Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹27.3 CrAccepted-Finance | ₹27.3 Cr | 1 | Accepted-Finance ok |
| 2 | Rejected-Technical | - | - | Rejected-Technical Non responsive |
| 3 | Rejected-Technical | - | - | Rejected-Technical Non Responsive |
| 4 | Rejected-Technical | - | - | Rejected-Technical Non Responsive |
| Sl No | Description | Qty | Unit | NAV BHARAT BUILDCON PRIVATE LIMITED L1 |
|---|---|---|---|---|
| 1.00 | Side shuttering including propping etc. complete (to achieve finish F 2 for :Top or intermediate bed plates, in between masonry or piers, abutments sluice wells etc. | 3,467.5 | Sqm | 185 ₹6,41,487.5 Lowest |
| 2.00 | Extra labour charges for RCC due to obstruction in laying and placing the reinforced cement concrete due to reinforcement. Columns, slabs, cantilevers projections staircases, lintels, beams, chajjas, Retaining walls, piers, abutments, galleries, arch covers, bed plates, sluice capstan bases etc. | 712.06 | Cum | 200 ₹1,42,412 Lowest |
| 3.00 | Centering and shuttering for slabs, beams, lintels Columns, trough with or without caps and base including propping and remove | 2,560.99 | Sqm | 225 ₹5,76,222.75 Lowest |
| 4.00 | Supplying of M.S. reionforcement including labour charges for bending binding and placing in position all reinforcement as per drawing including cost of binding wire and all leads and lifts using. Tor or ribbed bars (IS :1786-1985) | 1,22,884.92 | Kg. | 89 ₹1,09,36,757.88 Lowest |
| 5.00 | 37 mm thick shotcrete by wet mix process, applied with compressed air gun after chipping of defective concrete / masonry, racking the joints, cleaning of surface thoroughly with wet sand blasting after fixing of 9 gauge good quality rust free welded mesh of size 50 mm x 50 mm in TWO layers with anchors / clamps. After racking the joints clean the surface thoroughy by wet sand blasting, anchor the first layer of welded mesh in position and apply 15 mm cement concrete (1:2:1) by pressure gun and after hardening of first layer, anchor second layer of welded wire mesh, apply 22 mm thick cement concrete complete in all respect. Cement concrete comprising of cement, sand, coarse aggregate, water and quick setting compound in the proportion 1:2:1, sand and coarse aggregate conforming to IS 383 and table no. 1 of IS;9012 respectively. | 1,396.35 | Sqm | 1,671 ₹23,33,300.85 Lowest |
| 6.00 | Design, Drawing, fabrication, supply, erection, testing and commissioning of Vertical lift sliding type Dam Shutter gates interchangeable consisting of sealing frame (embedded parts), skin plate of shutters, stiffeners, horizontal and vertical girders, guide, stainless steel flat, lifting hooks, clits fasteners etc., with all accessories including frame & gate complete set for Barrage/ Stop dam/ waste weir / spillway including cost of all materials, machinery, labour, cutting, aligning, welding, finishing, cleaning, tools and tackles, seal fixing, applying one coat of zinc rich epoxy primer and three coats of cold applied coal tar epoxy paint, including primer coating, should not be less than 350 microns., etc. complete as per specifications and approved drawings, including packing & forwarding, transportation charges for structural steel components and other materials. | 28.5 | tonne | 1,74,810 ₹49,82,085 Lowest |
| 7.00 | Dismantling old plaster or skirting, racking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 m lead, inclusive of de-watering wherever required. | 210 | Sqm | 20 ₹4,200 Lowest |
| 8.00 | Cutting & clearance of jungle, bushes, shrubs Ankra/Ipomoea, Juliflora typna etc. on canal and bunds in dry/moist/slushy conditions including disposal as per instructions of the Engineer-in-charge. Cost of wood has been deducted from rates and thus will be property of contractor after cutting. Thick | 4,764.3 | Sqm | 2.5 ₹11,910.75 Lowest |
| 9.00 | Cutting & clearance of jungle, bushes, shrubs Ankra/Ipomoea, Juliflora typna etc. on canal and bunds in dry/moist/slushy conditions including disposal as per instructions of the Engineer-in-charge. Cost of wood has been deducted from rates and thus will be property of contractor after cutting. For dowels and outer slopes. | 18,29,263 | Sqm | 1.85 ₹33,84,136.55 Lowest |
| 10.00 | Painting distance mark stone and lettering with light blue white or yellow un-washable paint including cost of material | 672 | Each | 120 ₹80,640 Lowest |
Tender Value
₹24.8 Cr
EMD Value
₹49.6 L
Closing Date
21 Apr 2026, 3:00 pmClosed
ACE WR Zone Jaipur
O/o Additional Chief Engineer Water Resources Zone, Sinchai Bhawan JLN Marg Jaipur
Rehabilitation of Tordi Sagar Irrigation sub Project District Tonk of Stage-III under JICA funded RWSLIP
2026_WRDAS_546756_1
ACE NIT 39/2025-26_Tordi Sagar_JICA
Open Tender
Civil Works
Item Rate
548 days
under jurisdiction of EE tonk Division
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
as per nit
₹49.6 L
Yes
Jaipur
10 Jun 2026
18 Mar 2026
22 Apr 2026
18 Mar 2026
21 Apr 2026
18 Mar 2026
6 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Side shuttering including propping etc. complete (to achieve finish F 2 for :Top or intermediate bed plates, in between masonry or piers, abutments sluice wells etc. | - | Sqm | 185 | - |
| 2 | Extra labour charges for RCC due to obstruction in laying and placing the reinforced cement concrete due to reinforcement. Columns, slabs, cantilevers projections staircases, lintels, beams, chajjas, Retaining walls, piers, abutments, galleries, arch covers, bed plates, sluice capstan bases etc. | 1 | Cum | 200 | ₹199.8 |
| 3 | Centering and shuttering for slabs, beams, lintels Columns, trough with or without caps and base including propping and remove | 1 | Sqm | 225 | ₹224.78 |
| 4 | Supplying of M.S. reionforcement including labour charges for bending binding and placing in position all reinforcement as per drawing including cost of binding wire and all leads and lifts using. Tor or ribbed bars (IS :1786-1985) | 0.29 | Kg. | 89 | ₹25.81 |
| 5 | 37 mm thick shotcrete by wet mix process, applied with compressed air gun after chipping of defective concrete / masonry, racking the joints, cleaning of surface thoroughly with wet sand blasting after fixing of 9 gauge good quality rust free welded mesh of size 50 mm x 50 mm in TWO layers with anchors / clamps. After racking the joints clean the surface thoroughy by wet sand blasting, anchor the first layer of welded mesh in position and apply 15 mm cement concrete (1:2:1) by pressure gun and after hardening of first layer, anchor second layer of welded wire mesh, apply 22 mm thick cement concrete complete in all respect. Cement concrete comprising of cement, sand, coarse aggregate, water and quick setting compound in the proportion 1:2:1, sand and coarse aggregate conforming to IS 383 and table no. 1 of IS;9012 respectively. | 1 | Sqm | 1,671 | ₹1,669.33 |
| 6 | Design, Drawing, fabrication, supply, erection, testing and commissioning of Vertical lift sliding type Dam Shutter gates interchangeable consisting of sealing frame (embedded parts), skin plate of shutters, stiffeners, horizontal and vertical girders, guide, stainless steel flat, lifting hooks, clits fasteners etc., with all accessories including frame & gate complete set for Barrage/ Stop dam/ waste weir / spillway including cost of all materials, machinery, labour, cutting, aligning, welding, finishing, cleaning, tools and tackles, seal fixing, applying one coat of zinc rich epoxy primer and three coats of cold applied coal tar epoxy paint, including primer coating, should not be less than 350 microns., etc. complete as per specifications and approved drawings, including packing & forwarding, transportation charges for structural steel components and other materials. | - | tonne | 1,74,810 | - |
| 7 | Dismantling old plaster or skirting, racking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 m lead, inclusive of de-watering wherever required. | - | Sqm | 20 | - |
| 8 | Cutting & clearance of jungle, bushes, shrubs Ankra/Ipomoea, Juliflora typna etc. on canal and bunds in dry/moist/slushy conditions including disposal as per instructions of the Engineer-in-charge. Cost of wood has been deducted from rates and thus will be property of contractor after cutting. Thick | - | Sqm | 2.5 | - |
| 9 | Cutting & clearance of jungle, bushes, shrubs Ankra/Ipomoea, Juliflora typna etc. on canal and bunds in dry/moist/slushy conditions including disposal as per instructions of the Engineer-in-charge. Cost of wood has been deducted from rates and thus will be property of contractor after cutting. For dowels and outer slopes. | 0.61 | Sqm | 1.85 | ₹1.14 |
| 10 | Painting distance mark stone and lettering with light blue white or yellow un-washable paint including cost of material | - | Each | 120 | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.03 MB
BidDocumantTordiSagar.pdf
Tender Documents • 3.35 MB
BOQ_975026.xls
BOQ • 0.41 MB
Corrigendum02.pdf
PDF • 0.31 MB
Corrigendum01.pdf
PDF • 0.44 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].