Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹10.8 LAdmitted-Fee/PreQual/Technical/Finance | -26.80% | ₹10.8 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹12.4 L+₹1.6 L (15.3%)Admitted-Fee/PreQual/Technical/Finance | -15.61% | ₹12.4 L+₹1.6 L (15.3%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹12.5 L+₹1.7 L (16.1%)Admitted-Fee/PreQual/Technical/Finance | -15.00% | ₹12.5 L+₹1.7 L (16.1%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹12.8 L+₹2.0 L (18.9%)Admitted-Fee/PreQual/Technical/Finance | -12.99% | ₹12.8 L+₹2.0 L (18.9%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹13.1 L+₹2.3 L (21.2%)Admitted-Fee/PreQual/Technical/Finance | -11.29% | ₹13.1 L+₹2.3 L (21.2%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹14.7 L
EMD Value
₹29,460
Closing Date
17 Aug 2026, 4:00 pmClosed
Executive Engineer RnB Division Langate
RnB Division Langate
Restoration of Road connecting Hajin to Gundkamal BWO constructing Retaining walls and Breast Walls.
2026_PWDJK_320074_2
24/1803-12/2026-27/RnB/Langate Dated 08/08/2026
Open Tender
Civil Works
Percentage
30 days
Langate
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
MH 0059
₹29,460
22 Aug 2026
8 Aug 2026
18 Aug 2026
8 Aug 2026
17 Aug 2026
8 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas(exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) includingdisposal of excavated earth lead upto 200 meters and lift upto 1.5 m, as directed byEngineer-in-Charge.All kinds of soil | 63.44 | Cum | 187.3 | ₹11,882.31 |
| 2 | Earth work in excavation in all kinds of soil by mechinical means in trenches for foundation, drains, pipes, cables etc. (not exceeding 1.5 Mtr. In width) and for shafts, wells, cesspits and the like not exceeding 10 Sqm on plan depth up to 1.5 Mtr; including disposal of excavated earth and Root Cutting as per the directions of engineer incharge complete job. | 108.75 | Cum | 256.85 | ₹27,932.44 |
| 3 | Providing and filling of quarry stones in crates incl. tipping and tightening of wire crates incl hand packing of quarry stones in proper position and level incl all carriages and cost of crates.(NON SOR) | 311.75 | Cum | 4,200 | ₹13,09,350 |
| 4 | Providing and laying Nallah Muck/RBM as backfilling incl all carriages.(NON SOR) | 89.72 | Cum | 1,200 | ₹1,07,664 |
| 5 | Providing and laying of 16'' Dia RCC spun pipes in position including earth work cutting, laying of pipes in position & re filling by exeavated materials, providing sufficient cushions over pipes including loading, unloading, & including all carriages upto site of work complete. (inl. Cost of pipes) | 4.86 | Rm | 3,400 | ₹16,524 |
stage.html
html • 0.03 MB
finance_1062438.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.54 MB
BOQ_1062438.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .