| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L2₹28.2 LAccepted-AOC NEAR KAMAKHAYA HS SCHOOL KAMAKHYA DHAM P O KAMAKHYA P S JALUKBARI KAMRUP M PIN 781010 | GUWAHATI | KAMRUP M | ASSAM | 781010 | ₹28.2 L | L2 | Accepted-AOC Awarded |
| 2 | L1₹27.7 LRejected-Finance VILL LACHIMA P O SARTHEBARI P S SARTHEBARI DIST BARPETA ASSAM PIN 781307 | SARTHEBARI | BARPETA | ASSAM | 781307 | ₹27.7 L | L1 | Rejected-Finance Refer to Financial minutes. |
| 3 | L3₹28.4 LRejected-Finance | ₹28.4 L | L3 | Rejected-Finance Refer to Financial minutes. |
| 4 | L4₹28.8 LRejected-Finance | ₹28.8 L | L4 | Rejected-Finance Refer to Financial minutes. |
| 5 | L5₹29.1 LRejected-Finance KAMALPUR P O BAIHATA P S KAMALPUR DIST KAMRUP | KAMRUP | ASSAM | 781030 | ₹29.1 L | L5 | Rejected-Finance Refer to Financial minutes. |
| Sl No | Description | Qty | Unit | Deraj Saikia L5 | M/S B.S. ENTERPRISE L7 | DHRUBA JYOTI SARMA L2 | BIPUL KAKATI L8 | MD SONAR UDDIN L3 | Saiful Islam L6 | SOROLAM ASSOCIATES L1 | PARAG TALUKDAR L4 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00PART-A (Construction of Boulder Revetment) | |||||||||||
| 1.01 | Earth work in excavation of foundation of structures as per draw-ing and technical specification, (i) Ordinary soil | 571.59 | m³ | 120.59 ₹68,928.04 | 122.9 ₹70,248.41 | 117.12 ₹66,944.62 | 128.68 ₹73,552.20 | 117.84 ₹67,356.17 | 121.46 ₹69,425.32 | 114.95 ₹65,704.27 | 119.29 ₹68,184.97 |
| 1.02 | Providing and laying boulder apron for bed protection with stone boulders of minimum size and weight as per Table1300.1, no fragment weighing less than 25 kg laid dry complete as per drawing and technical specifications Clause 1301 | 89.29 | m³ | 1,634.38 ₹1.5 L | 1,665.73 ₹1.5 L | 1,587.35 ₹1.4 L | 1,744.12 ₹1.6 L | 1,597.14 ₹1.4 L | 1,646.14 ₹1.5 L | 1,557.95 ₹1.4 L | 1,616.74 ₹1.4 L |
| 1.03 | Providing & laying of boulder apron laid in wire crates made with 4 mm dia G.I. wire conforming to IS :280 & IS 4826 in 100 mm x 100 mm Mesh (weaved diagonally) including 10% extra for laps and joints laid with stone boulders weighing not less than 40kg.each. | 732.16 | m³ | 2,442.14 ₹17.9 L | 2,488.99 ₹18.2 L | 2,371.87 ₹17.4 L | 2,606.12 ₹19.1 L | 2,386.5 ₹17.5 L | 2,459.71 ₹18.0 L | 2,327.94 ₹17.0 L | 2,415.79 ₹17.7 L |
| 1.04 | Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specification. | 48.81 | m³ | 1,799.92 ₹87,855.90 | 1,834.45 ₹89,541.34 | 1,748.13 ₹85,327.97 | 1,920.78 ₹93,755.19 | 1,758.92 ₹85,854.64 | 1,812.87 ₹88,488 | 1,715.75 ₹83,747.47 | 1,780.5 ₹86,907.99 |
| 1.05 | Providing and laying Pitching on slopes laid over prepared filter media complete as per drawing and Technical specifications . A) Stone/Boulder | 146.43 | m³ | 1,634.38 ₹2.4 L | 1,665.73 ₹2.4 L | 1,587.35 ₹2.3 L | 1,744.12 ₹2.6 L | 1,597.15 ₹2.3 L | 1,646.14 ₹2.4 L | 1,557.95 ₹2.3 L | 1,616.74 ₹2.4 L |
| 1.06 | Earth work in filling with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting with a lead upto 1000 m as per Technical Specification.
i. From Private Land | 923.87 | m³ | 226.78 ₹2.1 L | 231.13 ₹2.1 L | 220.26 ₹2.0 L | 242 ₹2.2 L | 221.61 ₹2.0 L | 228.41 ₹2.1 L | 216.18 ₹2.0 L | 224.33 ₹2.1 L |
| 1.07 | Cost of RCC sign board including painting , writing & fitting fixing at project site, complete. | 1 | No. | 9,912.12 ₹9,912.12 | 10,101.13 ₹10,101.13 | 9,614.36 ₹9,614.36 | 10,699.64 ₹10,699.64 | 9,687.37 ₹9,687.37 | 9,980.24 ₹9,980.24 | 9,445.17 ₹9,445.17 | 9,804.43 ₹9,804.43 |
| 2.00PART-B (Construction of Boulder Spur) | |||||||||||
| 2.01 | Earth work in excavation of foundation for structures as per drawing & technical specification, including setting out, construction of shoring & bracing, removal of stumps & other deleterious matter, dressing of sides & bottom and backfilling in trenches with approved material. | 54.45 | m³ | 120.59 ₹6,566.13 | 122.9 ₹6,691.91 | 117.12 ₹6,377.18 | 126.68 ₹6,897.73 | 117.84 ₹6,416.39 | 121.46 ₹6,613.50 | 114.95 ₹6,259.03 | 119.29 ₹6,495.34 |
Tender Value
₹34.9 L
EMD Value
₹69,728
Closing Date
19 Jan 2026, 1:00 pmClosed
Director of Soil Conservation
O/o The DSC, Bhumi sangrakshan bhanvan, RGB Road, Guwahati -05
Anti Erosion Measures With Boulder Revetment Work on The Bank of Turkunijan At Village Nalana under RIDFXXXI
2025_SCD_49657_14
Tender/NIT/Pt-I/2025-26/5725
Open Tender
Civil Works
120 days
Barpeta S. C. Division
Please refer Tender documents.
3 documents required · 3 mandatory
₹700
₹69,728
Yes
O/o The DSC, Assam
13 May 2026
26 Dec 2025
19 Jan 2026
3 Jan 2026
19 Jan 2026
8 Jan 2026
7 Jan 2026
PART-A (Construction of Boulder Revetment)
Earth work in excavation of foundation of structures as per draw-ing and technical specification, (i) Ordinary soil
Providing and laying boulder apron for bed protection with stone boulders of minimum size and weight as per Table1300.1, no fragment weighing less than 25 kg laid dry complete as per drawing and technical specifications Clause 1301
Providing & laying of boulder apron laid in wire crates made with 4 mm dia G.I. wire conforming to IS :280 & IS 4826 in 100 mm x 100 mm Mesh (weaved diagonally) including 10% extra for laps and joints laid with stone boulders weighing not less than 40kg.each.
Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specification.
Providing and laying Pitching on slopes laid over prepared filter media complete as per drawing and Technical specifications . A) Stone/Boulder
Earth work in filling with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting with a lead upto 1000 m as per Technical Specification. i. From Private Land
Cost of RCC sign board including painting , writing & fitting fixing at project site, complete.
PART-B (Construction of Boulder Spur)
Earth work in excavation of foundation for structures as per drawing & technical specification, including setting out, construction of shoring & bracing, removal of stumps & other deleterious matter, dressing of sides & bottom and backfilling in trenches with approved material.
Providing and laying boulder apron for bed protection with stone boulders of minimum size and weight as per Table1300.1, no fragment weighing less than 25 kg laid dry complete as per drawing and technical specifications Clause 1301
Providing and laying of boulder apron laid in wire crates made with conforming to IS:280 & IS:48264 mm dia GI wire in 100mm x 100mm mesh weaved diagonally including 10% extra for laps and joints laid with stone boulders weighting not less than 40Kg each.
Please Enable Macros to View BoQ information
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.85 MB
BIDBarpetaNalana.pdf
Tender Documents • 1.03 MB
BOQ_78877.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid