| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹29.4 CrAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹29.7 Cr+₹32.7 L (1.11%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹29.7 Cr+₹33.4 L (1.13%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L3₹29.7 Cr+₹33.4 L (1.13%)Admitted-Finance | L3 | Admitted-Finance | ||
| 5 | L3₹29.7 Cr+₹33.4 L (1.13%)Admitted-Finance | L3 | Admitted-Finance |
Tender Value
₹33.0 Cr
Closing Date
12 Oct 2022, 5:00 pmClosed
OSD-Chief Engineer (Buildings), Odisha, Bhubaneswa
O/o. the E.I.C. (Civil), Odisha, Unit-V, Nirman Soudha, Bhubaneswar.
Construction of Permanent building for the office of Lokayukta, Odisha at Bharatpur, Bhubaneswar.
2022_EICCL_81826_1
OSD C.E. (B) - 24 / 2022-23
Open Tender
Civil Works - Buildings
Percentage
547 days
BHUBANESWAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
Exempted
28 Oct 2022
27 Sept 2022
13 Oct 2022
27 Sept 2022
12 Oct 2022
27 Sept 2022
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1CIVIL WORK Earth work in excavation IN ALL KINDS OF SOILS by manual means overareas (exceeding 30 cm in depth, 1.5 m in width as well as 10sqm on plan) inculding disposal of excavated earth up to 50 m and lift upto 1.5m with all lead and lift including shoring, shuttering & dewatering (if required) with cost of all Labour, Labour cess ,Hire & Running charges of the water pumps, Sundries, T & P required for the work complete as directed by the Engineer- in- charge. | |||||
| 1.01 | Building Proper | 3,457.74 | Cum | 215.2 | ₹7,44,105.65 |
| 1.02 | DRAIN | 207.79 | Cum | 215.2 | ₹44,716.41 |
| 1.03 | BOUNDARY WALL | 142.63 | Cum | 215.2 | ₹30,693.98 |
| 1.04 | GATE | 13.35 | Cum | 215.2 | ₹2,872.92 |
| 2Earth work in hard soil or gravelly soil within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge.+1.5m extra lift. | |||||
| 2.01 | Building Proper | 4,722.17 | Cum | 230.73 | ₹10,89,546.28 |
| 3Supplying and filling in foundation trenches and plinth, ditches with sand well watered and rammed in layers not exceeding 23 cm. in depth with all lead and lift including cost, conveyance, loading, unloading, royalties and taxes of all materials, cost of all labour,labour cess, sundries, T&P required for the work etc. complete in all respect as per direction by the Engineer in charge. | |||||
| 3.01 | Building Proper | 1,088.94 | Cum | 335.3 | ₹3,65,121.58 |
| 3.02 | DRAIN | 21.87 | Cum | 335.3 | ₹7,333.01 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.57 MB
DTCN.pdf
Tender Documents • 1.55 MB
BOQ_411866.xls
BOQ • 1.08 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .