation Hubballi-Dharawada
8 documents required · 8 mandatory
₹500
₹31,650
5 Oct 2023
5 Oct 2023
16 Oct 2023
Construction of UGD line,CD,and drain at kallimanin plot new ward no 02 dharwad
Earth work excavation by manual means for drains,canals, waste weir,draft, approach channels, key trenches, foundation of bridges and such simillar works in all kinds of soils , as per drawing and tec...
Providing bedding for the pipeline trenches in black cotton and rock reaches including watering and consolidation by punners etc. complete with all lead and lift with:Murrum(PWD SR 2021-22 Vol No.05 P...
Supplying, lowering, laying, jointing, testing and commissioning of Glazed Stone Ware Pipes of following dia, conforming to IS 651:1992, IS 4127 with latest amendments, including conveying to work sit...
Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m , and lift upto 1.5...
Providing and constructing WIRE CUT BRICK MACHINEHOLE CHAMBERS using Portland/Pozzolana cement, conical in shape at top, with CC 1:3:6 foundation using 40mm and down size graded metal of approved qual...
Providing and constructing WIRE CUT BRICK MACHINEHOLE CHAMBERS using Portland/Pozzolana cement, conical in shape at top, with CC 1:3:6 foundation using 40mm and down size graded metal of approved qual...
Providing and constructing WIRE CUT BRICK MACHINEHOLE CHAMBERS using Portland/Pozzolana cement, conical in shape at top, with CC 1:3:6 foundation using 40mm and down size graded metal of approved qual...
Providing and constructing WIRE CUT BRICK MACHINEHOLE CHAMBERS using Portland/Pozzolana cement, conical in shape at top, with CC 1:3:6 foundation using 40mm and down size graded metal of approved qual...
Providing and constructing WIRE CUT BRICK MACHINEHOLE CHAMBERS using Portland/Pozzolana cement, conical in shape at top, with CC 1:3:6 foundation using 40mm and down size graded metal of approved qual...
Providing and constructing WIRE CUT BRICK MACHINEHOLE CHAMBERS using Portland/Pozzolana cement, conical in shape at top, with CC 1:3:6 foundation using 40mm and down size graded metal of approved qual...
Providing and constructing WIRE CUT BRICK MACHINEHOLE CHAMBERS using Portland/Pozzolana cement, conical in shape at top, with CC 1:3:6 foundation using 40mm and down size graded metal of approved qual...
Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS...
Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 ...
Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 ...
Supplying, Fitting and Placing TMT Fe 550 Reinforcement in Foundation / Substructure /
Superstructure complete as per Drawing and Technical Specifications. (PWD SR 2021-22 Vol No.03 P.No.71 SI No.9.3)...
Appendix I Additionalities for Formwork, Centering & Scaffolding Earth retaining structures Percentage on finished rate of concrete per m3 10% (PWD SR 2021-22 Vol No.01 P.No.115 SI No.09)
Appendix I Additionalities for Formwork, Centering & Scaffolding Solid Slab Super Structure (.PWD SR2021-22 Bridges (PWD SR 2021-22 Vol No.01 P.No.116 Bridges SI No.01)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
1077 kw1.doc
Tender Document • 1.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .