Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹1.7 L+₹20,205.70 (13.3%)Admitted-Finance VILLAGE DINOLI POST HAZARATPUR TEHSIL TUNDLA DISTRICT FIROZABAD UTTAR PRADESH | FIROZABAD | UTTAR PRADESH | 224172 | L2 | Admitted-Finance | |
| 3 | L3₹1.7 L+₹20,748.27 (13.6%)Admitted-Finance DINAULI TUNDLA FIROZABAD | FIROZABAD | UTTAR PRADESH | 224172 | L3 | Admitted-Finance | |
| 4 | Rejected-Technical | - | Rejected-Technical REJECT |
| Sl No | Description | Qty | Unit | PUSHPENDRA KUMAR CONTRACTOR L2 | M/s Laxmi Kant Sharma L1 | M/s DHARMVIR SINGH L3 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work in silt with slush and lehel for earth work excluding dewatering of clearance including lift up to 1.50 M and lead up to 200.00 M by manual labour or machines. The earth from clearance to be used in side embankment or to be disposed off on spoil banks or as directed by Engineer-in-charge. | 263.77 | cum | 65 ₹17,145.05 Lowest | 92.02 ₹24,272.12 | 90 ₹23,739.3 |
| 2.00 | Scraping internal section of existing channel in slope with silt up to 5 cm. | 24,689 | sqm | 5.6 ₹1,38,258.4 | 3.87 ₹95,546.43 Lowest | 4.48 ₹1,10,606.72 |
| 3.00 | Cleaning thick bushes and thorny jungle without uprooting with all cost of T&P etc complete | 8,640 | sqm | 2 ₹17,280 Lowest | 3.78 ₹32,659.2 | 4.5 ₹38,880 |
Tender Value
Refer Docs
EMD Value
₹4,000
Closing Date
29 Sept 2026, 1:00 pmClosed
EXECUTIVE ENGINEER
IRRIGATION DIVISION FIROZABAD
SCRAPPING WORK IN SUNARI MINOR FROM KM 0.000 TO 6.400
2026_UPIDC_1188447_27
05/EE/2026-27
Open Tender
Civil Works
Item Wise
15 days
SCRAPPING WORK IN SUNARI MINOR FROM KM 0.000 TO 6.
Please refer Tender documents.
2 documents required · 2 mandatory
₹856
₹4,000
9 Oct 2026
23 Sept 2026
29 Sept 2026
23 Sept 2026
29 Sept 2026
23 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in silt with slush and lehel for earth work excluding dewatering of clearance including lift up to 1.50 M and lead up to 200.00 M by manual labour or machines. The earth from clearance to be used in side embankment or to be disposed off on spoil banks or as directed by Engineer-in-charge. | 263.77 | cum | - | - |
| 2 | Scraping internal section of existing channel in slope with silt up to 5 cm. | 24,689 | sqm | - | - |
| 3 | Cleaning thick bushes and thorny jungle without uprooting with all cost of T&P etc complete | 8,640 | sqm | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.71 MB
BOQ_2239789.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .