Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 LAccepted-Finance | L1 | Accepted-Finance First Lowest Tenderer L1 | |
| 2 | L2₹1.8 L+₹2,469.74 (1.41%)Rejected-Finance | L2 | Rejected-Finance Second Lowest Tenderer L2 |
| Sl No | Description | Qty | Unit | NATURAL AIRCON SOLUTION L2 | Naturals Cool L1 |
|---|---|---|---|---|---|
| 1.00 | Supply and fixing of 3 KVA Single Phase input
to Single Phase Output Micro processor Controlled Double Conversion True On line UPS system with Isolation transformer and 12 V -100AH SMF Batteries-6Nos’ with suitable battery Interlink cables for 2 Hours Back up Time and with suitable MS powder coated Rack for Batteries complete with the following specifications.
Configuration:
True On line double conversion UPS system with pulse width modulation (PWM)
Technology using IGBT inverter.
RECTIFIER:
Full wave (shall fully meet the specified input power requirements )
INPUT: Three phase 440V ± 15%
OUT PUT:230V ± 1% on battery mode
FREQUENCY: 47HZ - 53HZ
SYSTEM DC VOLTAGE: 240V DC
INVERSION TECHNOLOGY: Micro processor controlled, pulse width modulation with Instantaneous sine Wave control using IGBT.
INVERTER OUT PUT : ( Out put Galvanic Isolation through Double winding Isolation Transformer at Output of Inverter shall be part of UPS Design )
LOAD POWER FACTOR: 0.9 to unity
REGULATION : for Balanced load ± 1%
For 100% unbalanced load ± 2%
FREQUENCY: 50Hz + 0.5% | 1 | Nos | 1,28,160 ₹1,28,160 | 1,28,000 ₹1,28,000 Lowest |
| 1.01WAVE FORM : Pure sine wave TOTAL HARMONIC DISTORTION : < 3% OVERLOAD CAPACITY: Inverse Time Characteristic 125% for 10 minutes 150% for 1 minutes EFFICIENCY : 1. Converter – 95% 2. Inverter - 95% , 3. Overall >90% ( full load) Operating Temperature : 0 to 45 Degrees centigrade on full load CREAST FACTOR: 3 : 1 RELATIVE Humidity : : 95% at 35 Degree Centigrade non- Condensing CHARGER: Built in solid state automatic float- cum boost charger with constant current, constant, voltage mode of charging along with current limiting features. Ripple in DC shall not exceed 2% when battery is disconnected. PROTECTION( In built) i) output under Voltage, ii) output over Voltage iii) ) output over load, iv) output short circuit. v) HRC fuses /output/ battery , vi) Battery low trip vii) battery charges current limit. INDICATIONS: i. Mains ON, ii. Inverter ON, iii. UPS ON battery, iv. Load On UPS, v. Battery LOW. METERING: i. Output AC Voltage i.Output DC Voltage / Load details and Frequency By Pass: Manual | |||||
| 2.00 | Renewal by Supply and fixing of 4 way Horizontal Triple pole and neutral MCB sheet steel enclosure distribution board with double door (metal) with 1 No 32A 4P MCB as incoming and 12 Nos 6A to 32A SP MCB as outgoing on wall with Earth connection only. Higher End. | 1 | Nos | 7,796 ₹7,796 | 7,550 ₹7,550 Lowest |
| 3.00 | Renewal by Supply and run of 2 of 2.5 sq.mm.PVC insulated SC unsheathed FRLS copper conductor of 1100V grade in suitable PVC rigid pipe on wall and ceiling with continuous earth Wire connection of 2.5 sq.mm copper wire with painting of suitable colour. | 73 | Mtrs | 203 ₹14,819 | 184 ₹13,432 Lowest |
| 4.00 | Less credit (1 %) | 1 | Job | 200 ₹-200 Lowest | 500 ₹-500 |
| 5.00 | GST @ 18% | 1 | Nos | 27,103.5 ₹27,103.5 | 26,726.76 ₹26,726.76 Lowest |
Tender Value
₹1.8 L
EMD Value
₹1,770
Closing Date
16 Nov 2026, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer,Electrical
Office of the Executive Engineer, Electrical,PWD., Electrical Division, Thanjavur-1
Renewal of 3 KVA UPS in Biochemistry Lab in OP Block in Government Medical College Hospital Campus at Pudukkottai in Pudukkottai District.
2026_PWD_720033_1
4-5/2026-27
Open Tender
Electrical Works
Lump-sum
30 days
Pudukottai
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹1,770
18 Nov 2026
30 Oct 2026
17 Nov 2026
30 Oct 2026
16 Nov 2026
30 Oct 2026
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supply and fixing of 3 KVA Single Phase input
to Single Phase Output Micro processor Controlled Double Conversion True On line UPS system with Isolation transformer and 12 V -100AH SMF Batteries-6Nos’ with suitable battery Interlink cables for 2 Hours Back up Time and with suitable MS powder coated Rack for Batteries complete with the following specifications.
Configuration:
True On line double conversion UPS system with pulse width modulation (PWM)
Technology using IGBT inverter.
RECTIFIER:
Full wave (shall fully meet the specified input power requirements )
INPUT: Three phase 440V ± 15%
OUT PUT:230V ± 1% on battery mode
FREQUENCY: 47HZ - 53HZ
SYSTEM DC VOLTAGE: 240V DC
INVERSION TECHNOLOGY: Micro processor controlled, pulse width modulation with Instantaneous sine Wave control using IGBT.
INVERTER OUT PUT : ( Out put Galvanic Isolation through Double winding Isolation Transformer at Output of Inverter shall be part of UPS Design )
LOAD POWER FACTOR: 0.9 to unity
REGULATION : for Balanced load ± 1%
For 100% unbalanced load ± 2%
FREQUENCY: 50Hz + 0.5% | 1 | Nos | - | - |
| 1.01 | WAVE FORM : Pure sine wave
TOTAL HARMONIC DISTORTION : < 3%
OVERLOAD CAPACITY: Inverse Time Characteristic 125% for 10 minutes
150% for 1 minutes
EFFICIENCY : 1. Converter – 95%
2. Inverter - 95% , 3. Overall >90% ( full load)
Operating Temperature : 0 to 45 Degrees centigrade on full load
CREAST FACTOR: 3 : 1
RELATIVE Humidity : : 95% at 35 Degree Centigrade non- Condensing
CHARGER: Built in solid state automatic float- cum boost charger with constant current, constant, voltage mode of charging along with current limiting features. Ripple in DC shall not exceed 2% when battery is disconnected.
PROTECTION( In built)
i) output under Voltage, ii) output over Voltage
iii) ) output over load, iv) output short circuit.
v) HRC fuses /output/ battery , vi) Battery low trip
vii) battery charges current limit.
INDICATIONS:
i. Mains ON, ii. Inverter ON, iii. UPS ON battery,
iv. Load On UPS, v. Battery LOW.
METERING:
i. Output AC Voltage
i.Output DC Voltage / Load details and Frequency
By Pass: Manual | - | - | - | - |
| 2 | Renewal by Supply and fixing of 4 way Horizontal Triple pole and neutral MCB sheet steel enclosure distribution board with double door (metal) with 1 No 32A 4P MCB as incoming and 12 Nos 6A to 32A SP MCB as outgoing on wall with Earth connection only. Higher End. | 1 | Nos | - | - |
| 3 | Renewal by Supply and run of 2 of 2.5 sq.mm.PVC insulated SC unsheathed FRLS copper conductor of 1100V grade in suitable PVC rigid pipe on wall and ceiling with continuous earth Wire connection of 2.5 sq.mm copper wire with painting of suitable colour. | 73 | Mtrs | - | - |
| 4 | Less credit (1 %) | 1 | Job | - | - |
| 5 | GST @ 18% | 1 | Nos | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.09 MB
COND31UPSGHPDKTPDF.pdf
Tender Documents • 0.98 MB
BOQ_864667.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .