Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹179.1 CrAdmitted-Finance | ₹179.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹208.3 CrAdmitted-Finance PLOT NO 178 A MLA COLONY ROAD NO 12 BANJARAHILLS HYDERABAD HYDERABAD TELANGANA 500034 | HYDERABAD | TELANGANA | 500034 | ₹208.3 Cr | L2 | Admitted-Finance |
| 3 | L3₹228.6 CrAdmitted-Finance | ₹228.6 Cr | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/s Sunil Kumar Agrawal LLP L3 | SRICO PROJECTS PVT LTD L2 | VISHNUO INFRA PRIVATE LIMITED L1 |
|---|---|---|---|---|---|---|
| 1.00 | CONSTRUCTION OF METRO ENTRY/ EXIT STRUCTURES INTEGRATED WITH COMMERCIAL SPACES AND CONNECTING THROUGH LINK BRIDGE AT THORAIPAKKAM AND SHOLINGANALLUR METRO STATION, CHENNAI, TAMIL NADU (CIVIL & STRUCTURAL WORKS) | 1 | Total Value | 1,65,70,42,258.27 ₹165.7 Cr | 1,45,44,19,474.35 ₹145.4 Cr | 1,16,25,05,294.14 ₹116.3 Cr |
| 2.00THORAIPAKKAM ( FIXED ITEMS) | ||||||
| 2.10 | Works to be executed under Specific Provisional Sum: This will be operated for the following items: Construction of (a) Architectural work, block work and finishes, (b) Boundary wall integrated with Storm Water Drain (SWD), (c) Internal & external drainage, Plumbing and Sanitary fixtures, fittings and accessories, (d) Signages, (e) Entry Arch, Gate and Security office, Boom barrier and checkpoint, (f) Landscaping and irrigation system, (g) Gratings and drain cover, (h) Façade for building and link bridge, (i) Other Miscellaneous works & For common areas like staircase, Lift lobby & toilet areas at all levels full finishes to internal & external area walls, flooring etc, water supply, sanitary and drainage services and all necessary fitting to be made.
Payment shall be made as per actual work executed by the Contractor and rate shall be as per DSR/ DAR Civil 2023 excluding GST and after deducting 7.00% from DSR Rates towards B AND R's usual over heads, will be adopted for these works (No Chennai factor shall be applicable for the works under this category). | 1 | Total Value | 16,25,00,000 ₹16.3 Cr | 16,25,00,000 ₹16.3 Cr | 16,25,00,000 ₹16.3 Cr |
| 2.20 | Works to be executed under Specific Provisional Sum: Internal/ External E&M & VAC
Payment shall be made as per actual work executed by Contractor and rate shall be as per DSR/ DAR E&M 2022 & DSR/ DAR E&M 2025 excluding GST and after deducting 7.00% from DSR Rates towards B AND R's usual over heads, will be adopted for these works (No Chennai factor shall be applicable for the works under this category). | 1 | Total Value | 14,94,00,000 ₹14.9 Cr | 14,94,00,000 ₹14.9 Cr | 14,94,00,000 ₹14.9 Cr |
| 2.30 | Provisional Sum for Temporary diversion, maintenance and restoration of utilities, supporting work for protection and retention of utilities and other miscellaneous work.
The contractor shall carry out the works relating to the utilities in consultation with the utility agencies and the utility works shall be carried out through the approved contractors of the respective utility agencies (CMWSSB, TNEB, BSNL etc.). The Contractor shall be paid as per the actual executed quantities, based on the approved estimate of the respective department or as per the current Schedule of Rates (SOR) of the concerned utility department or market rates (In case the rates are not available in SOR). Additional 10% on the certified payment (excluding GST) shall be paid by Client and this 10% amount will be retained by B AND R towards the coordination overhead charges and profit. This 10% additional payment is not applicable for any connection charges to be paid to the utility agencies for the diverted utilities. | 1 | Total Value | 25,00,000 ₹25 L | 25,00,000 ₹25 L | 25,00,000 ₹25 L |
| 3.00SHOLINGANALLUR ( FIXED ITEMS) | ||||||
| 3.10 | Works to be executed under Specific Provisional Sum: This will be operated for the following items: Construction of (a) Architectural work, block work and finishes, (b) Boundary wall integrated with Storm Water Drain (SWD), (c) Internal & external drainage, Plumbing and Sanitary fixtures, fittings and accessories, (d) Signages, (e) Entry Arch, Gate and Security office, Boom barrier and checkpoint, (f) Landscaping and irrigation system, (g) Gratings and drain cover, (h) Façade for building and link bridge, (i) Other Miscellaneous works & For common areas like staircase, Lift lobby & toilet areas at all levels full finishes to internal & external area walls, flooring etc, water supply, sanitary and drainage services and all necessary fitting to be made.
Payment shall be made as per actual work executed by the Contractor and rate shall be as per DSR/ DAR Civil 2023 excluding GST and after deducting 7.00% from DSR Rates towards B AND R's usual over heads, will be adopted for these works (No Chennai factor shall be applicable for the works under this category). | 1 | Total Value | 16,25,00,000 ₹16.3 Cr | 16,25,00,000 ₹16.3 Cr | 16,25,00,000 ₹16.3 Cr |
| 3.20 | Works to be executed under Specific Provisional Sum: Internal/ External E&M & VAC
Payment shall be made as per actual work executed by Contractor and rate shall be as per DSR/ DAR E&M 2022 & DSR/ DAR E&M 2025 excluding GST and after deducting 7.00% from DSR Rates towards B AND R's usual over heads, will be adopted for these works (No Chennai factor shall be applicable for the works under this category). | 1 | Total Value | 14,94,00,000 ₹14.9 Cr | 14,94,00,000 ₹14.9 Cr | 14,94,00,000 ₹14.9 Cr |
| 3.30 | Provisional Sum for Temporary diversion, maintenance and restoration of utilities, supporting work for protection and retention of utilities and other miscellaneous work.
The contractor shall carry out the works relating to the utilities in consultation with the utility agencies and the utility works shall be carried out through the approved contractors of the respective utility agencies (CMWSSB, TNEB, BSNL etc.). The Contractor shall be paid as per the actual executed quantities, based on the approved estimate of the respective department or as per the current Schedule of Rates (SOR) of the concerned utility department or market rates (In case the rates are not available in SOR). Additional 10% on the certified payment (excluding GST) shall be paid by Client and this 10% amount will be retained by B AND R towards the coordination overhead charges and profit. This 10% additional payment is not applicable for any connection charges to be paid to the utility agencies for the diverted utilities. | 1 | Total Value | 25,00,000 ₹25 L | 25,00,000 ₹25 L | 25,00,000 ₹25 L |
| 4.00IMP NOTE:- 1. MANDATARY TO FILL 2ND SHEET, OR RESULT WILL COME INCOMPLETE 2. BIDDER MUST PUT THEIR COMPANY NAME IN " NAME OF BIDDER " FIELD | ||||||
Updated dates
Tender Value
₹177.4 Cr
EMD Value
₹1.1 Cr
Closing Date
5 Jan 2026, 5:30 pmClosed
General Manager (Commercial)
Bridge and Roof Co. (India) Ltd Kankaria Centre (4TH/5th Floor) 2/1 Russel Street Kolkata 700 071
DESIGN AND CONSTRUCTION OF METRO STATION ENTRY/ EXIT STRUCTURES INTEGRATED WITH COMMERCIAL SPACES AND CONNECTING THROUGH LINK BRIDGE AT SHOLINGANALLUR AND THORAIPAKKAM STATION
2025_BandR_886664_1
B AND R / HO / CMRL / 51293 / ENTRY EXIT / SHOLINGANALLUR / NIT / 01
Open Tender
Construction Works
450 days
SHOLINGANALLUR AND THORAIPAKKAM METRO CHENNAI
PLEASE REFER TO TENDER DOCUMENT FOR DETAILS
10 documents required · 10 mandatory
₹1.2 L
Bridge and Roof Co.India Ltd
₹1.1 Cr
22 Jan 2026
21 Nov 2025
6 Jan 2026
21 Nov 2025
5 Jan 2026
1 Dec 2025
21 Nov 2025 - 28 Nov 2025
CONSTRUCTION OF METRO ENTRY/ EXIT STRUCTURES INTEGRATED WITH COMMERCIAL SPACES AND CONNECTING THROUGH LINK BRIDGE AT THORAIPAKKAM AND SHOLINGANALLUR METRO STATION, CHENNAI, TAMIL NADU (CIVIL & STRUCTURAL WORKS)
THORAIPAKKAM ( FIXED ITEMS)
Works to be executed under Specific Provisional Sum: This will be operated for the following items: Construction of (a) Architectural work, block work and finishes, (b) Boundary wall integrated with Storm Water Drain (SWD), (c) Internal & external drainage, Plumbing and Sanitary fixtures, fittings and accessories, (d) Signages, (e) Entry Arch, Gate and Security office, Boom barrier and checkpoint, (f) Landscaping and irrigation system, (g) Gratings and drain cover, (h) Façade for building and link bridge, (i) Other Miscellaneous works & For common areas like staircase, Lift lobby & toilet areas at all levels full finishes to internal & external area walls, flooring etc, water supply, sanitary and drainage services and all necessary fitting to be made. Payment shall be made as per actual work executed by the Contractor and rate shall be as per DSR/ DAR Civil 2023 excluding GST and after deducting 7.00% from DSR Rates towards B AND R's usual over heads, will be adopted for these works (No Chennai factor shall be applicable for the works under this category).
Works to be executed under Specific Provisional Sum: Internal/ External E&M & VAC Payment shall be made as per actual work executed by Contractor and rate shall be as per DSR/ DAR E&M 2022 & DSR/ DAR E&M 2025 excluding GST and after deducting 7.00% from DSR Rates towards B AND R's usual over heads, will be adopted for these works (No Chennai factor shall be applicable for the works under this category).
Provisional Sum for Temporary diversion, maintenance and restoration of utilities, supporting work for protection and retention of utilities and other miscellaneous work. The contractor shall carry out the works relating to the utilities in consultation with the utility agencies and the utility works shall be carried out through the approved contractors of the respective utility agencies (CMWSSB, TNEB, BSNL etc.). The Contractor shall be paid as per the actual executed quantities, based on the approved estimate of the respective department or as per the current Schedule of Rates (SOR) of the concerned utility department or market rates (In case the rates are not available in SOR). Additional 10% on the certified payment (excluding GST) shall be paid by Client and this 10% amount will be retained by B AND R towards the coordination overhead charges and profit. This 10% additional payment is not applicable for any connection charges to be paid to the utility agencies for the diverted utilities.
SHOLINGANALLUR ( FIXED ITEMS)
Works to be executed under Specific Provisional Sum: This will be operated for the following items: Construction of (a) Architectural work, block work and finishes, (b) Boundary wall integrated with Storm Water Drain (SWD), (c) Internal & external drainage, Plumbing and Sanitary fixtures, fittings and accessories, (d) Signages, (e) Entry Arch, Gate and Security office, Boom barrier and checkpoint, (f) Landscaping and irrigation system, (g) Gratings and drain cover, (h) Façade for building and link bridge, (i) Other Miscellaneous works & For common areas like staircase, Lift lobby & toilet areas at all levels full finishes to internal & external area walls, flooring etc, water supply, sanitary and drainage services and all necessary fitting to be made. Payment shall be made as per actual work executed by the Contractor and rate shall be as per DSR/ DAR Civil 2023 excluding GST and after deducting 7.00% from DSR Rates towards B AND R's usual over heads, will be adopted for these works (No Chennai factor shall be applicable for the works under this category).
Works to be executed under Specific Provisional Sum: Internal/ External E&M & VAC Payment shall be made as per actual work executed by Contractor and rate shall be as per DSR/ DAR E&M 2022 & DSR/ DAR E&M 2025 excluding GST and after deducting 7.00% from DSR Rates towards B AND R's usual over heads, will be adopted for these works (No Chennai factor shall be applicable for the works under this category).
Provisional Sum for Temporary diversion, maintenance and restoration of utilities, supporting work for protection and retention of utilities and other miscellaneous work. The contractor shall carry out the works relating to the utilities in consultation with the utility agencies and the utility works shall be carried out through the approved contractors of the respective utility agencies (CMWSSB, TNEB, BSNL etc.). The Contractor shall be paid as per the actual executed quantities, based on the approved estimate of the respective department or as per the current Schedule of Rates (SOR) of the concerned utility department or market rates (In case the rates are not available in SOR). Additional 10% on the certified payment (excluding GST) shall be paid by Client and this 10% amount will be retained by B AND R towards the coordination overhead charges and profit. This 10% additional payment is not applicable for any connection charges to be paid to the utility agencies for the diverted utilities.
IMP NOTE:- 1. MANDATARY TO FILL 2ND SHEET, OR RESULT WILL COME INCOMPLETE 2. BIDDER MUST PUT THEIR COMPANY NAME IN " NAME OF BIDDER " FIELD
"NOTE:- THE ABOVE RATE SHALL BE INCLUSIVE OF ALL TAXES & DUTIES, ROYALTIES, CESS, ENVIORMENTAL & POLLUTION, FITNESS & SAFETY CLEARANCE CHARGES (IF ANY), OR ANY OTHER INCIDENTAL CHARGES ETC BUT EXCLUDING GST."
Please Enable Macros to View BoQ information
Percentage BoQ
BoQ_Ver3.0
Notice Inviting e-Tender (eNIT) No : B AND R / HO / CMRL / 51293 / ENTRY EXIT / SHOLINGANALLUR / NIT / 01, Dated 19.11.2025
Name of the Bidder/ Bidding Firm / Company :
PRICE SCHEDULE (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only )
NUMBER #
CIVIL AND STRUCTURAL WORK - THORAIPAKKAM ( Pkg A )
Earth work in excavation in all kind of soil, soft disintegrated rock, etc by mechanical means (Hydraulic excavator)/ manual means in foundation, trenches, rafts, plinths, Retaining Wall, UG Sumps, area leveling etc to required depth from existing ground level including dressing of sides and ramming of bottoms, barricading, bailing/ pumping of water from any source including getting out the excavated earth and disposal of same for lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge.
Depth from 0 m to 1.50 m
Depth from 1.50 m to 3.00 m
Depth from 3.00 m to 4.50 m
Depth from 4.50 m to 6.00 m
Depth from 6.00 m to 7.50 m
Depth from 7.50 m to 9.00 m
Depth from 9.00 m to 10.50 m
Depth from 10.50 m to 12.00 m
Beyond 20 Km per additional Km
Excavating Trail trench for Utilities Investigation by manual means of required width for identifying existing pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, for all depth, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m : All kinds of soil & soft disintegrated rock - for Trail trench for Utilities Investigation
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
Felling trees of the girth (measured at a height of 1 m above ground level), including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.
Beyond 30 cm girth upto and including 60 cm girth
Beyond 60 cm girth upto and including 120 cm girth
Beyond 120 cm girth upto and including 240 cm girth
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared.
Treatment of soil under existing floors using chemical emulsion @ one litre per hole, 300 mm apart including drilling 12 mm diameter holes and plugging with cement mortar 1 :2 (1 cement : 2 Coarse sand) to match the existing floor: With Chlorpyriphos/ Lindane E.C. 20% with 1% concentration
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : M15 Grade
Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana/ Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, reinforcement and finishing as per direction of the engineer-in-charge; for the following grades of concrete. All works below ground level upto and inclusive of plinth level for Footings, Basement Rafts, Basement Slabs, Basement Beams, Plinth Beams, Wall, Pedestals, Stair, RCC encasement of structural members, Skin Wall to Diaphram Wall etc - M30 Concrete
Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana/ Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, reinforcement and finishing as per direction of the engineer-in-charge; for the following grades of concrete. All works above plinth level upto floor V level for Slabs, Beams, Columns, RCC encasement of structural members, Walls, Parapet, lintels, canopies - M30 Concrete
Extra for concrete work in superstructure above floor V level for each four floors or part thereof
Add for using extra cement in the items of design mix over and above the specified grade of Concrete. Cost of Cement required for M30 grade Concrete as per relevant item is included. This item will be operated for higher grades of Concrete i.e. more than M30 Grade
Supplying and mixing of approved brand of BI-POLAR CONCRETE PENETRATING CORROSION INHIBITING ADMIXTURE in concrete as per manufacturer's specification for protection of reinforcement against corrosion. Supply of admixture in Contractor's scope.
Providing and mixing integral crystalline admixture for water proofing treatment to RCC structures like basement raft, retaining walls, reservior, sewage & water treatment plant, tunnels / subway and bridge deck etc. at the time of transporting of concrete into the drum of the ready-mix truck, using integral crystalline admixture @ 0.80% (minimum) to the weight of cement content per cubic meter of concrete) or higher as recommended by the manufacturer's specification in reinforced cement concrete at site of work. The material shall meet the requirements as specified in ACI-212-3R-2010 i.e. by reducing permeability of concrete by more than 90%, compared with control concrete as per DIN 1048 and resistant to 16 bar hydrostatic pressure. The crystalline admixture shall be capable of self-healing of cracks up to a width of 0.50 mm. The work shall be carried out all complete as per specification and the direction of the Engineer-in-charge. The product performance shall carry guarantee for 10 years against any leakage.
Providing & Fixing Steel reinforcement for R.C.C. work including transporting to site, storing, straightening, cutting, bending, tying, lapping of bars/ butt welding/ placing in position and binding, correct shape and size as per detailed drawings, specifications, preparing and getting approved bar-bending schedules for all reinforced concrete work including Diaphram Wall work with correct size of heavy duty PVC/ concrete (of same grade) cover blocks and galvanized binding wire of 18 gauge, required dewatering, provide required labour and machines/ equipment/ tools/ tackles for handling, shifting, bending, binding, etc. all complete in all respect at all depths, heights, lifts & leads. Only Thermo-mechanically treated reinforcement bars of grade Fe415/ Fe550 with minimum total elongation of 14.5% conforming to IS:1786 shall be adopted. (Note: Nothing extra is payable for laps, chairs, spacers, binding wire, mechanical couplers, wastage, etc.)
Providing and laying at or near ground level factory made kerb stone of M-25 grade cement concrete in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement: 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5mm), including making drainage opening wherever required complete etc. as per direction of Engineer-in-charge (length of finished kerb edging shall be measured for payment). (Precast C.C. kerb stone shall be approved by Engineer-in-charge). (450 x 60 mm Concrete Kerb or any other approved size)
Centering and shuttering including strutting, propping etc. and removal of form work for all heights and depths including submission of design calculations and shop drawings for approval, sealing the joints with heavy duty self adhesive tape, PVC spacer, applying shuttering, complete in all respect as per specification for:
Foundations, footings, bases for columns, Pedestals, non suspended slabs and beams etc.
Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps, Lift Wall, Stairs, Skin Wall to Diaphram Wall, etc. Basement Wall, Basement Raft, Suspended Slabs in Basement, Ramp for Basement
Columns, piers, abutments, pillars, posts and struts, suspended floors and beams, Lintels, Roofs, landings, balconies, girders, cantilevers, access platform, Staircase waist slab, Ramp, etc
Extra for using steel conforming to Grade Designation E350 instead of Grade Designation E250 as per IS: 2062
Supplying and fixing HSFG bolts of any dia and any length with suitable nuts including DTI washers conforming to IRS-B1-2001 for bridges and steel structures with contractors labour, tools and plants and lead and lift etc., complete.
Providing and fixing of hot dipped galvanized Internally Threaded Sleeve Bolt of different size. Sleeve Bolt will be manufactured from IS:2062 Grade B mild steel. The sleeve shall receive hexagon-head bolt M20 Class 8.8 as per IS:1364 (Part 1) with galvanized spring washer. The base connections and connection with concrete shall be effected by internally threaded bolt sleeves (hot dipped galvanized @ 300 gm/sqm) manufactured from IS:2062 Grade B mild steel. The sleeve shall receive hexagon-head bolt M20 Class 8.8 as per IS:1364 (Part 1) with galvanized spring washer.
Supply and application of Cementitious Vermiculite fireproofing for 2 hour fire rating as per per UL 263 as per Employer's Requirement and approved manufacturer's technical specifications, application procedures, etc. including cost of all materials, labour, consumables, tools, tackles, etc all complete as per direction of Engineer-in-Charge.
Providing and fixing roofing consist of 0.8 mm thick galvanized steel deck sheet confirming to IS 277:1992 used as permanent shuttering over which MS wire mesh 3mm laid at 100x100 mm grid including edge trim covered with concrete. This metal deck will be supported on structural steel beam with shear studs. (Structural steel like Beam, column, joists etc. & concrete of different grade as per design will be paid separately).
Providing and fixing roofing consist of 1.20 mm thick galvanized steel deck sheet confirming to IS 277:1992 used as permanent shuttering over which MS wire mesh 3mm laid at 100x100 mm grid including edge trim covered with concrete. This metal deck will be supported on structural steel beam with shear studs. (Structural steel like Beam, column, joists etc. & concrete of different grade as per design will be paid separately).
Providing & fixing UV stabilised fiberglass reinforced plastic sheet roofing up to any pitch, including fixing with polymer coated 'J' or 'L' hooks, bolts & nuts 8mm dia. G.I plain/ bitumen washers complete but excluding the cost of purlins, rafters, trusses etc. The sheets shall be manufactured out of 2400 TEX panel rovigs incorporating minimum 0.3% ultra-violet stabiliser in resin system under approximately 2400 psi and hot cured. They shall be of uniform pigmentation and thickness without air pockets and shall conform to IS 10192 and IS 12866.The sheets shall be opaque or translucent, clear or pigmented, textured or smooth as specified. 2 mm thick corrugated (2.5" or 4.2" or 6") or step-down (2" or 3" or 6" ) as specified
Providing and laying roof insulation with 40 mm thick impervious sprayed, closed cell free Rigid Polyurethane foam over deck insulation conforming to IS - 12432 Pt. III (density of foam being 40-45 kg/ cum), over a coat of polyurethane primer applied @ 6-8 sqm per litre, laying 400 G polythene sheet over PUF spray and providing a wearing course of 40 mm thick cement screed 1:2:4 (1 cement : 2 coarse sand : 4 stone aggregate 20 mm nominal size) in chequered rough finish, in panels of 2.5 m x 2.5 m and embedding with 24 G wire netting and sealing the joints with polymerized mastic, all complete as per direction of Engineer-in-Charge.
Providing and fixing Heat Resistant Terrace Tiles (300 mm x 300 mm x 20 mm) with SRI (solar refractive index) > 78, solar reflection > 0.70 and initial emittance > 0.75 on waterproof and sloped surface of terrace, laid on 20 mm thick cement sand mortar in the ratio of 1:4 (1 cement : 4 coarse sand) and grouting the joints with mix of white cement & marble powder in ratio of 1:1, including rubbing and polishing of the surface upto 3 cuts complete, including providing skirting upto 150 mm height along the parapet walls in the same manner.
Design, Supply and installation of hot rolled steel sheet piles including all associated structural steel members i.e. waler & runner beams, strut, cross ties, vertical members, guide frames, suitable interlocks, suitable corner sections, splicing & cutting sheet piling, application of recommended sealant for complete water tightness (as required), pre-drilling for installation into bedrock (as necessary) etc. as per site conditions, mobilization/ demobilization of all necessary tools & tackles, hammer (vibratory/ impact), crane(s) etc., all labor, shifting plant/ machinery & carryout any ancillary works and subsequent removal after completion of works, all complete as per Scope of Work/ Specifications, relevant Codes/ Standards, approved design/ drawings/ method statement and directions of Engineer-in-charge. (No extra payment shall be made for cost of extraction and replacement for installing of sheet pile deviating the specification or rejected by Engineer-in-charge. Extracted sheet piles shall be contractor's property and contractor shall remove the same from site without any extra cost to client). Payment shall be on the basis of sheet pile shoring area exposed after complete excavation. Depth of shoring will be measured from existing ground level to bottom of PCC.
Supplying and filling in plinth with borrow earth under floors, including watering, ramming, consolidating and dressing complete. Filling with Approved Borrowed Earth (SUB GRADE) for all heights and depths for road embankments, shoulders or any other place as directed to proper levels, slopes, grades and stripping at borrow areas (if necessary) loading, unloading, transportation etc., clearing and stripping as per specifications, uprooting of vegetation, roots and disposal of the shrubs, bushes, roots etc., breaking clods, spreading in layers not exceeding 20 cm loose thickness, watering, ramming and compacting with road roller to give at least 95% of max. laboratory dry density as per IS : 2720 Part VIII, providing and operating POL and operator charges of necessary road rollers and other equipment, providing testing apparatus and testing the degree of consolidation, dressing and levelling, etc. complete including disposal of all unserviceable materials if any beyond the boundary limit for all leads etc. as per drawings, specifications and directions of Engineer-in- Charge. The rate quoted shall include all royalties, right-of-way etc. complete. (Approved earth shall meet Client requirement) (Borrow area outside site limit shall be arranged by contractor only)
Boring/ drilling bore well of required dia for casing/ strainer pipe by suitable method prescribed in IS: 2800 (Part I) including collection of samples from different strata, preparing and submitting strata chart/ bore log, hire & running charges of all equipments, tools, plants & machineris required for the job, all complete as per direction of Engineer-in-Charge up to 90 m depth below ground level. in all type of soil - 300 mm dia bore well. This Permanent Bore Well is for Client use only.
Supplying, assembling, lowering and fixing in vertical position in bore well, unplasticized PVC medium well casing (CM) pipe of required dia, conforming to IS: 12818 including required hire and labour charges, fittings & accessories etc all complete for all depths as per direction of Engineer-in-Charge.
Providing and applying swellable type water stop tape, 19mm x 25mm thick in linear meter (expansive nature) for construction joints treatment of RCC structure such as raft slab, retaining walls, water storage tank and at the junctions of raft slab with the retaining walls etc. After cleaning the surface, one coat of required primer for swellable water stop tape shall be applied throughout the length of the joint @ 3.78 litre per 240 running meter. Over the primed surface swellable type water stop tape shall be placed. The work shall be carried out all complete as per specification and the direction of the Engineer-In-Charge. The product performance shall carry guarantee for 10 years against any leakage.
Providing and placing on terrace (at all floor levels) polyethylene water storage tank, IS : 12701 marked, with cover and suitable locking arrangement and making necessary holes for inlet, outlet and overflow pipes but without fittings and the base support for tank.
Providing and applying fully bonded, pre-applied, HDPE, composite waterproofing sheet membrane system with thickness of 1.2 mm with sand finish at top, HDPE film thickness > 0.8 mm and HDPE membrane composite ≥ 1.20 mm The membrane should have strong bonding property between the top sanded layer and fresh concrete, so that there is no lateral water migration between membrane and the structural concrete of underground structure. The overlaps min. 80 mm on side laps which.End laps the sand is removed by hot shoveling to a width of 80 mm and there upon the clean band is overlapped using double sided tape. The membrane shall have Resistance to static puncture ≥ 1000 N (ASTM E154) Tensile strength ≥ 25 MPa (film) (ASTM D412 mod) Elongation ≥ 550 % (ASTM D412 mod), Adhesion in peel ≥ 900 N/m (ASTM D903 mod), Joint peel resistance ≥ 1500 N/m (ASTM D1876), Foldability at low temperature Unaffected at -23 °C (ASTM D1970) Water absorption < 0.5 % (ASTM D570), Water tightness > 71 m of hydrostatic head (ASTM D5385 mod), Permeability to water vapour < 0.10 ng/Pa·s·m2 (ASTM E96, method B) The rates shall include cost and conveyance of all materials, labour charges, lead, lift etc. complete including finishing the edges as directed by the Engineer-in-charge at all levels. (The above work shall be carriedout by an agency having sufficient experience in membrane water proofing and should ensure a guarantee of 5 years). Only skilled and experienced persons shall be employed for this purpose.)
Construction of granular sub-base by providing close graded Material conforming to specifications, mixing in a mechanical mix plant at OMC, carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge. With material conforming to Grade-I (size range 75 mm to 0.075 mm) having CBR Value-30
Providing and laying factory made chamfered edge Cement Concrete paver blocks in footpath, parks, lawns, drive ways or light traffic parking etc, of required strength, thickness & size/ shape, made by table vibratory method using PU mould, laid in required colour & pattern over 50mm thick compacted bed of sand, compacting and proper embedding/ laying of inter locking paver blocks into the sand bedding layer through vibratory compaction by using plate vibrator, filling the joints with sand and cutting of paver blocks as per required size and pattern, finishing and sweeping extra sand. complete all as per direction of Engineer-in-Charge. 60mm thick cement concrete paver block of M-35 grade with approved colour, design & pattern.
Providing and fixing in position Stainless Steel Grade 304 Plate 1.00 mm thick as per design for expansion joints - 200 mm wide
Providing and fixing in position Stainless Steel Grade 304 Plate 1.00 mm thick as per design for expansion joints - 300 mm wide
Supplying and filling in plinth with sand under floors, including royalty, watering, ramming, consolidating and dressing complete. Supplying and filling clean, sand of approved quality conforming to Zone II & III as per IS 383 under floors, pavements, in foundation and tank ring wall, plinth, trenches etc. including cost of sand transportation for all leads, loading & unloading, spreading in layers of 150 mm loose thickness at all depths, watering, ramming, compacting to 90% dry density or as specified in drawing, dressing in slopes horizontally as required and leveling etc. all complete and as per directions of Engineer-in-Charge. (Rate for compacted thickness shall be considered.)
Boring, providing and installation of bored cast-in-situ reinforced cement concrete piles of garde M-35 using minimum of 400 Kg Cement per Cum of Concrete including providing and mixing required admixtures in recommended proportions as per IS 9103 as approved by the Engineer-in-Charge for achieving 150-200 mm slump, of specified diameter and length below pile cap, to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring with bentonite solution and temporary casing of appropriate length for setting out and removal of same and the length of the pile to be embedded in the pile cap etc. by Crawler mounted, telescopic boom hydraulic pilling Rig and including Rock Socketing, Pile head chipping and disposal of same outside the site as specified in Employer's Requirements all complete in all respect as per approved drawing, specification and direction of Engineer-in-Charge, including removal of excavated earth with all its lifts and leads (length of pile for payment shall be measured up to bottom of pile cap). Note: Truck Mounted rotary/ TMR/ Tube well boring machine shall not be used.
600 mm dia piles
800 mm dia piles
1000 mm dia piles
Barrette Piles of 800 mm x 2500 mm
Barrette Piles of 1000 mm x 2500 mm
Vertical load testing of piles in accordance with IS 2911 (Part IV) including installation of loading platform by Kentledge/ Anchor piles method and preparation of pile head or construction of test cap and dismantling of test cap after test etc. complete as per specification & the direction of Engineer in-charge. Note: Initial and Routine Load test shall not be carried out by Dynamic method of testing. Testing agency shall submit the design of loading platform for the approval of Engineer-in-Charge
Single pile upto 150 tonne Safe capacity Initial test (Test Load 2.5 times the Safe capacity)
Single pile beyond 150 tonne & upto 200 tonne Safe capacity Initial test (Test Load 2.5 times the Safe capacity)
Single pile beyond 200 tonne & upto 300 tonne Safe capacity Initial test (Test Load 2.5 times the Safe capacity)
Single pile upto 150 tonne Safe capacity Routine test (Test Load 1.5 times the Safe capacity)
Single pile beyond 150 tonne & upto 200 tonne Safe capacity Routine test (Test Load 1.5 times the Safe capacity)
Single pile beyond 200 tonne & upto 300 tonne Safe capacity Routine test (Test Load 1.5 times the Safe capacity)
Providing & Fixing Steel reinforcement for Piling work including transporting to site, storing, straightening, cutting, bending, tying, lapping of bars/ butt welding/ placing in position and binding, correct shape and size as per detailed drawings, specifications, preparing and getting approved bar-bending schedules for Piling work with correct size of heavy duty PVC/ concrete (of same grade) cover blocks and galvanized binding wire of 18 gauge, required dewatering, provide required labour and machines/ equipment/ tools/ tackles for handling, shifting, bending, binding, etc. all complete in all respect at all depths, heights, lifts & leads. Only Thermo-mechanically treated reinforcement bars of grade Fe415/Fe550 with minimum total elongation of 14.5% conforming to IS:1786 shall be adopted.. Note: Nothing extra is payable for laps, chairs, spacers, binding wire, mechanical couplers, wastage, etc.)
Conducting Low Strain Integrity Test on piles as per ASTM D 5882, including pile head preparation, mobilisation & demobilisation of testing apparatus/ equipments, skilled personnel, data collection/ recording, analyzing the results, preparing comprehensive report and submitting the same in 5 copies, all complete as per specifications and instructions of Engineer-in-Charge. Based on the review of LSI test results the number of tests may be increased as per the directions of Engineer-in-charge.
Providing and applying integral crystalline slurry of hydrophilic in nature for waterproofing treatment to the RCC structures like retaining walls of the basement, water tanks, roof slabs, podiums, reservior, sewage & water treatment plant, tunnels / subway and bridge deck etc., prepared by mixing in the ratio of 5 : 2 (5 parts integral crystalline slurry : 2 parts water) for vertical surfaces and 3 : 1 (3 parts integral crystalline slurry : 1 part water) for horizontal surfaces and applying the same from negative (internal) side with the help of synthetic fiber brush. The material shall meet the requirements as specified in ACI-212-3R-2010 i.e by reducing permeability of concrete by more than 90% compared with control concrete as per DIN 1048 and resistant to 16 bar hydrostatic pressure on negative side. The crystalline slurry shall be capable of self-healing of cracks up to a width of 0.50 mm. The work shall be carried out all complete as per specification and the direction of the engineer-incharge. The product performance shall carry guarantee for 10 years against any leakage.
For vertical surface two coats @ 0.70 kg per sqm
For horizontal surface one coat @1.10 kg per sqm.
Providing and applying crystalline mortar by mixing in the ratio of 4.5 : 1 (4.5 parts crystalline mortar : 1 part water) for the treatment of faulty construction joints, cracks, tie rod holes and spalled & honeycombed surface of RCC underground structures like basement, water tanks, bridge deck etc. to ensure water tightness. The crystallie mortar shall conform to the EN 1504-3 having compressive strength Class R4 > 45 MPa and adhesive bond strength Class R3 > 1.5 MPa. The work shall be carried out all complete as per specification and the direction of the Engineer-In-Charge. The product performance shall carry guarantee for 10 years against any leakage.
For sealing cracks and faulty construction joints, routed out/ making U-shape groove size 25x25mm and then primed the area with integral crystalline slurry @ 0.05kg/ running metre and while the surface is tacky filled the groove upto surface with crystalline mortar @1.50kg/ running metre. Once crystalline mortar is touch dry then finally applied two coats of integral crystalline slurry @ 0.05kg/running metre per coat.
For patching of tie rod holes, prepared tie rod hole surface and then primed the area with integral crystalline slurry @ 0.070 kg/sqm and while the surface is tacky repair and then filled the tie rod holes with crystalline mortar @ 0.040kg per hole. The crystalline mortar should be tightly rodded into tie rod holes or packed tightly (For 25x25x25 mm tie rod hole, use 0.040kg to fill the hole)
Conducting Standard penetration Test in pile bore as per the instruction of Engineer-in-charge.
Providing and laying Cement Concrete Pavement of Mix M30 with ready mixed concrete from batching plant. The ready mixed concrete shall be laid and finished with screed board vibrator, vaccum dewatering process and finally finished by floating, brooming withwire brush etc. complete as per specifications and directions of Engineer-in-charge. (The panel shuttering work shall be paid for seperately)
Constructing cast-in situ RCC diaphragm wall by providing and laying machine batched, machine mixed, self compacting, ready mix reinforced cement concrete, tramie controlled, of M 50 grade using 460 kg. cement per cum of concrete including providing and mixing required admixtures in recommended proportions as per IS : 9103, as approved by the Engineer-in-charge, for achieving 150- 200 mm slump, for diaphragm wall having thickness as per approved structural design not exceeding 800 mm, in pannels of required depth and lengths as per approved drawing, including constructing necessary guide walls as required and as specified including boring in all kinds of soils and rocks, including working in or under water and / or liquid mud, in foul conditions and pumping or bailing out of water and removing slush, including disposal of earth/ rock / slush etc. for all leads and all lifts, including preparing, providing and re-circulating bentonite slurry in the trench as and when required for all depths, including agitating bentonite slurry during trenching etc., providing and fixing stop ends or form tubes, upto the required depth of diaphragm wall including extracting the same after casting, including chipping off the bentonite adulterated concrete or unsound concrete up to the cut off level for obtaining the sound concrete, dressing undulations on the exposed face of diaphragm wall after excavation by chipping / chiseling etc. including filling the depression/ cavities with sound concrete etc. complete and as directed by the Engineer-in-charge, including providing recess for bearing plates and fixing insert boxes for inclined rock anchors etc. complete as per the specifications and approved design and as directed by the Engineer-in-charge, but excluding the cost of reinforcement and inserts. (Rates include cost of all inputs of labour, material, Tools & Plant, cost of handling, lifting & placing in position the reinforced cage in the trench, including the additional cost of welding the reinforcement bars etc. involved in the work and all other incidental expenditure for completing the work as directed by the Engineer-in-charge. However, the actual area of the diaphragm wall, correct to two places of decimal, from design bottom level to the design cut off level (including portion anchored in the rock up to the design bottom level) only shall be measured for payment. Excess/ less cement used for design mix is payable/ recoverable separately.
Monthly hire charges of Deep Bore Well: Cost includes required Pumps (minimum 5 HP capacity), maintenance of submersible Pumps with cables, HDPE Hose Pipes, Control Panels, Plumbing & Operation Charges, Operator/ Electrician/ Plumber/ Supervisors for 24/7 operation etc complete in all respect including discharge pipe lines as per the dewatering scheme including the specials etc. complete. Non operation hours/ days will not be considered for payment. Dewatering within various structures and buildings by submission of dewatering scheme, deploying required dewatering pumps, pipelines including standby equipment, additional equipment to cater the urgent needs, providing and erection of pipe sleeves and support embedded parts, wherever necessary, installation of pumps and pipelines, setting it to work, commissioning, maintaining the equipment and pipelines, maintaining day-to-day records in log books, dismantling and taking back the pumps and pipelines on completion of dewatering requirement etc., complete.
Lowering of water table by well point dewatering system as per direction of Engineer-in-Charge. including supply of dewatering pumps/ well point network/ Design / Detailing and execution of same to ensure water free surface at raft level to prevent uplift failure. Supply of all tools, tackles, machineries, manpower, maintaining till completion of works, complete in all respect. Operational cost of the dewatering pumps based on energy consumption. Note: The payment shall be made based on energy meter reading of the pump.
CIVIL AND STRUCTURAL WORK - SHOLINGANALLUR ( Pkg B)
Earth work in excavation in all kind of soil, soft disintegrated rock, etc by mechanical means (Hydraulic excavator)/ manual means in foundation, trenches, rafts, plinths, Retaining Wall, UG Sumps, area leveling etc to required depth from existing ground level including dressing of sides and ramming of bottoms, barricading, bailing/ pumping of water from any source including getting out the excavated earth and disposal of same for lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge.
Depth from 0 m to 1.50 m
Depth from 1.50 m to 3.00 m
Depth from 3.00 m to 4.50 m
Depth from 4.50 m to 6.00 m
Depth from 6.00 m to 7.50 m
Beyond 20 Km per additional Km
Excavating Trail trench for Utilities Investigation by manual means of required width for identifying existing pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, for all depth, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m : All kinds of soil & soft disintegrated rock - for Trail trench for Utilities Investigation
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
Felling trees of the girth (measured at a height of 1 m above ground level), including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.
Beyond 30 cm girth upto and including 60 cm girth
Beyond 60 cm girth upto and including 120 cm girth
Beyond 120 cm girth upto and including 240 cm girth
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared.
Treatment of soil under existing floors using chemical emulsion @ one litre per hole, 300 mm apart including drilling 12 mm diameter holes and plugging with cement mortar 1 :2 (1 cement : 2 Coarse sand) to match the existing floor: With Chlorpyriphos/ Lindane E.C. 20% with 1% concentration
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : M15 Grade
Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana/ Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, reinforcement and finishing as per direction of the engineer-in-charge; for the following grades of concrete. All works upto plinth level for Footings, Rafts, Plinth Beams, Wall, Pedestals, RCC encasement of structural members, non suspended slabs/bemas, etc - M30 Concrete
Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana/ Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, reinforcement and finishing as per direction of the engineer-in-charge; for the following grades of concrete. All works above plinth level for Slabs, Beams, Columns, RCC encasement of structural members, Walls, Parapet, lintels, canopies, non suspended slabs/bemas, etc - M30 Concrete
Extra for concrete work in superstructure above floor V level for each four floors or part thereof
Add for using extra cement in the items of design mix over and above the specified grade of Concrete. Cost of Cement required for M30 grade Concrete as per relevant item is included. This item will be operated for higher grades of Concrete i.e. more than M30 Grade
Supplying and mixing of approved brand of BI-POLAR CONCRETE PENETRATING CORROSION INHIBITING ADMIXTURE in concrete as per manufacturer's specification for protection of reinforcement against corrosion. Supply of admixture in Contractor's scope.
Providing and mixing integral crystalline admixture for water proofing treatment to RCC structures like basement raft, retaining walls, reservior, sewage & water treatment plant, tunnels / subway and bridge deck etc. at the time of transporting of concrete into the drum of the ready-mix truck, using integral crystalline admixture @ 0.80% (minimum) to the weight of cement content per cubic meter of concrete) or higher as recommended by the manufacturer's specification in reinforced cement concrete at site of work. The material shall meet the requirements as specified in ACI-212-3R-2010 i.e. by reducing permeability of concrete by more than 90%, compared with control concrete as per DIN 1048 and resistant to 16 bar hydrostatic pressure. The crystalline admixture shall be capable of self-healing of cracks up to a width of 0.50 mm. The work shall be carried out all complete as per specification and the direction of the Engineer-in-charge. The product performance shall carry guarantee for 10 years against any leakage.
Providing & Fixing Steel reinforcement for R.C.C. work including transporting to site, storing, straightening, cutting, bending, tying, lapping of bars/ butt welding/ placing in position and binding, correct shape and size as per detailed drawings, specifications, preparing and getting approved bar-bending schedules for all reinforced concrete work with correct size of heavy duty PVC/ concrete (of same grade) cover blocks and galvanized binding wire of 18 gauge, required dewatering, provide required labour and machines/ equipment/ tools/ tackles for handling, shifting, bending, binding, etc. all complete in all respect at all depths, heights, lifts & leads. Only Thermo-mechanically treated reinforcement bars of grade Fe415/ Fe550 with minimum total elongation of 14.5% conforming to IS:1786 shall be adopted. (Note: Nothing extra is payable for laps, chairs, spacers, binding wire, mechanical couplers, wastage, etc.)
Providing and laying at or near ground level factory made kerb stone of M-25 grade cement concrete in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement: 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5mm), including making drainage opening wherever required complete etc. as per direction of Engineer-in-charge (length of finished kerb edging shall be measured for payment). (Precast C.C. kerb stone shall be approved by Engineer-in-charge). (450 x 60 mm Concrete Kerb or any other approved size)
Centering and shuttering including strutting, propping etc. and removal of form work for all heights and depths including submission of design calculations and shop drawings for approval, sealing the joints with heavy duty self adhesive tape, PVC spacer, applying shuttering, complete in all respect as per specification for:
Foundations, footings, bases for columns, Pedestals, non suspended slabs and beams etc.
Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps, Lift Wall, Stairs, etc.
Columns, piers, abutments, pillars, posts and struts, suspended floors and beams, Lintels, Roofs, landings, balconies, girders, cantilevers, access platform
Extra for using steel conforming to Grade Designation E350 instead of Grade Designation E250 as per IS: 2062
Supplying and fixing HSFG bolts of any dia and any length with suitable nuts including DTI washers conforming to IRS-B1-2001 for bridges and steel structures with contractors labour, tools and plants and lead and lift etc., complete.
Providing and fixing of hot dipped galvanized Internally Threaded Sleeve Bolt of different size. Sleeve Bolt will be manufactured from IS:2062 Grade B mild steel. The sleeve shall receive hexagon-head bolt M20 Class 8.8 as per IS:1364 (Part 1) with galvanized spring washer. The base connections and connection with concrete shall be effected by internally threaded bolt sleeves (hot dipped galvanized @ 300 gm/sqm) manufactured from IS:2062 Grade B mild steel. The sleeve shall receive hexagon-head bolt M20 Class 8.8 as per IS:1364 (Part 1) with galvanized spring washer.
Supply and application of Cementitious Vermiculite fireproofing for 2 hour fire rating as per per UL 263 as per Employer's Requirement and approved manufacturer's technical specifications, application procedures, etc. including cost of all materials, labour, consumables, tools, tackles, etc all complete as per direction of Engineer-in-Charge.
Providing and fixing roofing consist of 0.8 mm thick galvanized steel deck sheet confirming to IS 277:1992 used as permanent shuttering over which MS wire mesh 3mm laid at 100x100 mm grid including edge trim covered with concrete. This metal deck will be supported on structural steel beam with shear studs. (Structural steel like Beam, column, joists etc. & concrete of different grade as per design will be paid separately).
Providing and fixing roofing consist of 1.20 mm thick galvanized steel deck sheet confirming to IS 277:1992 used as permanent shuttering over which MS wire mesh 3mm laid at 100x100 mm grid including edge trim covered with concrete. This metal deck will be supported on structural steel beam with shear studs. (Structural steel like Beam, column, joists etc. & concrete of different grade as per design will be paid separately).
Providing & fixing UV stabilised fiberglass reinforced plastic sheet roofing up to any pitch, including fixing with polymer coated 'J' or 'L' hooks, bolts & nuts 8mm dia. G.I plain/ bitumen washers complete but excluding the cost of purlins, rafters, trusses etc. The sheets shall be manufactured out of 2400 TEX panel rovigs incorporating minimum 0.3% ultra-violet stabiliser in resin system under approximately 2400 psi and hot cured. They shall be of uniform pigmentation and thickness without air pockets and shall conform to IS 10192 and IS 12866.The sheets shall be opaque or translucent, clear or pigmented, textured or smooth as specified. 2 mm thick corrugated (2.5" or 4.2" or 6") or step-down (2" or 3" or 6" ) as specified
Providing and laying roof insulation with 40 mm thick impervious sprayed, closed cell free Rigid Polyurethane foam over deck insulation conforming to IS - 12432 Pt. III (density of foam being 40-45 kg/ cum), over a coat of polyurethane primer applied @ 6-8 sqm per litre, laying 400 G polythene sheet over PUF spray and providing a wearing course of 40 mm thick cement screed 1:2:4 (1 cement : 2 coarse sand : 4 stone aggregate 20 mm nominal size) in chequered rough finish, in panels of 2.5 m x 2.5 m and embedding with 24 G wire netting and sealing the joints with polymerized mastic, all complete as per direction of Engineer-in-Charge.
Providing and fixing Heat Resistant Terrace Tiles (300 mm x 300 mm x 20 mm) with SRI (solar refractive index) > 78, solar reflection > 0.70 and initial emittance > 0.75 on waterproof and sloped surface of terrace, laid on 20 mm thick cement sand mortar in the ratio of 1:4 (1 cement : 4 coarse sand) and grouting the joints with mix of white cement & marble powder in ratio of 1:1, including rubbing and polishing of the surface upto 3 cuts complete, including providing skirting upto 150 mm height along the parapet walls in the same manner.
Design, Supply and installation of hot rolled steel sheet piles including all associated structural steel members i.e. waler & runner beams, strut, cross ties, vertical members, guide frames, suitable interlocks, suitable corner sections, splicing & cutting sheet piling, application of recommended sealant for complete water tightness (as required), pre-drilling for installation into bedrock (as necessary) etc. as per site conditions, mobilization/ demobilization of all necessary tools & tackles, hammer (vibratory/ impact), crane(s) etc., all labor, shifting plant/ machinery & carryout any ancillary works and subsequent removal after completion of works, all complete as per Scope of Work/ Specifications, relevant Codes/ Standards, approved design/ drawings/ method statement and directions of Engineer-in-charge. (No extra payment shall be made for cost of extraction and replacement for installing of sheet pile deviating the specification or rejected by Engineer-in-charge. Extracted sheet piles shall be contractor's property and contractor shall remove the same from site without any extra cost to client). Payment shall be on the basis of sheet pile shoring area exposed after complete excavation. Depth of shoring will be measured from existing ground level to bottom of PCC.
Supplying and filling in plinth with borrow earth under floors, including watering, ramming, consolidating and dressing complete. Filling with Approved Borrowed Earth (SUB GRADE) for all heights and depths for road embankments, shoulders or any other place as directed to proper levels, slopes, grades and stripping at borrow areas (if necessary) loading, unloading, transportation etc., clearing and stripping as per specifications, uprooting of vegetation, roots and disposal of the shrubs, bushes, roots etc., breaking clods, spreading in layers not exceeding 20 cm loose thickness, watering, ramming and compacting with road roller to give at least 95% of max. laboratory dry density as per IS : 2720 Part VIII, providing and operating POL and operator charges of necessary road rollers and other equipment, providing testing apparatus and testing the degree of consolidation, dressing and levelling, etc. complete including disposal of all unserviceable materials if any beyond the boundary limit for all leads etc. as per drawings, specifications and directions of Engineer-in- Charge. The rate quoted shall include all royalties, right-of-way etc. complete. (Approved earth shall meet Client requirement) (Borrow area outside site limit shall be arranged by contractor only)
Boring/ drilling bore well of required dia for casing/ strainer pipe by suitable method prescribed in IS: 2800 (Part I) including collection of samples from different strata, preparing and submitting strata chart/ bore log, hire & running charges of all equipments, tools, plants & machineris required for the job, all complete as per direction of Engineer-in-Charge up to 90 m depth below ground level. in all type of soil - 300 mm dia bore well. This Permanent Bore Well is for Client use only.
Supplying, assembling, lowering and fixing in vertical position in bore well, unplasticized PVC medium well casing (CM) pipe of required dia, conforming to IS: 12818 including required hire and labour charges, fittings & accessories etc all complete for all depths as per direction of Engineer-in-Charge.
Providing and applying swellable type water stop tape, 19mm x 25mm thick in linear meter (expansive nature) for construction joints treatment of RCC structure such as raft slab, retaining walls, water storage tank and at the junctions of raft slab with the retaining walls etc. After cleaning the surface, one coat of required primer for swellable water stop tape shall be applied throughout the length of the joint @ 3.78 litre per 240 running meter. Over the primed surface swellable type water stop tape shall be placed. The work shall be carried out all complete as per specification and the direction of the Engineer-In-Charge. The product performance shall carry guarantee for 10 years against any leakage.
Providing and placing on terrace (at all floor levels) polyethylene water storage tank, IS : 12701 marked, with cover and suitable locking arrangement and making necessary holes for inlet, outlet and overflow pipes but without fittings and the base support for tank.
Providing and applying fully bonded, pre-applied, HDPE, composite waterproofing sheet membrane system with thickness of 1.2 mm with sand finish at top, HDPE film thickness > 0.8 mm and HDPE membrane composite ≥ 1.20 mm The membrane should have strong bonding property between the top sanded layer and fresh concrete, so that there is no lateral water migration between membrane and the structural concrete of underground structure. The overlaps min. 80 mm on side laps which.End laps the sand is removed by hot shoveling to a width of 80 mm and there upon the clean band is overlapped using double sided tape. The membrane shall have Resistance to static puncture ≥ 1000 N (ASTM E154) Tensile strength ≥ 25 MPa (film) (ASTM D412 mod) Elongation ≥ 550 % (ASTM D412 mod), Adhesion in peel ≥ 900 N/m (ASTM D903 mod), Joint peel resistance ≥ 1500 N/m (ASTM D1876), Foldability at low temperature Unaffected at -23 °C (ASTM D1970) Water absorption < 0.5 % (ASTM D570), Water tightness > 71 m of hydrostatic head (ASTM D5385 mod), Permeability to water vapour < 0.10 ng/Pa·s·m2 (ASTM E96, method B) The rates shall include cost and conveyance of all materials, labour charges, lead, lift etc. complete including finishing the edges as directed by the Engineer-in-charge at all levels. (The above work shall be carriedout by an agency having sufficient experience in membrane water proofing and should ensure a guarantee of 5 years). Only skilled and experienced persons shall be employed for this purpose.)
Construction of granular sub-base by providing close graded Material conforming to specifications, mixing in a mechanical mix plant at OMC, carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge. With material conforming to Grade-I (size range 75 mm to 0.075 mm) having CBR Value-30
Providing and laying factory made chamfered edge Cement Concrete paver blocks in footpath, parks, lawns, drive ways or light traffic parking etc, of required strength, thickness & size/ shape, made by table vibratory method using PU mould, laid in required colour & pattern over 50mm thick compacted bed of sand, compacting and proper embedding/ laying of inter locking paver blocks into the sand bedding layer through vibratory compaction by using plate vibrator, filling the joints with sand and cutting of paver blocks as per required size and pattern, finishing and sweeping extra sand. complete all as per direction of Engineer-in-Charge. 60mm thick cement concrete paver block of M-35 grade with approved colour, design & pattern.
Providing and fixing in position Stainless Steel Grade 304 Plate 1.00 mm thick as per design for expansion joints - 200 mm wide
Providing and fixing in position Stainless Steel Grade 304 Plate 1.00 mm thick as per design for expansion joints - 300 mm wide
Supplying and filling in plinth with sand under floors, including royalty, watering, ramming, consolidating and dressing complete. Supplying and filling clean, sand of approved quality conforming to Zone II & III as per IS 383 under floors, pavements, in foundation and tank ring wall, plinth, trenches etc. including cost of sand transportation for all leads, loading & unloading, spreading in layers of 150 mm loose thickness at all depths, watering, ramming, compacting to 90% dry density or as specified in drawing, dressing in slopes horizontally as required and leveling etc. all complete and as per directions of Engineer-in-Charge. (Rate for compacted thickness shall be considered.)
Boring, providing and installation of bored cast-in-situ reinforced cement concrete piles of garde M-35 using minimum of 400 Kg Cement per Cum of Concrete including providing and mixing required admixtures in recommended proportions as per IS 9103 as approved by the Engineer-in-Charge for achieving 150-200 mm slump, of specified diameter and length below pile cap, to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring with bentonite solution and temporary casing of appropriate length for setting out and removal of same and the length of the pile to be embedded in the pile cap etc. by Crawler mounted, telescopic boom hydraulic pilling Rig and including Rock socketing, Pile head chipping and disposal of same outside the site as specified in Employer's Requirements all complete in all respect as per approved drawing, specification and direction of Engineer-in-Charge, including removal of excavated earth with all its lifts and leads (length of pile for payment shall be measured up to bottom of pile cap). Note: Truck Mounted rotary/ TMR/ Tube well boring machine shall not be used.
600 mm dia piles
800 mm dia piles
1000 mm dia piles
Vertical load testing of piles in accordance with IS 2911 (Part IV) including installation of loading platform by Kentledge/ Anchor piles method and preparation of pile head or construction of test cap and dismantling of test cap after test etc. complete as per specification & the direction of Engineer in-charge. Note: Initial and Routine Load test shall not be carried out by Dynamic method of testing. Testing agency shall submit the design of loading platform for the approval of Engineer-in-Charge
Single pile upto 150 tonne Safe capacity Initial test (Test Load 2.5 times the Safe capacity)
Single pile beyond 150 tonne & upto 200 tonne Safe capacity Initial test (Test Load 2.5 times the Safe capacity)
Single pile beyond upto 150 tonne Safe capacity Routine test (Test Load 1.5 times the Safe capacity)
Single pile beyond 150 tonne & upto 200 tonne Safe capacity Routine test (Test Load 1.5 times the Safe capacity)
Providing & Fixing Steel reinforcement for Piling work including transporting to site, storing, straightening, cutting, bending, tying, lapping of bars/ butt welding/ placing in position and binding, correct shape and size as per detailed drawings, specifications, preparing and getting approved bar-bending schedules for Piling work with correct size of heavy duty PVC/ concrete (of same grade) cover blocks and galvanized binding wire of 18 gauge, required dewatering, provide required labour and machines/ equipment/ tools/ tackles for handling, shifting, bending, binding, etc. all complete in all respect at all depths, heights, lifts & leads. Only Thermo-mechanically treated reinforcement bars of grade Fe415/Fe550 with minimum total elongation of 14.5% conforming to IS:1786 shall be adopted. Note: Nothing extra is payable for laps, chairs, spacers, binding wire, mechanical couplers, wastage, etc.)
Conducting Low Strain Integrity Test on piles as per ASTM D 5882, including pile head preparation, mobilisation & demobilisation of testing apparatus/ equipments, skilled personnel, data collection/ recording, analyzing the results, preparing comprehensive report and submitting the same in 5 copies, all complete as per specifications and instructions of Engineer-in-Charge. Based on the review of LSI test results the number of tests may be increased as per the directions of Engineer-in-charge.
Providing and applying integral crystalline slurry of hydrophilic in nature for waterproofing treatment to the RCC structures like retaining walls of the basement, water tanks, roof slabs, podiums, reservior, sewage & water treatment plant, tunnels / subway and bridge deck etc., prepared by mixing in the ratio of 5 : 2 (5 parts integral crystalline slurry : 2 parts water) for vertical surfaces and 3 : 1 (3 parts integral crystalline slurry : 1 part water) for horizontal surfaces and applying the same from negative (internal) side with the help of synthetic fiber brush. The material shall meet the requirements as specified in ACI-212-3R-2010 i.e by reducing permeability of concrete by more than 90% compared with control concrete as per DIN 1048 and resistant to 16 bar hydrostatic pressure on negative side. The crystalline slurry shall be capable of self-healing of cracks up to a width of 0.50 mm. The work shall be carried out all complete as per specification and the direction of the engineer-incharge. The product performance shall carry guarantee for 10 years against any leakage.
For vertical surface two coats @ 0.70 kg per sqm
For horizontal surface one coat @1.10 kg per sqm.
Providing and applying crystalline mortar by mixing in the ratio of 4.5 : 1 (4.5 parts crystalline mortar : 1 part water) for the treatment of faulty construction joints, cracks, tie rod holes and spalled & honeycombed surface of RCC underground structures like basement, water tanks, bridge deck etc. to ensure water tightness. The crystallie mortar shall conform to the EN 1504-3 having compressive strength Class R4 > 45 MPa and adhesive bond strength Class R3 > 1.5 MPa. The work shall be carried out all complete as per specification and the direction of the Engineer-In-Charge. The product performance shall carry guarantee for 10 years against any leakage.
For sealing cracks and faulty construction joints, routed out/ making U-shape groove size 25x25mm and then primed the area with integral crystalline slurry @ 0.05kg/ running metre and while the surface is tacky filled the groove upto surface with crystalline mortar @1.50kg/ running metre. Once crystalline mortar is touch dry then finally applied two coats of integral crystalline slurry @ 0.05kg/running metre per coat.
For patching of tie rod holes, prepared tie rod hole surface and then primed the area with integral crystalline slurry @ 0.070 kg/sqm and while the surface is tacky repair and then filled the tie rod holes with crystalline mortar @ 0.040kg per hole. The crystalline mortar should be tightly rodded into tie rod holes or packed tightly (For 25x25x25 mm tie rod hole, use 0.040kg to fill the hole)
Monthly hire charges of Deep Bore Well: Cost includes required Pumps (minimum 5 HP capacity), maintenance of submersible Pumps with cables, HDPE Hose Pipes, Control Panels, Plumbing & Operation Charges, Operator/ Electrician/ Plumber/ Supervisors for 24/7 operation etc complete in all respect including discharge pipe lines as per the dewatering scheme including the specials etc. complete. Non operation hours/ days will not be considered for payment. Dewatering within various structures and buildings by submission of dewatering scheme, deploying required dewatering pumps, pipelines including standby equipment, additional equipment to cater the urgent needs, providing and erection of pipe sleeves and support embedded parts, wherever necessary, installation of pumps and pipelines, setting it to work, commissioning, maintaining the equipment and pipelines, maintaining day-to-day records in log books, dismantling and taking back the pumps and pipelines on completion of dewatering requirement etc., complete.
Conducting Standard penetration Test in pile bore as per the instruction of Engineer-in-charge.
Providing and laying Cement Concrete Pavement of Mix M30 with ready mixed concrete from batching plant. The ready mixed concrete shall be laid and finished with screed board vibrator, vaccum dewatering process and finally finished by floating, brooming withwire brush etc. complete as per specifications and directions of Engineer-in-charge. (The panel shuttering work shall be paid for seperately)
Lowering of water table by well point dewatering system as per direction of Engineer-in-Charge. including supply of dewatering pumps/ well point network/ Design / Detailing and execution of same to ensure water free surface at raft level to prevent uplift failure. Supply of all tools, tackles, machineries, manpower, maintaining till completion of works, complete in all respect. Operational cost of the dewatering pumps based on energy consumption. Note: The payment shall be made based on energy meter reading of the pump.
"NOTE:- THE ABOVE RATE SHALL BE INCLUSIVE OF ALL TAXES & DUTIES, ROYALTIES, CESS, FEE, ENVIORMENTAL & POLLUTION, FITNESS & SAFETY CLEARANCE CHARGES (IF ANY), OR ANY OTHER INCIDENTAL CHARGES ETC BUT EXCLUDING GST."
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.59 MB
eNIT_CONSTRUCTION_CMRL_2STATIONS.pdf
Tender Documents • 1.33 MB
BOQ_931981.xls
BOQ • 0.57 MB
BID_DOCUMENTS_Addendum01.rar
Additional Documents • 7.01 MB
EMPLOYER_REQUIREMENT_AND_GCC.rar
Additional Documents • 23.86 MB
Download all tender documents and submit your bid