| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.7 LAccepted-AOC | L1 | Accepted-AOC L1 bidder | |
| 2 | L2₹6.7 L+₹99,120 (17.4%)Rejected-Finance VILL DAKSHIN SHIBGANJ P O AND P S PATHARPRATIMA DIST SOUTH 24 PARGANAS | SOUTH 24 PARGANAS | WEST BENGAL | L2 | Rejected-Finance 2nd lowest bidder | |
| 3 | L3₹6.8 L+₹1.1 L (19.7%)Rejected-Finance 230 S N ROY ROAD SAHAPUR COLONY KOLKATA WEST BENGAL 700038 | KOLKATA | WEST BENGAL | 700038 | L3 | Rejected-Finance 3rd lowest bidder |
| Sl No | Description | Qty | Unit | switching avo Electro Power Ltd L3 | B. ENGINEERING CO. L2 | Dcon Enterprise L1 |
|---|---|---|---|---|---|---|
| 1.00SITC of UPS including Battery Bank of for each UPS (SMF Battery) 12 Volt Three phase Input and three phase Output, inbuilt Isolation Transformer, static by pass arrangement, compatible with D.G. Set, DSP controlled IGBT based rectifier with minimum 90% efficiency on 100% Load. The UPS shall be provided with active input P.F. Correction system to obtain 0.9 lag at 100% resistive Load, Wave form - Pure line wave.THD of Voltage should be <1% for linear load and <5% for non -linear load ,DC ripple voltage <1% ,Noise should be less than 55 dB. It Should be capable of operating in 50 deg c above ambient temperature, Built in Solid State float cum boost charger with automatic boost / trickel charge mode with current Limiting features. The charger should be designed for at least 15% of the total battery current. The UPS Should have current limiting protection, built in over load / Short circuit protection with snubber circuits for current limit. Soft start arrangement, Over voltage / under voltage protection, mains ON, Inverter ON/ OFF/ FAULTY/ TRIP (Reason), Charger ON/ FAULTY or TRIP, Battery Low, Static by-pass ON, Over temperature. Battery set Complete with suitable rating DC MCCB & battery links, self-standing cubicle or cabinet. Graphical LCD display for Input & output voltage, current & frequency Battery -voltage & current The UPS should have external automatic load transfer switch for parallel operation./ paralleing kit and suitable size battery rack. | ||||||
| 1.01Regulated Sealed Lead Acid Battery, Construction type : AGM or VRSLAB in ABS Flame Retardant (12V, SMF Battery) Back up time 30 Min at full load.Warranty : Two (02) Year on UPS and two (02) Years on SMF Battery on site against any manufacturing defects, repair or replacement. Certificate : ISO 9001:2015, ISO 14001:2015, IOS 18001,OHSAS 18001. CE Certification: IEC/ EN 62040-1-1, IEC/ EN50091- 1,IEC/EN 60950(Safety),IEC/ EN 5009 I-2,IEC/ EN 62040-2(EMC Emmission), IEC/EN 62040-3 (Performance & Design), IEC/EN 61000-4(EMC Emmunity) & IEC/ EN 60146 (Design & Manufacture) | ||||||
| 1.02(Battery Make Amararaja Quntra/ Exide Power Safe.) (UPS Make: APC / Schneider Electric / Numeric / VERTIV/ Switching AVO/ Dell /) | ||||||
| 1.03 | 20 KVA with minimum 22319 VAH battery bank ( Three Phase IN & Three Phase OUT) | 1 | Set | 5,21,790 ₹5,21,790 | 5,90,500 ₹5,90,500 | 4,62,899 ₹4,62,899 Lowest |
| 2.00Distribution wiring in 1.1 KV single core stranded 'FR' PVC insulated & unsheathed copper wire (Brand approved by EIC) in 20/25/40mm size PVC rigid conduit 'FR' (Precision make) incl. necy. fittings as required. | ||||||
| 2.01 | 5 x 126/0.4 (16 sqmm) as ECC | 45 | RM | 1,694 ₹76,230 | 500 ₹22,500 Lowest | 1,401 ₹63,045 |
| 3.00Finishing of the PVC insulated wire ends by socketing with pin/ ring type copper sockets and insulated tapes etc., including supplying sockets, tapes. | ||||||
| 3.01 | 5 x 126/0.4 (16sq. mm) ECC | 6 | Sets | 153 ₹918 | 120 ₹720 | 97 ₹582 Lowest |
| 4.00 | Supply and fixing of combined units with interlocked switched sockets IP 66 of rating 380 to 415 V, 50/60 Hz, 63 A, 3P + N + E-FP, with 63A FP mccb make legrand cat no:- 5078 64 | 2 | Each | 35,600 ₹71,200 | 23,500 ₹47,000 | 13,200 ₹26,400 Lowest |
| 5.00 | Supply and fixing of straight plug make 380/415 V,63 A 3P+N+E make Legrand cat no :- 5555 29 | 2 | Each | 6,281 ₹12,562 | 4,320 ₹8,640 Lowest | 8,657 ₹17,314 |
Tender Value
₹7.0 L
EMD Value
₹14,080
Closing Date
29 Aug 2025, 12:00 pmClosed
Exe. Engr.-II, Kol. South Health El. Divn., PWDte
75 D H Road Kidderpore Kol_23
Electrical Installation work for setting up new blood component separation and blood storage unit beside blood bank at ground floor of IPD building at M R Bangur Hospital , South 24 Pgs._SITC of UPS System
2025_WBPWD_887006_1
WBPWD/EE-II/KSHED/Q47/25-26
Open Tender
Electrical Work/ Equipment
Item Rate
30 days
Kolkata
Please refer Tender documents.
4 documents required · 4 mandatory
₹14,080
O/o Exe. Engr., Kol. South Health El. Divn., PWDte
3 Sept 2026
4 Aug 2025
1 Sept 2025
4 Aug 2025
29 Aug 2025
12 Aug 2025
11 Aug 2025
Amount
SITC of UPS including Battery Bank of for each UPS (SMF Battery) 12 Volt Three phase Input and three phase Output, inbuilt Isolation Transformer, static by pass arrangement, compatible with D.G. Set, DSP controlled IGBT based rectifier with minimum 90% efficiency on 100% Load. The UPS shall be provided with active input P.F. Correction system to obtain 0.9 lag at 100% resistive Load, Wave form - Pure line wave.THD of Voltage should be <1% for linear load and <5% for non -linear load ,DC ripple voltage <1% ,Noise should be less than 55 dB. It Should be capable of operating in 50 deg c above ambient temperature, Built in Solid State float cum boost charger with automatic boost / trickel charge mode with current Limiting features. The charger should be designed for at least 15% of the total battery current. The UPS Should have current limiting protection, built in over load / Short circuit protection with snubber circuits for current limit. Soft start arrangement, Over voltage / under voltage protection, mains ON, Inverter ON/ OFF/ FAULTY/ TRIP (Reason), Charger ON/ FAULTY or TRIP, Battery Low, Static by-pass ON, Over temperature. Battery set Complete with suitable rating DC MCCB & battery links, self-standing cubicle or cabinet. Graphical LCD display for Input & output voltage, current & frequency Battery -voltage & current The UPS should have external automatic load transfer switch for parallel operation./ paralleing kit and suitable size battery rack.
Regulated Sealed Lead Acid Battery, Construction type : AGM or VRSLAB in ABS Flame Retardant (12V, SMF Battery) Back up time 30 Min at full load.Warranty : Two (02) Year on UPS and two (02) Years on SMF Battery on site against any manufacturing defects, repair or replacement. Certificate : ISO 9001:2015, ISO 14001:2015, IOS 18001,OHSAS 18001. CE Certification: IEC/ EN 62040-1-1, IEC/ EN50091- 1,IEC/EN 60950(Safety),IEC/ EN 5009 I-2,IEC/ EN 62040-2(EMC Emmission), IEC/EN 62040-3 (Performance & Design), IEC/EN 61000-4(EMC Emmunity) & IEC/ EN 60146 (Design & Manufacture)
(Battery Make Amararaja Quntra/ Exide Power Safe.) (UPS Make: APC / Schneider Electric / Numeric / VERTIV/ Switching AVO/ Dell /)
20 KVA with minimum 22319 VAH battery bank ( Three Phase IN & Three Phase OUT)
Distribution wiring in 1.1 KV single core stranded 'FR' PVC insulated & unsheathed copper wire (Brand approved by EIC) in 20/25/40mm size PVC rigid conduit 'FR' (Precision make) incl. necy. fittings as required.
5 x 126/0.4 (16 sqmm) as ECC
Finishing of the PVC insulated wire ends by socketing with pin/ ring type copper sockets and insulated tapes etc., including supplying sockets, tapes.
5 x 126/0.4 (16sq. mm) ECC
Supply and fixing of combined units with interlocked switched sockets IP 66 of rating 380 to 415 V, 50/60 Hz, 63 A, 3P + N + E-FP, with 63A FP mccb make legrand cat no:- 5078 64
Supply and fixing of straight plug make 380/415 V,63 A 3P+N+E make Legrand cat no :- 5555 29
Terms and Condition:
The Agency must procure the materials from the Manufacturer / OEM or from their authorised sales channel so that the standard warranty / support of the Manufacturer / OEM becomes applicable to the products to be delivered and installed by them.
Documents that authenticates such procurement from the Manufacturer / OEM or from their authorized sales channel and standard warranty / support should be sent from the e-mail of the Manufacturer / OEM / authorized sales channel to the e-mail of Engineer-in-Charge and hard copy of it to be submitted during execution, of work/submission of bill.
If any refurbished material is supplied and installed, penal action will be taken as per existing rules
Defect Liability Period - Two (02) Year on UPS and two (02) Years on SMF Battery
Make & model of each and every material to be approved by EIC
B. ENGINEERING CO. (BID ID -6883310)
switching avo Electro Power Ltd (BID ID -6836854)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .