Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹78.6 LAccepted-AOC | L-1 | Accepted-AOC L-1 | |
| 2 | L-2₹81.6 L+₹3.0 L (3.83%)Rejected-Finance 00 0 FATEHPUR NEAR SAHARA FARM BAKKAS LUCKNOW LUCKNOW UTTAR PRADESH 226002 | LUCKNOW | UTTAR PRADESH | 226002 | L-2 | Rejected-Finance L-2 | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification | |
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | M/S ARYA ENTERPRISES L2 | SAI GENERAL ENGINEERING WORKS L1 |
|---|---|---|---|---|---|
| 1.00CONSTRUCTION INLET | |||||
| 1.01 | E/W in filling in making Canal Diversion and in raising, levelling & dressing canal bank in all type of soil including all lead and lift as per direction by engineer in charge required for proper complection of work including cost of all T&P,Labour etc. | 4,280.25 | M3 | 50 ₹2,14,012.5 Lowest | 115 ₹4,92,228.75 |
| 1.02 | E/W in excavation of foundation in all type of soil including iall lead & lift and its proper disposal as per direction by engineer in charge required for proper complection of work including cost of all T&P,Labour etc. | 956.15 | M3 | 50 ₹47,807.5 Lowest | 82 ₹78,404.3 |
| 1.03 | Centering & shuttering of RCC work in different part of structure with all leads & lifts required for proper completion of work including cost of all material, scaffolding, T&P & labour etc. | 437.63 | M2 | 500 ₹2,18,815 Lowest | 540 ₹2,36,320.2 |
| 1.04 | Centering & shuttering of CC work in different part of structure with all leads & lifts required for proper completion of work including cost of all material, scaffolding, T&P & labour etc. | 230.89 | M2 | 180 ₹41,560.2 Lowest | 195 ₹45,023.55 |
| 1.05 | Laying C.C. 1:3:6 (M-10) in foundation with coarse sand of F.M. not less than 2.0 and kabari stone grit of size 20 mm to 40mm including cost of all material labour, T&P etc | 25.28 | M3 | 8,000 ₹2,02,240 Lowest | 8,250 ₹2,08,560 |
| 1.06 | Laying C.C. 1:2:4 (M-15) in foundation with coarse sand of F.M. not less than 2.0 and kabari stone grit of size 20 mm to 40mm including cost of all material labour, T&P etc | 108.57 | M3 | 9,000 ₹9,77,130 | 8,250 ₹8,95,702.5 Lowest |
| 1.07 | Laying R.C.C .(M-25) with cement (OPC 43 grade),coarse sand of FM not less than 2.5 and crushed hard stone grit size 4.75 to 20mm including lead pto 60m, lift upto 3m,mechanical mixing & mechanical vibration but excluding cost of centering & shuttering required for proper completion of work including cost of all material, T&P & labour etc. | 198.19 | M3 | 10,000 ₹19,81,900 | 8,250 ₹16,35,067.5 Lowest |
| 1.08 | Cutting, bending, placing and binding TMT steel bar for Reinforcement with cost of binding wire required for proper completion of work including cost of all material, T&P & labour etc. | 17.9 | MT | 74,000 ₹13,24,600 | 62,050 ₹11,10,695 Lowest |
| 1.09 | Earth work in Back -filling including lead up to 30m lift up to 1.5m including manual compaction & dressing to profile. | 478.08 | M3 | 50 ₹23,904 Lowest | 68 ₹32,509.44 |
Tender Value
₹1.1 Cr
EMD Value
₹2.1 L
Closing Date
14 Sept 2026, 1:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SUPERINTENDING ENGINEER
SUPERINTENDING ENGINEER RAPTI NAHAR NIRMAN MANDAL 1 BALRAMPUR
As per Tender Notice
2026_UPIDC_1178475_1
03/SE/2026-27
Open Tender
Civil Works - Canal
Item Rate
90 days
Gorakhpur
As Per Tender Notice
2 documents required · 2 mandatory
₹2,354
₹2.1 L
Yes
24 Oct 2026
3 Sept 2026
14 Sept 2026
3 Sept 2026
14 Sept 2026
3 Sept 2026
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1CONSTRUCTION INLET | |||||
| 1.01 | E/W in filling in making Canal Diversion and in raising, levelling & dressing canal bank in all type of soil including all lead and lift as per direction by engineer in charge required for proper complection of work including cost of all T&P,Labour etc. | 4,280.25 | M3 | - | - |
| 1.02 | E/W in excavation of foundation in all type of soil including iall lead & lift and its proper disposal as per direction by engineer in charge required for proper complection of work including cost of all T&P,Labour etc. | 956.15 | M3 | - | - |
| 1.03 | Centering & shuttering of RCC work in different part of structure with all leads & lifts required for proper completion of work including cost of all material, scaffolding, T&P & labour etc. | 437.63 | M2 | - | - |
| 1.04 | Centering & shuttering of CC work in different part of structure with all leads & lifts required for proper completion of work including cost of all material, scaffolding, T&P & labour etc. | 230.89 | M2 | - | - |
| 1.05 | Laying C.C. 1:3:6 (M-10) in foundation with coarse sand of F.M. not less than 2.0 and kabari stone grit of size 20 mm to 40mm including cost of all material labour, T&P etc | 25.28 | M3 | - | - |
| 1.06 | Laying C.C. 1:2:4 (M-15) in foundation with coarse sand of F.M. not less than 2.0 and kabari stone grit of size 20 mm to 40mm including cost of all material labour, T&P etc | 108.57 | M3 | - | - |
| 1.07 | Laying R.C.C .(M-25) with cement (OPC 43 grade),coarse sand of FM not less than 2.5 and crushed hard stone grit size 4.75 to 20mm including lead pto 60m, lift upto 3m,mechanical mixing & mechanical vibration but excluding cost of centering & shuttering required for proper completion of work including cost of all material, T&P & labour etc. | 198.19 | M3 | - | - |
| 1.08 | Cutting, bending, placing and binding TMT steel bar for Reinforcement with cost of binding wire required for proper completion of work including cost of all material, T&P & labour etc. | 17.9 | MT | - | - |
| 1.09 | Earth work in Back -filling including lead up to 30m lift up to 1.5m including manual compaction & dressing to profile. | 478.08 | M3 | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.28 MB
BOQ_2214884.xls
BOQ • 0.26 MB
lot1.pdf
Tender Documents • 3.54 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .