| 1 | 1₹4.7 CrAccepted-AOC | ₹4.7 Cr | 1 | Accepted-AOC Qualified |
| 2 | 2₹4.8 Cr+₹7.0 L (1.50%)Rejected-AOC | ₹4.8 Cr+₹7.0 L (1.50%) | 2 | Rejected-AOC Not qualified |
Tender Value
₹4.7 Cr
EMD Value
₹9.4 L
Closing Date
26 Oct 2022, 2:00 pmClosed
Chief Engineer, PWD(Roads), Assam
O/o the Chief Engineer, PWD(Roads), Assam
Re-construction of Mon Akashi Path, Bishnu Mandir Road, Jyotinagar by providing RCC retaining wall, Stone masonry guard wall and road work under SOPD(G) for the year 2022-23
2022_PWD_27414_1
No. CE/CW/40/2022-23-MonAkashiPath
Open Tender
Civil Works – Roads
Item Rate
180 days
Guwahati
Please refer Tender documents.
5 documents required · 5 mandatory
₹10,000
₹9.4 L
Yes
10 Mar 2023
22 Oct 2022
26 Oct 2022
22 Oct 2022
26 Oct 2022
22 Oct 2022
22 Oct 2022 - 26 Oct 2022
Amount
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable materials to beused or auctioned up to lead of 1000metres including removal and disposal of top organic soil not exceeding 150mm thickness., By manual means, In area of thorny jungle
Scarifying existing bituminous surface to a depth of 50 mm by mechanical means (Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with in all lifts and lead upto 1000 metres.)
Construction of Granular Sub Base (GSB) by providing coarse graded materials, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per cl.401 (with an initial lead of 5 Km.) (ii) for Grading-I Material
Water Bound Macadam (Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening Type-B/binding material to fillup the interstices of coarse aggregate,watering and compacting to the reqd. density ( with an initial lead of 5.0 km. ) B) Grading-III material
Providing and laying Interlocking Concrete Block Pavement (ICBP) conforming to IS:15658-2006 including all lead and lift complete as per technical specification and as directed.
Back filling behind abutment, wing wall and return wall complete as per Drawing & Technical Specification Clause 1204.3.8(B), Sandy Materials
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom,backfilling the excavated earth to the extent required and utilising theremaining earth locally for road work.), 'Manual Means (Depth upto 3 m)( Without dewatering
Removal of Unserviceable Soil with Disposal upto 1000 metres (Removal of unserviceable soil including excavation, loading and disposal upto 1000 metres lead but excluding replacement by suitable soil which shall be paid separately as per clause 305.)
Dry rubble Flooring, Construcytion of dry rubbl flooring at cross drainage works for relatively less important works.
Plain/Reinforced Cement Concrete in Open foundation complete as per Drawing and Technical Specification clause 802, 803, 1202 & 1203. , PCC Grade M-15, With crushed stone
Supplying,fitting and placing MS bar (Fe-500 D) reinforcement bar in substructure complete as per drawing and technical specification IS:1786 (Fe-500 D) Primery Producer (ISI approved) Cl. 1002, 1005, 1010 & 1202
Plain/Reinforced cement concrete, in sub structure complete as per drawing and technical specification and steel shuttering formwork , RCC Grade M20, Ht upto 5 m, Using concrete mixture
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specification.
Providing and laying Filter material underneath with granular materials / stone crushed aggregate ---------- complete as per drawing and Technical specification
Back Filling behind abutment, wing wall and return wall complete as per Drawing & Technical Specification
Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications
Loading and unloading by manual means, Stone aggregate complete as directed
Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical specifications
Tubular Steel Railing on Precast RCC posts, 1.2 m high above ground level (Providing, fencing and erecting 50 mm dia painted steel pipe railing in 3 rows on precast M20 grade RCC vertical posts1.8 metres high (1.2 m above GL) with 3 holes 50 mm dia for pipe, fixed 2meters center to center, complete as per approved drawing.
RUPALI KAR PAUL
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .