Loading…
Loading…
Tender Value
₹6.4 L
EMD Value
₹12,745
Closing Date
24 Aug 2026, 11:00 amDue today
V.P. Sarpanch
Village Panchayat, Pale-Cotombi, Bicholim-Goa 403505.
Construction of Compound Wall to MRF Shed in Sy. No. 50/8 at Ambegal of Village Panchayat Pale-Cotombi through XVth Finance Commission.
2026_VP_30973_1
V.P.Pale-Cotombi/BICH/E-Tender Notice/26-27/1831
Open Tender
Construction Works
Percentage
90 days
Pale-Cotombi
2 documents required · 2 mandatory
₹5,000
₹12,745
13 Aug 2026
13 Aug 2026
26 Aug 2026
13 Aug 2026
24 Aug 2026
13 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earthwork by excavation by mechanical means (hydraulic excavator)/manual means in foundation pipeline trenches, drains (not exceeding 1.5 m in width or 10 sq. m. on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m. | |||||
| 1.01 | All kinds of soil | 50.48 | cu.m | 291 | ₹14,689.68 |
| 2 | Rubble packing with hard laterite stone under floors, including watering, ramming and consolidating, etc., in pipeline trenches and other foundations, complete. | 8.5 | cu.m | 2,211 | ₹18,793.5 |
| 3Providing and laying cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded granite or basaltic stone aggregate, 20 mm nominal size), excluding the cost of centering, shuttering and finishing, in: | |||||
| 3.01 | All works up to plinth level | 44.91 | cu.m | 6,635 | ₹2,97,977.85 |
| 4Centering and shuttering, including strutting, propping and removal of forms for: | |||||
| 4.01 | Foundations, footings and bases for columns | 116.28 | cu.m | 407 | ₹47,325.96 |
| 5Providing and fixing weep holes with rigid PVC, laid in position with the required slope and level while laying pipes of approved concrete of retaining wall, wing wall and earth-retaining structure, complete as directed by the Engineer-in-Charge | |||||
| 5.01 | 75 mm diameter | 26.35 | RM | 185 | ₹4,874.75 |
| 6 | Laterite masonry in neatly dressed stones of size as specified in cement mortar 1:4 (1 cement : 4 coarse sand) in foundation and basement. | 8.36 | cu.m | 5,186 | ₹43,354.96 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.38 MB
BOQ_31371.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].