Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹56.5 LAccepted-AOC NEAR L I C OFFICE PARASIA DISTT CHHINDWARA M P | PARASIA | CHHINDWARA | MADHYA PRADESH | 480441 | L1 | Accepted-AOC Lowest Rate | |
| 2 | L2₹59.6 L+₹3.1 L (5.43%)Rejected-Finance C O PARAS STD PCO MAIN ROAD PARASIA DISTT CHHINDWARA M P | PARASIA | CHHINDWARA | MADHYA PRADESH | 480441 | L2 | Rejected-Finance Higher Rate |
Tender Value
₹59.6 L
EMD Value
₹74,500
Closing Date
4 Jul 2022, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
General Manager (Opr.), Pench Area, WCL
Office of the Area General Manager Western Coalfields Limited Pench Area Parasia District Chhindwara
Construction of 6 Nos. Air Crossings for Development Panel SW-5 and 7DS development in Seam IV and II at Naheriya Underground Mine of Pench Area
2022_WCL_246568_1
pe3350-min-e0015-2022-23
Open Tender
Civil Works - Others
Item Rate
365 days
Naheriya Underground Mine of Pench Area
Please refer Tender documents.
6 documents required · 6 mandatory
₹74,500
23 Aug 2022
13 Jun 2022
6 Jul 2022
14 Jun 2022
4 Jul 2022
14 Jun 2022
14 Jun 2022 - 21 Jun 2022
Amount
Excavation Work by manual means in foundation or drains including dressing of sides and ramming of bottom, including getting out the excavated soil and disposal of same within lead of 50m in ordinary rock
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering all work upto plinth level (1:4:8) 1cement:4coarse sand:8graded stone
Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centering, shuttering, finishing and reinforcement - all work upto plinth level
Reinforcement cement concrete work in wall (any thickness ) including attached pillasters ,buttresses ,plinth and string courses ,fillets ,columns ,pillars ,piears ,abutments ,posts and stuts etc. up to floor five level excluding the cost of centering, shuttering,finishing and reiforcement : 1: 2:4 (1cement:2course sand : 4 graded stone aggregate 20mm nominal size.)
Reinforcement cement concrete work in beams, suspended floors, roofs having slope upto 15 landing, balconies, shelves, lintels, bands, plain window, sills staircases and spiral stair cases upto floor V level excluding the cost of centring and shuttering, finishing & reinforcement with 1:2:4 (1cement : 2coarse sand : 4graded stone aggregate 20mm nominal size)
Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete. Cold twisted bars
Centering and shuttering including strutting, propping etc. removal of form for RCC work
Providing and fixing upto floor five level precast cement concrete solid block including hoisting & setting in position with cement mortor 1:3 (1cement:3coarse sand), cost of required centring, shuttering and finishing smooth with 6mm thick cement plaster 1:3 (1cement:3fine sand) on exposed surface complete. 1:2:4 (1cement:2coarse sand:4graded stone aggregate 20mm nominal size)
12mm cement plaster of mix 1:4 (1Cement : 4Coarse Sand)
Earth in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30cm in depth, 1.5M in width as well as 10Sqm on plan including dressing of sides and ramming of bottom lift upto 1.5M including disposal of excavated earth, lead upto 50M and lift upto 1.50M disposal earth to be levelled & neatly cleaned. Hard rock (requiring blasting)
Carriage of materials by manual labour including unloading and stacking for lead less than 0.50Km
Cement for 1st 50M
Add 2 Lead x 33.047 = 66.094 Te.
Sand for 1st 50M
Add 2 Lead x 43.627 = 87.254 Cu.Mtr.
Metal for 1st 50M
Add 2 Lead x 84.155 = 168.310 Cu.Mtr.
Steel for 1st 50M
Add 2 Lead x 5.354 = 10.708 Te.
Total impact of GST for the purpose of CTC
DIAMOND CONSTRUCTION
DIAMOND CONSTRUCTION
stage.html
html • 0.04 MB
technical_254722.pdf
PDF • 0.03 MB
techsummary_254722.pdf
PDF • 0.03 MB
finance_254722.pdf
PDF • 0.09 MB
BOQ Comparative Chart
xlsx • 0.01 MB
finsummary_254722.pdf
PDF • 0.04 MB
AOC_WO_e0015.pdf
PDF • 2.06 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .