Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹13.2 LAdmitted-Finance | -34.00% | ₹13.2 L | L1 | Admitted-Finance |
| 2 | L2₹14.0 LAdmitted-Finance | -30.12% | ₹14.0 L | L2 | Admitted-Finance |
| 3 | L3₹14.0 LAdmitted-Finance | -30.00% | ₹14.0 L | L3 | Admitted-Finance |
| 4 | L4₹15.6 LAdmitted-Finance | -22.20% | ₹15.6 L | L4 | Admitted-Finance |
Tender Value
₹20 L
EMD Value
₹40,000
Closing Date
5 Feb 2026, 6:00 pmClosed
xen rew jammu
xen rew jammu
CONSTRUCTION OF COMMUNITY HALL NEAR DINESH BHARTI ASHRAM WNO. 5 PANCHAYAT GALWADEY CHAK BLOCK MARH UNDER CDF SCHEME 2025-26
2026_RDPR_301299_1
e-NIT No. 772- REWJ of 2025-26 dated 23-01-2026
Open Tender
Civil Works
60 days
xen rew jammu
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
MH 0515
₹40,000
6 Feb 2026
23 Jan 2026
6 Feb 2026
23 Jan 2026
5 Feb 2026
23 Jan 2026
Engagement of Labour for Preparation of Site 4 Labour for 1 days
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: (All kinds of soil)
Providing and Laying in position cement concrete 1 cement :5 fine sand : 10 graded crushed stone aggregates 40 mm size excluding the cost of centring and shuttering - all works upto plinth level
Providing and laying in position cement concrete 1 cement: 3 fine sand :6 graded crushed stone agregates 20 mm size excluding the cost of centring and shuttering - all works upto plinth level
Providing and Laying in positions specified grade of reinforced cement concrete including curing but excluding the cost of centring, shuttering, finishing and reinforcement. All works upto plinth level 1:1.5:3 (1 cement:1.5 coarse sand:3 graded stone aggregate 20 mm nominal size)
Providing and laying cement concrete in retaining walls, return walls (any thickness) including attached pilasters, columns, piers, abutments,pillars, posts,struts,buttresses, string or lacing courses, parapets, coping,bed blocks, plain window sills,fillets, etcupte floor V Level, including curing but excluding the cost of centring, shuttering and finishing with 1:1.5:3 (1 cement:1.5 coarse sand:3)
Reinforced Cement Concrete work in beams, suspended floors, roofs having slope upto 15⁰, Landings,balconies,shelves,chajjas,lintels,bands,plain window sills,staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1.5:3( 1 cement:1.5 coarse sand:3 graded stone aggregate 20 mm nominal size)
Steel reinforcement for R.C.C work including starightening, cutting, bending, placing in position and binding all complete upto plinth level Hot rolled deformed bars Thermo mechanically Treated Bars of grade Fe 500 or more Qty vide item no 4 and 5 @116%
Centring and Shuttering including strutting,propping etc removal of form for Foundation, footings, bases of column etc for mass concrete Pillars AGL
Suspended Beam
Plinth Beam
Edges of slab below 20 cm
Soffit
Sand for12 Km by MT
S/AGG FOR 12 KM BY MT
P/F Sign board of MS steel pipes and sheet of size 2'-6"x2'-0"
P/F Electric Points for light point/ fan point
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.20 MB
BOQ_977652.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid