| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.7 LAccepted-Finance | ₹7.7 L | L1 | Accepted-Finance L1 |
| 2 | L2₹7.8 L+₹14,609 (1.90%)Rejected-Finance | ₹7.8 L+₹14,609 (1.90%) | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | Swathi Construction L2 | JM CONSTRUCTIONS L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in ordinary soil, light black cotton sandy loam and dry silt including shoring, strutting, baling or pumping out water wherever necessary and refilling the sides of foundation with excavated earth in layers of 15cm thick and depositing the surplus earth at places as directed by the departmental officers with initial lead and lift | 205 | m3 | 110 ₹22,550 | 108 ₹22,140 Lowest |
| 1.10 | Plain cement concrete 1:4:8 mix (One cement four sand and eight aggregate) using 40mm size ISS gauge HBBG metal including mixing, laying, consolidating, curing, cost and conveyance of all materials to site and all labour charges etc., complete as per standard specification | 23 | m3 | 5,267 ₹1,21,141 | 5,170 ₹1,18,910 Lowest |
| 1.20Supplying and errecting centering to sides and soffits including supports and strutting for drainage sides and culvert body wall sides using M.S Sheets of size 90cm x 60cm and B.G 10stifened with welded mild steel angles of size 25mm x 25mm x 3mm for boarding laid over( silver oak joists ) of size 10cm x 6.50cm spread at about 90cm including all labour charges and cost and conveyance of all materials to site etc. complete Complying with Standard Specification | |||||
| 1.30 | Plain surface | 6.5 | m2 | 1,168 ₹7,592 | 1,146 ₹7,449 Lowest |
| 1.40 | upto 1.0m height | 343 | m2 | 532 ₹1,82,476 | 522 ₹1,79,046 Lowest |
| 1.50 | Plain cement concrete 1:2:4 mix (One cement two sand and four aggregate) using 20mm size ISS gauge HBBG metal including mixing, laying, consolidating, curing, cost and conveyance of all materials to site and all labour charges etc., complete as per standard specification | 44 | m3 | 6,623 ₹2,91,412 | 6,501 ₹2,86,044 Lowest |
| 1.60 | Providing and laying in position, standardized concrete mix M-20 Grade in accordance with IS 456-2000,using 20mm and downgraded hard broken granite stone jelly for all RCC items of works with minimum cement concrete of 325kg/M3 and maximum water cement ratio of 0.55, including admixture (plasticizer/super plasticizer) in recommended proportions as per IS :9103 to accelerate ,retard setting of concrete , improve workability without preparing strength and durability with about ( 5 cu.m) 7730 kg of 20mm machine crushed stone jelly and with about (3.30cu.m) 5156 kg of 10-12mm machine crushed stone jelly and with about (4.79cu.m) 7670kg of sand, but excluding cost of reinforcement grill and fabricating charges , centering and shuttering and also including laying , vibrating with mechanical vibrators ,finishing curing etc., and providing fixtures like fan clamps in the RCC floor/roof slabs wherever necessary without claiming etc., complete | 6 | m3 | 8,371 ₹50,226 | 8,216 ₹49,296 Lowest |
| 1.70 | Supply and fabrication and placing in position of TMT steel roads to required size and length as directed by the departmental officers including cost of binding wire, cutting, bending and tying with proper position etc., including cost and conveyance of all materials to site and all labour charges etc., complete Complying with Standard Specification | 480 | Kg | 93 ₹44,640 | 91 ₹43,680 Lowest |
| 1.80 | Plastering with cement mortar 1:3 mix, 20mm thick including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc. complete . complying with std. specifications | 94 | m2 | 596 ₹56,024 | 585 ₹54,990 Lowest |
| 1.90 | Conveyance of Excavated Excess Earth away from the site to 2km including loading and transportation charges etc., complete as per standard Specification. | 103 | m3 | 69 ₹7,107 | 68 ₹7,004 Lowest |
Tender Value
₹9.3 L
EMD Value
₹9,250
Closing Date
10 Jul 2025, 3:00 pmClosed
THE COMMISSIONER
Salem City Municipal Corporation, Fort Main Road, Salem
Storm water Drain at Valivaikal Kaliamman koil street in Division no 55 Kondalampatty Ward office.
2025_MAWS_575407_1
E8-Est no 666-D-2024-2025
Open Tender
Civil Works
Lump-sum
90 days
Salem city Municipal Corporation
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹9,250
21 Aug 2026
28 Jun 2025
10 Jul 2025
28 Jun 2025
10 Jul 2025
28 Jun 2025
Amount
Earth work excavation for foundation in ordinary soil, light black cotton sandy loam and dry silt including shoring, strutting, baling or pumping out water wherever necessary and refilling the sides of foundation with excavated earth in layers of 15cm thick and depositing the surplus earth at places as directed by the departmental officers with initial lead and lift
Plain cement concrete 1:4:8 mix (One cement four sand and eight aggregate) using 40mm size ISS gauge HBBG metal including mixing, laying, consolidating, curing, cost and conveyance of all materials to site and all labour charges etc., complete as per standard specification
Supplying and errecting centering to sides and soffits including supports and strutting for drainage sides and culvert body wall sides using M.S Sheets of size 90cm x 60cm and B.G 10stifened with welded mild steel angles of size 25mm x 25mm x 3mm for boarding laid over( silver oak joists ) of size 10cm x 6.50cm spread at about 90cm including all labour charges and cost and conveyance of all materials to site etc. complete Complying with Standard Specification
Plain surface
upto 1.0m height
Plain cement concrete 1:2:4 mix (One cement two sand and four aggregate) using 20mm size ISS gauge HBBG metal including mixing, laying, consolidating, curing, cost and conveyance of all materials to site and all labour charges etc., complete as per standard specification
Providing and laying in position, standardized concrete mix M-20 Grade in accordance with IS 456-2000,using 20mm and downgraded hard broken granite stone jelly for all RCC items of works with minimum cement concrete of 325kg/M3 and maximum water cement ratio of 0.55, including admixture (plasticizer/super plasticizer) in recommended proportions as per IS :9103 to accelerate ,retard setting of concrete , improve workability without preparing strength and durability with about ( 5 cu.m) 7730 kg of 20mm machine crushed stone jelly and with about (3.30cu.m) 5156 kg of 10-12mm machine crushed stone jelly and with about (4.79cu.m) 7670kg of sand, but excluding cost of reinforcement grill and fabricating charges , centering and shuttering and also including laying , vibrating with mechanical vibrators ,finishing curing etc., and providing fixtures like fan clamps in the RCC floor/roof slabs wherever necessary without claiming etc., complete
Supply and fabrication and placing in position of TMT steel roads to required size and length as directed by the departmental officers including cost of binding wire, cutting, bending and tying with proper position etc., including cost and conveyance of all materials to site and all labour charges etc., complete Complying with Standard Specification
Plastering with cement mortar 1:3 mix, 20mm thick including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc. complete . complying with std. specifications
Conveyance of Excavated Excess Earth away from the site to 2km including loading and transportation charges etc., complete as per standard Specification.
Swathi Construction (BID ID -1397053)
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .