Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.6 LAdmitted-Fee/PreQual/Technical/Finance | ₹12.6 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹13.4 L+₹76,475.67 (6.06%)Admitted-Fee/PreQual/Technical/Finance | ₹13.4 L+₹76,475.67 (6.06%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹13.7 L+₹1.1 L (8.45%)Admitted-Fee/PreQual/Technical/Finance | ₹13.7 L+₹1.1 L (8.45%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹13.9 L+₹1.3 L (10.3%)Admitted-Fee/PreQual/Technical/Finance | ₹13.9 L+₹1.3 L (10.3%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹14.9 L+₹2.3 L (18.5%)Admitted-Fee/PreQual/Technical/Finance | ₹14.9 L+₹2.3 L (18.5%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | U.Abhishekwaran Contractor L4 | NETHAJI L3 | THANIGAIVEL L2 | K NANDAKUMAR L1 | T. THANGAMANI L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B | 21.82 | cum | 100 ₹2,182 Lowest | 150 ₹3,273 | 200 ₹4,364 | 263.78 ₹5,755.68 | 300 ₹6,546 |
| 2.00 | Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc. | 7.27 | cum | 4,800 ₹34,896 | 4,500 ₹32,715 Lowest | 5,278.02 ₹38,371.21 | 5,478.02 ₹39,825.21 | 6,000 ₹43,620 |
| 3.00 | Brick work in cement mortar 1:5 mix using country bricks 83/4"x43/8"x23/4" and conveyance of all materials to site and all labour charges etc complete -10 cum | 12.42 | cum | 5,900 ₹73,278 Lowest | 6,000 ₹74,520 | 6,059.82 ₹75,262.96 | 6,159.82 ₹76,504.96 | 7,000 ₹86,940 |
| 4.00 | Plastring Cm 1:5,12mm thick including cost and conveyance and all labour charges etc Complete | 149.4 | Sqm | 120 ₹17,928 Lowest | 250 ₹37,350 | 183.96 ₹27,483.62 | 283.96 ₹42,423.62 | 250 ₹37,350 |
| 5.00 | Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks for 10 cum | 8.42 | cum | 4,850 ₹40,837 | 6,000 ₹50,520 | 5,325 ₹44,836.5 | 4,500.55 ₹37,894.63 Lowest | 6,500 ₹54,730 |
| 6.00 | Supply and Delivery of Chain Link - 2" x 2" using 10 Gauge Galvanised Iron | 265.5 | Sqm | 150 ₹39,825 | 160.25 ₹42,546.38 | 110 ₹29,205 | 55 ₹14,602.5 Lowest | 180 ₹47,790 |
| 7.00 | Labour Charges for Barbed wire and Chain Link using 10Gauage two Play and four Proposed gaivanish iron wire of all size including cost and conveyance all labour charges etc complete. | 265.5 | Sqm | 110 ₹29,205 | 116.65 ₹30,970.58 | 45 ₹11,947.5 | 85.55 ₹22,713.53 | 40 ₹10,620 Lowest |
| 8.00 | Supply and Delivery of Barbed wire using 10Gauage two Play and four Proposed gaivanish iron wire of all size including cost and conveyance all labour charges etc complete. | 540 | Kg | 110 ₹59,400 | 10.35 ₹5,589 Lowest | 10.35 ₹5,589 Lowest | 10.35 ₹5,589 Lowest | 70 ₹37,800 |
| 9.00 | Supply and fixing GI Pipe Post including cost and conveyance all labour charges etc complete. | 624 | Rm | 360 ₹2,24,640 | 220 ₹1,37,280 | 464.3 ₹2,89,723.2 | 464.3 ₹2,89,723.2 | 150 ₹93,600 Lowest |
| 10.00 | Supply and fixing of Grill Door of size 0.90mx1.55m including cost and conveyance all labour charges etc complete. | 81 | Kg | 110 ₹8,910 | 107.81 ₹8,732.61 Lowest | 107.81 ₹8,732.61 Lowest | 107.81 ₹8,732.61 Lowest | 200 ₹16,200 |
Tender Value
Refer Docs
EMD Value
₹17,850
Closing Date
10 Sept 2026, 3:00 pmClosed
The Block Development officer(BP),Arcot Block
The Block Development office,Arcot Block
Providing new fencing work in Natrangal Pannai at Ladavaram Panchayat,Arcot Block
2026_RDTN_699102_1
A2/1711/2026
Open Tender
Civil Works
Works
90 days
The Block Development office, Arcot Block
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹17,850
10 Sept 2026
28 Aug 2026
10 Sept 2026
28 Aug 2026
10 Sept 2026
28 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B | 21.82 | cum | - | - |
| 2 | Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc. | 7.27 | cum | - | - |
| 3 | Brick work in cement mortar 1:5 mix using country bricks 83/4"x43/8"x23/4" and conveyance of all materials to site and all labour charges etc complete -10 cum | 12.42 | cum | - | - |
| 4 | Plastring Cm 1:5,12mm thick including cost and conveyance and all labour charges etc Complete | 149.4 | Sqm | - | - |
| 5 | Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks for 10 cum | 8.42 | cum | - | - |
| 6 | Supply and Delivery of Chain Link - 2" x 2" using 10 Gauge Galvanised Iron | 265.5 | Sqm | - | - |
| 7 | Labour Charges for Barbed wire and Chain Link using 10Gauage two Play and four Proposed gaivanish iron wire of all size including cost and conveyance all labour charges etc complete. | 265.5 | Sqm | - | - |
| 8 | Supply and Delivery of Barbed wire using 10Gauage two Play and four Proposed gaivanish iron wire of all size including cost and conveyance all labour charges etc complete. | 540 | Kg | - | - |
| 9 | Supply and fixing GI Pipe Post including cost and conveyance all labour charges etc complete. | 624 | Rm | - | - |
| 10 | Supply and fixing of Grill Door of size 0.90mx1.55m including cost and conveyance all labour charges etc complete. | 81 | Kg | - | - |
stage.html
html • 0.02 MB
finance_840414.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.27 MB
BOQ_840414.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .