Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹79,296Accepted-AOC H NO 24 2 NEAR GOVT SWASTHYA KENDRA VILL BHALUHI TOLA TEH DEOSAR PO ODGADI BARGARWAN DISTT SINGRAULI MP | SINGRAULI | MP | ₹79,296 | L1 | Accepted-AOC AWARD OF WORK TO L1 BIDDER AND REJECT L2 AND L3 BIDDER DUE TO NOT L1 BIDDER |
| 2 | Rejected-Technical 01 KACHNI MOD KACHANI PO KACHANI DISTT SINGRAULI M P 486886 | SINGRAULI | SINGRAULI | MADHYA PRADESH | 486886 | - | - | Rejected-Technical NOT L1 BIDDER |
| 3 | Rejected-Technical SIMPLEX COLONY JAYANT P O JAYANT DIST SINGRAULI M P PIN 486890 | JAYANT | SINGRAULI | MADHYA PRADESH | 486890 | - | - | Rejected-Technical NOT L1 BIDDER |
| Sl No | Description | Qty | Unit | M/s A.K. Chaubey L2 | BIMLA ASSOCIATES L3 | SINGH ASSOCIATES L1 |
|---|---|---|---|---|---|---|
| 1.00Scope of Work/Technical Specifications etc: - Fabrication of Oil drain trolley and Oil barrel loading-unloading ramp stand for Dozer workshop at Khadia Project.Fabrication of Oil drain trolley – 03 nos. and Oil barrel loading-unloading ramp stand – 03 nos. as per the specifications provided by Incharge, Dozer workshop. Note: The deployment of manpower will be 1. Skilled Fitter for 30 manshift, 2. Skilled Welder for 48 manshift 3. Un-Skilled for 60 manshift. | ||||||
| 2.10 | Labour Charges for fabrication of a Oil drain trolley including contractor's profit. | 3 | Job | 9,999 ₹29,997 | 6,500 ₹19,500 | 8,000 ₹24,000 |
| 2.20 | Labour Charges for fabrication of a Oil barrel loading- unloading ramp stand including contractor's profit. | 3 | Job | 13,000 ₹39,000 | 6,500 ₹19,500 | 8,000 ₹24,000 |
| 3.00Hiring charges | ||||||
| 3.10 | Welding Machine - 01 no. | 15 | Day | 50 ₹750 | 1,000 ₹15,000 | 700 ₹10,500 |
| 3.20 | Grinder Heavy duty - 01 no. | 15 | Day | 50 ₹750 | 500 ₹7,500 | 300 ₹4,500 |
| 3.30 | Grinding wheel 100mm*25mm | 12 | Nos. | 100 ₹1,200 | 300 ₹3,600 | 100 ₹1,200 |
| 3.40 | Gas Cutting Set with accessories - 01 no. | 15 | Day | 50 ₹750 | 1,000 ₹15,000 | 200 ₹3,000 |
| 4.00 | Total impact of GST for the purpose of CTC | 1 | No. | - | - | - |
Tender Value
₹1.2 L
EMD Value
₹1,600
Closing Date
4 Mar 2026, 11:00 amClosed
GENERAL MANAGER EXCAVATION, NCL KHADIA PROJECT
NCL KHADIA PROJECT, SHAKTINAGAR, SONEBHADRA, U.P.-231222
Fabrication of Oil drain trolley and Oil barrel loading-unloading ramp stand for Dozer workshop at Khadia Project.
2026_NCL_353672_1
KHD/G.M. (Excv)/E-Tender/25-26/1224
Open Tender
Excavation Department Work
15 days
NCL KHADIA PROJECT, SHAKTINAGAR
Please refer Tender documents.
5 documents required · 5 mandatory
₹1,600
7 Jun 2026
19 Feb 2026
5 Mar 2026
19 Feb 2026
4 Mar 2026
20 Feb 2026
19 Feb 2026 - 28 Feb 2026
Scope of Work/Technical Specifications etc: - Fabrication of Oil drain trolley and Oil barrel loading-unloading ramp stand for Dozer workshop at Khadia Project.Fabrication of Oil drain trolley – 03 nos. and Oil barrel loading-unloading ramp stand – 03 nos. as per the specifications provided by Incharge, Dozer workshop. Note: The deployment of manpower will be 1. Skilled Fitter for 30 manshift, 2. Skilled Welder for 48 manshift 3. Un-Skilled for 60 manshift.
Labour Charges for fabrication of a Oil drain trolley including contractor's profit.
Labour Charges for fabrication of a Oil barrel loading- unloading ramp stand including contractor's profit.
Hiring charges
Welding Machine - 01 no.
Grinder Heavy duty - 01 no.
Grinding wheel 100mm*25mm
Gas Cutting Set with accessories - 01 no.
Total impact of GST for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_366482.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.16 MB
COC_ATC.pdf
Tender Documents • 1.44 MB
BOQ_366482.xls
BOQ • 0.33 MB
ITB.pdf
Tender Documents • 0.38 MB
Annexures.pdf
Tender Documents • 0.80 MB
Download all tender documents and submit your bid