Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹7.3 LAdmitted-Finance | -20.10% | ₹7.3 L | L1 | Admitted-Finance |
| 2 | L2₹8.3 L+₹1.0 L (14.1%)Admitted-Finance | -8.86% | ₹8.3 L+₹1.0 L (14.1%) | L2 | Admitted-Finance |
| 3 | L3₹8.4 L+₹1.1 L (15.0%)Admitted-Finance | -8.09% | ₹8.4 L+₹1.1 L (15.0%) | L3 | Admitted-Finance |
| 4 | L4₹8.4 L+₹1.1 L (15.1%)Admitted-Finance | -8.00% | ₹8.4 L+₹1.1 L (15.1%) | L4 | Admitted-Finance |
| 5 | L5₹8.8 L+₹1.6 L (21.4%)Admitted-Finance | -3.00% | ₹8.8 L+₹1.6 L (21.4%) | L5 | Admitted-Finance |
Tender Value
₹9.1 L
EMD Value
₹18,183
Closing Date
24 Feb 2026, 3:00 pmClosed
EE(E)/ELD-13/DDA
Executive Engineer (E) /ELD-13/DDA, Near Hasanpur Bus Depot. Delhi. 110092
Supplying, replacement of street/flood lights in DDA parks / green under HD-4/DDA.
2026_DDA_898952_1
53/EE/ELD-13/DDA/2025-26
Open Tender
Electrical Works
Percentage
365 days
As per NIT documents.
Please refer Tender documents.
9 documents required · 9 mandatory
₹0
₹18,183
7 Mar 2026
17 Feb 2026
25 Feb 2026
17 Feb 2026
24 Feb 2026
17 Feb 2026
Suppliying & fixing of 500mm long single over hang bracket made out of suitable dia. G.I pipe with a canopy of 300mm long suitable for 65 mm dia G.I pole i/c nuts,bolts etc. as reqd.
Supply, replacement, testing & commissioning of LED Flood Light, powder coated pressure die cast aluminium (System lumen efficacy ≥120 and <135 lm/Watt), powder coated pressure die cast aluminium body with built in or separate driver as per the requirement with Driver efficiency >85%, Input voltage: Input voltage: 140-270 Volt AC, freq 50/60 hz, Operating temp range -5 deg to 50 deg centigrade, internal surge protection of 5 KV L,N,E as per IEC 61000-4-5, Driver efficiency >85%,THD < 10% as per IEC 61000-3-2 , P. F.≥0.95, IP-66,IK-10, CRI >70, under voltage and over voltage protection, EMI-EMC as per CISPR -15, lenses for beam angle 30 deg-120deg as per the application and the project requirement deg., suitable tilt able fitting, life time (LED,Driver & electrical circuitary) of minimum 50000 Burning Hours with 70% of initial Lumen maintained till life ends as per LM80 extrapolation IES TM-21-11 report, CCT 3000°K / 4000°K / 5700°K /6500°K (As per ANSI Bin) , SDCM(Standard Deviation Color Matching) <5, Maximum power consumption should not more than the specified rating and Fixture shall be of relevant BIS standard complete in all respect i/c external connections with 1.5 sq mm FRLS/HFFR, PVC insulated copper conductor single core cable and earthing etc. as required with Minimum 5 year OEM warranty. System lumen efficacy ≥120 and <135 lm/Watt output .LM79 & LM80 Test report and all testing required for LED fixtures as per BIS shall be submitted. Shape size and CCT shall be as approved by Engineer-in-Charge as per requirement. (Thermal management: heat sink of aluminium housing such that LED junction temperature shall not rise above 90°C). Rate including rebate for dismantled material
Supply, replacement, testing & commissioning of LED Street light fixture, powder coated pressure die cast aluminium body (System lumen efficacy ≥120 <135 lm/Watt) powder coated pressure die cast aluminium body with driver as per the requirement with Driver efficiency >85%, Input voltage: 140-270 Volt AC, frequency 50/60 hz, Operating temp range -5 0C to 50 0C, internal surge protection of 5 KV L,N,E as per IEC 61000-4-5, Driver efficiency >85%,THD < 10% as per IEC 61000-3-2, P. F.≥0.95, IP-66,IK-10, CRI >70, under voltage and over voltage protection, EMI- EMC As per CISPR 15 , lenses for beam angle as per IESNA type I/II/III as per the width of the road and the project requirement., suitable to fit in up to 65mm dia pipe, life time (LED, Driver & electrical circuitry) of minimum 50000 Burning Hours with 70% of initial Lumen maintained till life ends as per LM80 extrapolation IES TM-21-11 report, CCT 3000°K / 4000°K / 5700°K /6500°K (As per ANSI Bin), SDCM(Standard Deviation Colour Matching) <5, Maximum power consumption should not more than the specified rating and Fixture shall be of relevant BIS standard complete in all respect i/c external connections with 1.5 sq mm FRLS/HFFR, PVC insulated copper conductor single core cable and earthing etc. as required with Minimum 5 year OEM warranty. System lumen efficacy ≥120 <135 lm/Watt output . LM79 & LM80 Test report and all testing required for LED fixtures as per BIS shall be submitted. Shape size and CCT shall be as approved by Engineer-in-Charge as per requirement. (Thermal management: heat sink of aluminium housing such that LED junction temperature shall not rise above 90°C). Rate including rebate for dismantled material
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.19 MB
Tendernotice_2.pdf
PDF • 3.10 MB
BOQ_944908.xls
BOQ • 0.32 MB
corrigendum53.pdf
PDF • 0.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .