| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹26.1 LAccepted-AOC | ₹26.1 L Quoted ₹26.9 L | L1 | Accepted-AOC L1 |
| 2 | L2₹27.2 L+₹24,771 (0.92%)Rejected-AOC | ₹27.2 L+₹24,771 (0.92%) | L2 | Rejected-AOC L2 |
| 3 | L3₹27.4 L+₹52,658 (1.96%)Rejected-AOC | ₹27.4 L+₹52,658 (1.96%) | L3 | Rejected-AOC L3 |
| Sl No | Description | Qty | Unit | E. Elangovan L1 | P. Arumugam L3 | M. Palani L2 |
|---|---|---|---|---|---|---|
| 1.00 | Dismantling and Clearing away and carefully stacking materials for reuse for Floor finish and dadooing walls in cement mortar with mosaic tiles / glazed tiles / cuddapah slabs etc., complete complying with standard specifications and as directed by the departmental officers | 114.48 | Sq.m | 68 ₹7,784.64 Lowest | 69 ₹7,899.12 | 68 ₹7,784.64 Lowest |
| 2.00 | Dismantling and Clearing away and carefully stacking materials for reuse for RCC by manual / by using deploying machineries etc., complete complying with standard specifications and as directed by the departmental officers | 16.06 | Cu.m | 4,749 ₹76,268.94 Lowest | 4,841 ₹77,746.46 | 4,795 ₹77,007.7 |
| 3.00 | Dismantling and Clearing away and carefully stacking materials for reuse for brick or stone masonry in cement mortar walls under 3m height etc., complete complying with standard specifications and as directed by the departmental officers | 31.14 | Cu.m | 312 ₹9,715.68 Lowest | 318 ₹9,902.52 | 315 ₹9,809.1 |
| 4.00 | Dismantling and Clearing away and carefully stacking materials for reuse for pressed tiles and weathering course etc., complete complying with standard specifications and as directed by the departmental officers | 390.48 | Sq.m | 51 ₹19,914.48 Lowest | 52 ₹20,304.96 | 51 ₹19,914.48 Lowest |
| 5.00 | Dismantling and Clearing away and carefully stacking materials for reuse for plain cement concrete etc., complete complying with standard specifications and as directed by the departmental officers | 4.58 | Cu.m | 536 ₹2,454.88 Lowest | 546 ₹2,500.68 | 541 ₹2,477.78 |
| 6.00 | Clean removal of Cement plaster from walls etc., complete complying with standard specifications and as directed by the departmental officers | 240 | Sq.m | 9 ₹2,160 Lowest | 10 ₹2,400 | 9 ₹2,160 Lowest |
| 7.00Brick work in Cement Mortar 1:6 (One Cement and Six Crushed Stone Sand) using best quality Burnt Clay Brick of size 9” x 4 3/8” x 2 3/4” with class designation of 7.5 conforming to IS 1077-1992 for foundation and basement including Cost of Mortar Plasticizer curing, etc.,complete complying with standard specification and as directed by the departmental officers. Brickwork shall be done as per IS 2212-1991 adopting English Bond generally. Other type of bond shall be done as directed by the Executive Engineer in charge. | ||||||
| 7.01 | For Superstructure in Ground Floor | 12.05 | Cu.m | 7,747 ₹93,351.35 Lowest | 7,897 ₹95,158.85 | 7,822 ₹94,255.1 |
| 8.00 | Supplying and erecting centering for plane surfaces such as RCC Floor/Roof Beam, Lintels, Cantilever Beams, Bed Blocks etc.. with necessary supports and strutting upto 3.60m height in all floors with all cross bracings using MS Sheets made of 10 gauge thick welded with MS angle of Size 25mm x 25mm x 3mm for boarding laid over Steel adjustable Span of Size 2m x 2m(expandable upto 3.60m) and Silver Oak Joists of Size 10 x 5 cm spaced at 50cm to 60cm c/c and supported by Steel Adjustable Telescopic Props of Size 2m x 2m (expandable upto 3.60m) made with outer steel pipe with dia 50mm (3.60mm thick) and inner steel pipe with dia 40mm (2.90mm thick) Spaced at not more than 50 to 60cm c/c , etc complete complying with standard specifications. Steel adjustable span and Steel Adjustable telescopic props shall be provided as directed by the departmental Officers. (Payment for centering shall be given after the concrete is laid). | 24.65 | Sq.m | 1,115 ₹27,484.75 Lowest | 1,137 ₹28,027.05 | 1,126 ₹27,755.9 |
| 9.00 | Supplying and erecting centering for plane surfaces such as RCC Floor Slab, Roof Slab, Loft, Landing Slabs, etc with necessary supports and strutting upto 3.60m height in all floors with all cross bracings using MS Sheets made of 10 gauge thick welded with MS angle of Size 25mm x 25mm x 3mm for boarding laid over steel adjustable span of size 2m x 2m (expandable upto 3.60m) and supported by Steel Adjustable Telescopic Props of Size 2m x 2m (expandable upto 3.60m) made with outer steel pipe with dia 50mm (3.60mm thick) and inner steel pipe with dia 40mm (2.90mm thick) , etc complete complying with standard specifications. Steel adjustable span and Steel Adjustable telescopic props shall be provided as directed by the departmental Officers. (Payment for centering shall be given after the concrete is laid). | 45.85 | Sq.m | 966 ₹44,291.1 Lowest | 985 ₹45,162.25 | 975 ₹44,703.75 |
Tender Value
₹26.1 L
EMD Value
₹23,100
Closing Date
26 Sept 2025, 3:00 pmClosed
Executive Engineer
PWD Campus, Chengam Road, Tiruvannamalai
Special Repairs to leaky roof, toilet and bathroom repairs, water supply and sanitary arrangements in Government Most Backward Class Social Justice School Boys Hostel at Arani in Tiruvannamalai District.
2025_PWD_607833_1
JDO1/F.1013/25-26/12TN-2
Open Tender
Civil Works
Lump-sum
120 days
Aranio
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹23,100
11 Nov 2025
23 Sept 2025
26 Sept 2025
23 Sept 2025
26 Sept 2025
23 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_726446.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .