Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹82.9 LRejected-Finance | L1 | Rejected-Finance EMD Refund only | |
| 2 | L2₹85.1 L+₹2.2 L (2.60%)Rejected-Finance BLDG NO 8 BEHIND BOMBAY STOCK EXCHANGE RAJABHADUR MANSION AMBALAL DOSHI MARG 2ND FLOOR VILLAGE TOWN FORT CITY MUMBAI | L2 | Rejected-Finance EMD Refund only |
Tender Value
₹83.0 L
EMD Value
₹1.7 L
Closing Date
18 Mar 2024, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
ASHWANI KUMAR
PD Narnaul
Resurrection ofChorGumbad at Narnaul in Mohindergarh District.
2024_HRY_360115_1
20248680407D 8131 480C A1A1 C705A2FB8119649BAR
Open Tender
Civil Works
Works
180 days
Narnaul
Resurrection ofChorGumbad at Narnaul.
2 documents required · 2 mandatory
₹5,000
₹1.7 L
Yes
18 Jun 2024
27 Feb 2024
19 Mar 2024
27 Feb 2024
18 Mar 2024
27 Feb 2024
Amount
Demolishing lime concrete manually/by mechanical means and disposal of material within 50 meters lead as per direction of engineer in charge.
Dismantling stone slab (damage and decayed) laid in lime/cement mortar including stacking of serviceable material and disposal of unserviceable material within 50 meters lead.
Careful removal of existing deteriorated/ damaged/weathered lime plaster without damaging the surface below it. Methodology: This Item will execute after erecting scaffolding enabling the safe platform to work and with using precise tools like scalpe to remove the plaster. Precaution will be taken such that surface below the plaster is not damaged.
Technical/scientific excavation to be done manually by way of carefully digging inside the heritage structure. It also includes to avoid any damage to the heritage structure or structure underneath, without causing any vibrations and jerks to the superstructure. It also includes duly constructing centring, struting and form work to avoid any untoward incident and getting out the excavated material manually head lead approx. 50 mtr away from site.
Providing and laying lime concrete with graded brick bats and 50% lime mortar 1:1:1 (1 Slaked lime : 1 Surkhi : 1 Coarse sand) rammed and finished with gur and belgiri treatment excluding cost of centring and shuttering. (Thickness 100 mm).
Consolidating the base area including cutting and filling, rammimg and watering complete to make the surface good for laying of concrete including appropriate slope required to safeguard the surface from rain water.
40 mm thick (Average) fine dressed stone flooring over 20 mm (average) thick base of lime mortar 1:1:1 (1 lime: 1 surkhi:1coarse sand) with joints finished flush.
Reconsolidation works: Stone consolidation-removing the loose/damaged stone and reconsolidating with new stone/reusable stone with lime mortar 1:1:1 (1 Lime: 1 Surkhi 1: Coarse sand ) wherever necessary.
Restoration of missing portion/patch repair with underpinning method by using bond stone techinque: Random rubble masonry with hard stones in foundation and plinth including levelling with lime concete (1 lime: 1 Surkhi: 1 coarse sand) with 20mm stone aggregate upto plinth level with lime mortar 1:1:1(1Lime: 1Surkhi:1Coarse sand)
For rising dampnes: Applying two or more coat of Ethyl Silicate chemical as approved by Archaeological Survey of India/ Engineer-in-charge, of approved brand and manufacturer, with brush or spray on the existing stone masonry surface till there is no further absorption of chemical by stone surface, including protecting the applied surface from direct sunlight by suitable means during application, all complete as per direction of the Engineer-in-Charge (The rate is inclusive of all materials and labours involved except scaffolding).
30-40mm lime plaster in two coats with 20mm base coat in lime mortar 1:1:1 (1 lime : 1 Surkhi :1 Coarse Sand) and top coat in lime mortar 1:1:1 (1 lime : 1 Surkhi :1 Fine Sand).
Construction of tanks of different sizes for slaking of lime and making lime putty as per archaelogical specification: Brick Work with common burnt clay F.P.S (non modular ) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:4 ( 1 cement : 4 coarse sand)
Provision for hiring (for 6 months) of special type of lime mortar mill (pan type) electrical/mechnical for thorough grinding and mixing of lime mortar and making lime putty as per site requirement including diesel and maintenance.
Providing, erecting, maintaining and removing temporary protective screens made out of specified fabric with all necessary fixing arrangement to ensure that it remains in position for the work duration as required by the Engineer-in-charge. Wooven PVC cloth
Removal of blackening, old sulphated lime wash in multiple application without causing damage to the below plastered surface. Scrubbing (not by scraping which leaves surfaces scarred and scratched ) with bristle brushes and hot water ( Care to be taken if the surface is weak one it will break down). Hot water should be used if the blackening/limewash has an oil or tallow binder. Gentle cleaning with air abrasive tools can be used if the wall surface is not very week.The final clean will almost invariably have to be carried out by hand scrubbing and rinsed with clean water on completion. The work should be done under supervision of a trained conservator.
Providing and fixing double scaffolding system (cup lock type) on the exterior side, up to seven storey height made with 40 mm dia M.S. tube 1.5 m centre to centre horizontal and vertical tubes joining with cup and lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staircase system in the scaffoldings for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it thereafter. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc. wherever required for inspection of work at required locations with essential safety features for the workmen etc complete as per directions and approval of Engineer-in-charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. NOTE:- To be used for maintenance work judicially necessary deduction for scaffolding in the existing item to be done
Hiring of water tanker (4500 ltrs) during excution of work. Since the water is salty at site and its not useful for lime mortar work.
Applying breathable, non-reactive, antifungal, and water repellant Silane/ Siloxane chemical as approved by Archaeological Survey of India/ Engineerin- charge, of approved brand and manufacture, diluted with solvent mineral Turpentine oil in the ratio of 1:12 (One part of approved chemical :12 Part of Turpentine oil), on the existing sand stone masonry/plastered wall surface with two or more coats to give uniform application of chemical on the surface, all complete as per direction of Engineer-In-charge (The rate is inclusive of all materials and labours involved except scaffolding).
Curing of Lime concrete/Lime plaster surface with water mixed with milk of lime, pulp of belgiri and jaggery water (Gur/sheera) to achive the required hardness.
Savani Heritage Conservation Private Limited
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .