| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.3 LAccepted-AOC | L1 | Accepted-AOC ACCEPT | |
| 2 | L2₹24.6 L+₹33,497 (1.38%)Rejected-AOC | L2 | Rejected-AOC REJECT |
| Sl No | Description | Qty | Unit | K RAMASAMY L2 | SRI THANGAMMAN CONSTRUCTIONS L1 |
|---|---|---|---|---|---|
| 1.00 | Farth work excavation in all kinds of soul inciuaing sand, silt, wet sand under water, black cotton, stiff blacl cotton, clay, hard stiff clay, hard red earth, murram, stoney earth, gravel and shales etc. excepting all kinds of rock and boulders exceeding 0.014 c.u.m. in volume including rough dressing and dumping the excavated materials away from work site manually within 50m initial lead and 2m initial lift as per the direction of Engineer-in-charge | 38 | M3 | 115 ₹4,370 | 113 ₹4,294 Lowest |
| 2.00 | Plain Cement Concrete 1:4:8 (one cement four fine aggregates and eight coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification | 12 | M3 | 5,340 ₹64,080 | 5,338 ₹64,056 Lowest |
| 3.00 | Centering with steel shutters including Studding with sides and surpport etc, as per the direction of dept officers etc., complete | 57 | M2 | 1,050 ₹59,850 | 1,045 ₹59,565 Lowest |
| 4.00 | Supplying fabrications and placing in position RTS rods: in various dia including cutting and bending tying of erills placing in position binding wire etc. completed | 10 | Qtl | 9,156 ₹91,560 | 9,152 ₹91,520 Lowest |
| 5.00 | Reinforced Cement Concrete 1:1.5:3 Mix (One Cement, One And Half sand , Three Metal) using 20 mm size HBG from approved quarry complying with standard specifications | 10 | M3 | 9,181 ₹91,810 Lowest | 9,181 ₹91,810 Lowest |
| 6.00 | Hire and running charges of crante 20 Tonne capacity etc., complete as per the direction of the dpet officers | 3 | D | 8,155 ₹24,465 Lowest | 8,155 ₹24,465 Lowest |
| 7.00 | Supply and fixing of L Angle and MS Pipes and Grills etc., complete as per the direction of the dept officers | 6,000 | Kg | 140 ₹8,40,000 | 135 ₹8,10,000 Lowest |
| 8.00 | Plain Cement Concrete 1:2:4 (one cement, two fine aggregates and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification | 5 | M3 | 6,700 ₹33,500 | 6,680 ₹33,400 Lowest |
| 9.00 | Fly ash Brick work in CM 1:5 (one cement & five sanc using size 9"X4 3/8"X 2 3/4" including finishing, curing, etc., complete complying with standard | 27 | M3 | 7,095 ₹1,91,565 | 7,093 ₹1,91,511 Lowest |
| 10.00 | PLASTERING with cement mortar 1:5(one cement and five sand by volume) 12mm thick for all internal/external surfaces like super structure, rainwater, ducts, elevation in all floors complying with standard specifications. | 93 | M2 | 290 ₹26,970 Lowest | 290 ₹26,970 Lowest |
Tender Value
₹30 L
EMD Value
₹30,000
Closing Date
10 Oct 2025, 3:00 pmClosed
The Commissioner, Coimbatore Corporation
Coimbatore Corporation, Main Office, Big bazaar street, Town hall, Coimbatore-1
Providing of Auditorium at Govternment Higher Secondary School in Ganapathy Ward No 30 North Zone
2025_MAWS_609967_1
e47/2025- Two Cover
Open Tender
Civil Works
Works
150 days
Coimbatore corporation
AS PER THE TENDER DOCUMENT
5 documents required · 5 mandatory
₹0
₹30,000
7 Nov 2025
30 Sept 2025
10 Oct 2025
30 Sept 2025
10 Oct 2025
30 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .