| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.5 CrAdmitted-Finance ASTBAL MOHALLA BANASAR BAGH ROAD PATIALA GATE SANGRUR 148001 | SANGRUR | SANGRUR | PUNJAB | 148001 | ₹6.5 Cr | L1 | Admitted-Finance |
| 2 | L2₹8.4 CrAdmitted-Finance C 33 3971 GALI NO 6 JALANDHAR CANTT 144005 | JALANDHAR | JALANDHAR | PUNJAB | 144005 | ₹8.4 Cr | L2 | Admitted-Finance |
| 3 | Rejected-Technical 16 PRATAP NAGAR CHARBHUJA RAWATBHATA RAJASTHAN 323307 | RAWATBHATA | CHITTORGARH | RAJASTHAN | 323307 | - | - | Rejected-Technical Not Recommended being not enlisted in Cat a ii |
| Sl No | Description | Qty | Unit | M/S Mukesh Kumar Gupta L2 | NARINDER KUMAR SONS L1 |
|---|---|---|---|---|---|
| 1.00 | Demolition of Cement Concrete (Unreinforced Concrete) of any description and in any position not otherwise specifically provided for complete and removing the unserviceable rubbish outside the MOD land and deposited where permitted by the State Govt Authority complete all as specified and directed by Engineer-in-Charge. | 160.26 | Cubic Metre | 550 ₹88,143 | 200 ₹32,052 |
| 2.00 | Demolition of brick work or stone/boulder masonry built in cement mortar including all quions arches, pillar or any other description and in any situation etc complete and removing the unserviceable rubbish outside the MOD land and deposited where permitted by the State Govt Authority complete all as specified and directed by Engineer-in-Charge. | 247.57 | Cubic Metre | 1,000 ₹2.5 L | 100 ₹24,757 |
| 3.00 | Demolition of cement concrete (reinforced) and (reinforcement cut as required to facilitate demolition) in any position not otherwise specificaly provided for complete and removing the unserviceable rubbish outside the MOD land and deposited where permitted by the State Govt Authority complete all as specified and directed by Engineer-in-Charge. | 223.79 | Cubic Metre | 1,200 ₹2.7 L | 100 ₹22,379 |
| 4.00 | Taking down Cement plaster or cement lime plaster on brick or stone walls including raking out joints, hacking for key & scrubbing down with water etc complete all as specified and directed by Engineer-in-Charge. | 1,200 | Square Metre | 30 ₹36,000 | 10 ₹12,000 |
| 5.00 | Excavation in trenches in soft/loose soil not exceeding 1.5 metre deep and not exceeding 1.5 metre wide for laying of cables, pipes, foundation etc or for shafts, wells, cesspits,manholes, pier holes, etc.not exc 10 sq metre on plan and getting out including dressing/trimming sides and levelling/ grading and ramming of bottom of excavation complete, all as specified and directed by Engineer-in-Charge. | 84.61 | Cubic Metre | 210 ₹17,768.10 | 200 ₹16,922 |
| 6.00 | Earth work in excavation in all kinds of soils by mechanical means (Hydraulic excavator) in foundation trenches or drains (not exceeding 1.5 metre in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 metre,including getting out the excavated soil complete, all as specified and directed by Engineer-in-Charge. | 16,897.16 | Cubic Metre | 210 ₹35.5 L | 90 ₹15.2 L |
| 7.00 | Earth work in excavation in all kinds of soils by mechanical means (Hydraulic excavator) in foundation trenches or drains (not exceeding 1.5 metre in width or 10 sq metre on plan), including dressing of sides and ramming of bottoms, lift exc 1.5 metre but not exc 3.0 metre including getting out the excavated soil complete, all as specified and directed by Engineer-in-Charge. | 5,348.21 | Cubic Metre | 270 ₹14.4 L | 100 ₹5.3 L |
| 8.00 | Earth work in excavation in all kinds of soils by mechanical means (Hydraulic excavator) in foundation trenches or drains (not exceeding 1.5 metre in width or 10 sq metre on plan), including dressing of sides and ramming of bottoms, lift exc 3.0 metre but not exc 4.5 metre including getting out the excavated soil all as specified and directed by Engineer-in charge.
Note for item 5 to 8 : Returning/filling shall be measured and paid separately. Before taking up the excavation work, the mapping of the site is to be carried out by hiring a ground penetrating radar or any other machine to find out the underground existing cable, pipe line etc. so that the damage to existing power cable, communication cable, water/sewer pipes shall be avoided during excavation work. The cost of hiring of machine for mapping of the area to be excavated shall be deemed to be included in the rate quoted. | 509 | Cubic Metre | 550 ₹2.8 L | 200 ₹1.0 L |
| 9.00 | Returning, filling in, including spreading, levelling, watering and well ramming excavated soil in layers not exceeding 25 cm thick each layer, complete, all as specified and directed by Engineer-in-Charge. | 16,447.66 | Cubic Metre | 60 ₹9.9 L | 20 ₹3.3 L |
| 10.00 | Removing excavated surplus soil obtained from excavation to a distance not exceeding 250 metre and deposting where directed at a level not exceeding 1.5 metre above the starting point complete, all as specified and directed by Engineer-in-Charge. | 4,304.33 | Cubic Metre | 80 ₹3.4 L | 20 ₹86,086.60 |
Updated dates
Tender Value
₹4.8 Cr
EMD Value
₹5.5 L
Closing Date
27 Dec 2025, 6:00 pmClosed
Chief Engineer Chd Zone
HQ CE Chandigarh Zone N Area, Airport Road Chandigarh-160003
CA NO CE CHZ CHM/T 18 2025 26 PROVN OF BALANCE ITEM OF WORK FOR ADDITION ALTERATION OF EXISTING SEWER LINES, CHAMBERS AND MANHOLES AT CHANDIMANDIR MIL STATION
2025_MES_740718_1
CE CHZ/CHM/T-18/2025-26
Open Tender
Civil Works - Water Works
365 days
Chandimandir
As per Tender Documents
9 documents required · 9 mandatory
₹2,000
GE Chandimandir
₹5.5 L
Yes
22 Jan 2026
20 Nov 2025
29 Dec 2025
20 Nov 2025
27 Dec 2025
12 Dec 2025
20 Nov 2025 - 8 Dec 2025
Demolition of Cement Concrete (Unreinforced Concrete) of any description and in any position not otherwise specifically provided for complete and removing the unserviceable rubbish outside the MOD land and deposited where permitted by the State Govt Authority complete all as specified and directed by Engineer-in-Charge.
Demolition of brick work or stone/boulder masonry built in cement mortar including all quions arches, pillar or any other description and in any situation etc complete and removing the unserviceable rubbish outside the MOD land and deposited where permitted by the State Govt Authority complete all as specified and directed by Engineer-in-Charge.
Demolition of cement concrete (reinforced) and (reinforcement cut as required to facilitate demolition) in any position not otherwise specificaly provided for complete and removing the unserviceable rubbish outside the MOD land and deposited where permitted by the State Govt Authority complete all as specified and directed by Engineer-in-Charge.
Taking down Cement plaster or cement lime plaster on brick or stone walls including raking out joints, hacking for key & scrubbing down with water etc complete all as specified and directed by Engineer-in-Charge.
Excavation in trenches in soft/loose soil not exceeding 1.5 metre deep and not exceeding 1.5 metre wide for laying of cables, pipes, foundation etc or for shafts, wells, cesspits,manholes, pier holes, etc.not exc 10 sq metre on plan and getting out including dressing/trimming sides and levelling/ grading and ramming of bottom of excavation complete, all as specified and directed by Engineer-in-Charge.
Earth work in excavation in all kinds of soils by mechanical means (Hydraulic excavator) in foundation trenches or drains (not exceeding 1.5 metre in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 metre,including getting out the excavated soil complete, all as specified and directed by Engineer-in-Charge.
Earth work in excavation in all kinds of soils by mechanical means (Hydraulic excavator) in foundation trenches or drains (not exceeding 1.5 metre in width or 10 sq metre on plan), including dressing of sides and ramming of bottoms, lift exc 1.5 metre but not exc 3.0 metre including getting out the excavated soil complete, all as specified and directed by Engineer-in-Charge.
Transporting to site, lowering , laying, aligning, fixing in position and jointing in trenches at all level/ depths, ISI marked Asbestos cement pipes 200 mm dia class 1 (Mazza process) pipes for sewer and drainage application as per IS 6908-1991 (amended upto date with AC coupler joints sealed with rubber gaskets (EPDM/SBR) as per IS 5382 complete, including cost of all materials except cost of asbestos cement pipes 200 mm dia, labour, jointing, water sectional hydro testing (including cost and covenyance of water to site for testing) etc laid in trenches on concrete bed to level /gradient, jointing with appropriate class fittings as per manufacturer's instructions including jointing accessories and fittings complete, all as specified and directed by Engineer-in-Charge. Note:- Asbestos cement pipe 200 mm dia class 1 (Mazza process) shall be issued under Sch 'B' free for fixing only.
Returning, filling in, including spreading, levelling, watering and well ramming excavated soil in layers not exceeding 25 cm thick each layer, complete, all as specified and directed by Engineer-in-Charge.
Removing excavated surplus soil obtained from excavation to a distance not exceeding 250 metre and deposting where directed at a level not exceeding 1.5 metre above the starting point complete, all as specified and directed by Engineer-in-Charge.
Concrete bed to drain pipes of 110 mm bore including packing under and haunching against the sides of pipes after they are laid and tested in PCC 1:4:8 type D-2 using 40 mm graded mechanically crushed stone aggregate complete, all as specified and directed by Engineer-in-Charge.
Concrete bed to drain pipes of 150 mm bore including forming cradles in PCC 1:4:8 type D-2 using 40 mm graded mechanically crushed stone aggregate complete, all as specified and directed by Engineer-in-Charge.
Concrete bed to drain pipes of 200 mm bore including forming cradles in PCC 1:4:8 type D-2 using 40 mm graded mechanically crushed stone aggregate complete, all as specified and directed by Engineer-in-Charge.
Concrete bed to drain pipes of 250 mm bore including forming cradles in PCC 1:4:8 type D-2 using 40 mm graded mechanically crushed stone aggregate complete, all as specified and directed by Engineer-in-Charge.
Providing at site, lowering , laying, aligning, fixing in position and jointing in trenches at all level/ depths, ISI marked Asbestos cement pipes 150 mm dia class 1 (Mazza process) pipes for sewer and drainage application as per IS 6908-1991 (amended upto date with AC coupler joints sealed with rubber gaskets (EPDM/SBR) as per IS 5382 complete, including cost of all materials, labour, jointing, water sectional hydro testing (including cost and covenyance of water to site for testing) etc laid in trenches on concrete bed to level /gradient, jointing with appropriate class fittings as per manufacturer's instructions including jointing accessories and fittings complete, all as specified and directed by Engineer-in-Charge.
Earth work in excavation in all kinds of soils by mechanical means (Hydraulic excavator) in foundation trenches or drains (not exceeding 1.5 metre in width or 10 sq metre on plan), including dressing of sides and ramming of bottoms, lift exc 3.0 metre but not exc 4.5 metre including getting out the excavated soil all as specified and directed by Engineer-in charge. Note for item 5 to 8 : Returning/filling shall be measured and paid separately. Before taking up the excavation work, the mapping of the site is to be carried out by hiring a ground penetrating radar or any other machine to find out the underground existing cable, pipe line etc. so that the damage to existing power cable, communication cable, water/sewer pipes shall be avoided during excavation work. The cost of hiring of machine for mapping of the area to be excavated shall be deemed to be included in the rate quoted.
Providing at site, lowering , laying, aligning, fixing in position and jointing in trenches at all level/ depths, ISI marked Asbestos cement pipes 200 mm dia class 1 (Mazza process) pipes for sewer and drainage application as per IS 6908-1991 (amended upto date with AC coupler joints sealed with rubber gaskets (EPDM/SBR) as per IS 5382 complete, including cost of all materials, labour, jointing, water sectional hydro testing (including cost and covenyance of water to site for testing) etc laid in trenches on concrete bed to level /gradient, jointing with appropriate class fittings as per manufacturer's instructions including jointing accessories and fittings complete, all as specified and directed by Engineer-in-Charge.
Providing at site, lowering , laying, aligning, fixing in position and jointing in trenches at all level/ depths, ISI marked Asbestos cement pipes 250 mm dia class 1 (Mazza process) pipes for sewer and drainage application as per IS 6908-1991 (amended upto date with AC coupler joints sealed with rubber gaskets (EPDM/SBR) as per IS 5382 complete, including cost of all materials, labour, jointing, water sectional hydro testing (including cost and covenyance of water to site for testing) etc laid in trenches on concrete bed to level /gradient, jointing with appropriate class fittings as per manufacturer's instructions including jointing accessories and fittings complete, all as specified and directed by Engineer-in-Charge.
PCC 1:4:8 type D2, using 40 mm graded mechanically crushed stone aggregates as in foundation, filling and mass concrete complete, all as specified and directed by Engineer-in-Charge.
Supplying, aligning, Installation & testing of Precast circular reinforced concrete (M-40) manholes complete with and including 90 mm thick S.F.R.C. cover (heavy duty, HD-20 grade designation),conical top (Top portion) of internal dia 0.56 metre at top,internal dia 1.0 metre at bottom,0.805 metre internal depth and bottom solid cylindrical portion 0.30 metre deep, with wall thickness of 200mm conforming to I.S. 12592, collector for AC pipe inlet 150/200, AC pipe outlet 150/200 pipes & future pipes connecting arrangements all as specified and shown on drawing no.SK-1054 Sheet 1/3 . The manholes shall be precast with M-40 concrete grade building in with end caps where shown or necessary, including cost of all materials, labours, T&P including providing the SFRC footrest as specified and shown on drawing suitable to with stand the bend test and chemical resistance test as per specifications and having manufactures permanent identification marks to be visible even after fixing including fixing in manhole complete all as directed and specified.
Transporting to site, lowering , laying, aligning, fixing in position and jointing in trenches at all level/ depths, ISI marked Asbestos cement pipes 150 mm dia class 1 (Mazza process) pipes for sewer and drainage application as per IS 6908-1991 (amended upto date with AC coupler joints sealed with rubber gaskets (EPDM/SBR) as per IS 5382 complete, including cost of all materials except cost of asbestos cement pipes 150 mm dia, labour, jointing, water sectional hydro testing (including cost and covenyance of water to site for testing) etc laid in trenches on concrete bed to level /gradient, jointing with appropriate class fittings as per manufacturer's instructions including jointing accessories and fittings complete, all as specified and directed by Engineer-in-Charge. Note:- Asbestos cement pipe 150 mm dia class 1 (Mazza process) shall be issued under Sch 'B' free for fixing only.
All as per item No. 19 here-in-before but for circular precast reinforced manhole rings only for increase of manhole depth more than 0.805 metre and upto 2.0 metre complete including SFRC footrest required as per the height all as directed and specified. Note:- Various manholes of different depths are to be provided at site as per site requirem
ent. The tenderer shall quote rates for depth beyond 0.805 metre top portion for this item. Actual payment shall be made based on actual depth provided at site for increse in depth or for each manhole beyond 0.805 metre depth top portion. Tenderer should note this aspect while quoting rates against this item.
Cutting existing roadwork for laying of sewage line/pipeline and making good including providing and laying 80mm thick factory made chamfered edge cement concrete paver block of M-35 grade with approved colour, design & pattern over 150mm thick PCC 1:3:6 type C-2 using 40mm graded aggregates, over compacted road metal retrieved during cutting of road over the necessary earth filling etc complete all as specified and directed by Engineer-in-Charge.
Cement concrete 1:2:4 type B-1 (using 20 mm graded mechanically crushed stone aggregate) as in surface channels and drains complete including use of necessary formwork (straight or curved, all as specified and directed by Engineer-in-Charge.
50 mm thick Cement concrete 1:3:6 type C-2 (using 20 mm graded mechanically crushed stone aggregate) as in flooring and similar works complete including finishing surfaces of concrete topping even and fair (without using extra cement all as specified and directed by Engineer-in-Charge.
Framed work such as grills,gratings, etc.. with ends of bars shouldered and/or riveted,or forged into spikes; framed guard bars; barred iron doors; ladders; framed balusters; walk ways; railings; framework of water tanks and similar work conforming to Fe.290.Gde-E-165 complete all as specified and directed by Engineer-in-Charge.
Providing and laying 60mm thick factory made chamfered edge cement concrete paver block of M-35 grade with approved colour, design & pattern as in footpath, parks, lawns, drive ways or light traffic parking etc.,of required strength, thickness & size/shape, made by table vibratory method using PU mould, laid in required colour & pattern over and including 50mm thick compacted bed of fine sand, compacting and proper embedding/ laying of inter locking paver blocks into the sand bedding layer through vibratory compaction by using plate vibrator, filling the joints with sand and cutting of paver blocks as per required size and pattern, finishing and sweeping extra sand complete, all as specified and directed by Engineer-in-Charge.
Cement concrete (1:4:8) type D-2,using 40 mm graded mechanically crushed stone aggregate 75 mm thick as in sub base, floors, pavings etc. complete all as specified and directed by Engineer-in-Charge.
110mm dia PVC (SWR) pipes single socketed, in any length with rubber ring joints or jointed with solvent cement joint, laid in trenches or in floors,type B, conforming to IS 13592-1992 , jointed & tested including taking out/down old pipes complete, all as specified and directed by Engineer-in-charge. Note - Rubber rings for pipes and fittings shall conform to IS 5382-1985.
110mm dia PVC (SWR) bends any radius fixed in repairs with rubber ring joints or jointed with solvent cement joint, laid in trenches or in floors,type B, conforming to IS 13592-1992 , jointed & tested including making good the disturbed surface complete, all as specified and directed by Engineer-in-charge.
Preparation of new or previously untreated surfaces of walls and applying two coats of cement based paint on plastered/unplastered surfaces complete all as specified and directed
Brick work using using burnt clay bricks of sub class 'B' class designation 15 straight or curved on plan exceeding 6.00 metre mean radius built in cement mortar (1:4) including corbellings etc, raking out joints internally and also externally (above G.L.) for plastering and externally joints pointed flush below ground level in the same mortar as the work proceeds complete all as specified.
Square metre
Supply only liquid water proofing compound ISI marked complete, all as specified and directed by Engineer-in-Charge.
Precast cement concrete (Grade M-30) manhole cover SFRC (steel fibre reinforced cover) factory made including suitable precast RCC frame as per manufacturer's instructions, heavy duty as approved by GE of size 450 x 450 x 75 mm thick with and including 1.25 mm thick mild steel strip on all the four edges heavy duty,RCC frame set in cement mortar 1:4 and similar articles complete as per site requirement, all as specified and directed by Engineer-in-Charge.
Precast cement concrete (Grade M-30) manhole cover SFRC (steel fibre reinforced cover) factory made including suitable precast RCC frame as per manufacturer's instructions, heavy duty as approved by GE of size 900 x 900 x 100 mm thick with and including 1.25 mm thick mild steel strip on all the four edges heavy duty,RCC frame set in cement mortar 1:4 and similar articles complete as pe
r site requirement, all as specified and directed by Engineer-in-Charge.
Precast cement concrete (Grade M-30 with both way reinforcement ) drain cover SFRC (steel fibre reinforced cover) factory made as per manufacturer's instructions, heavy duty as approved by GE of size 600 x 1200 x 100 mm thick with and including 1.25 mm thick mild steel strip on all the four edges heavy duty, complete as per site requirement, all as specified and directed by Engineer-in-Charge.
Precast cement concrete (Grade M-30 with both way reinforcement ) drain cover SFRC (steel fibre reinforced cover) factory made as per manufacturer's instructions, heavy duty as approved by GE of size 600 x 1500 x 100 mm thick with and including 1.25 mm thick mild steel strip on all the four edges heavy duty, complete as per site requirement, all as specified and directed by Engineer-in-Charge.
Precast cement concrete (Grade M-30 with both way reinforcement ) drain cover SFRC (steel fibre reinforced cover) factory made as per manufacturer's instructions, heavy duty as approved by GE as in cover slabs of size 600 x 1700 x 100 mm thick with and including 1.25 mm thick mild steel strip on all the four edges heavy duty, complete as per site requirement, all as specified and directed by Engineer-in-Charge.
Cleaning and removing of blockage from manholes of any size and upto 1.5 metre depth with combined high pressure water jetting cum suction (vaccum) tupe machine mounted on LCV/HCV and having facilties of high pressure shaped nozzle pipe including removing the soil, roots,mud/sludge or any other materials from the manholes in working/running condition and flushing the entire stretch with water to make the stretch clean and functional. removal & depositing any type of sludge/debries to excavated area, spreading necessary insecticides where sludge is deposited all as specified by Engineer-in-Charge.
All as per item No. 21 here-in-before but for circular precast reinforced manhole rings only for increase of manhole depth more than 1.0 metre and upto 2.8 metre complete including SFRC footrest required as per the height all as directed and specified. Note:- Various manholes of different depths are to be provided at site as per site requirement .The tenderer shall quote rates for depth beyond 1.0 metre top portion for this item. Actual payment shall be made based on actual depth provided at site for increase in depth for each manhole beyond 1.0 metre depth top portion. Tenderer should note this aspect while quoting rates against this item.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.29 MB
FinalTender18.pdf
Tender Documents • 2.73 MB
BOQ_829494.xls
BOQ • 0.87 MB
Download all tender documents and submit your bid