| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹94.8 LAdmitted-Finance N A | NA | NA | 121004 | L1 | Admitted-Finance | |
| 2 | L2₹1.1 Cr+₹11.1 L (11.7%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹1.1 Cr+₹12.8 L (13.5%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹1.2 Cr+₹22.7 L (24.0%)Admitted-Finance | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Rajesh Kumar Gupta L4 | MOHD AFTAB L3 | MAHENDRA KUMAR GIRI L2 | Aakar Infra Engineers Private Limited L1 |
|---|---|---|---|---|---|---|---|
| 1.00Sub Head 1 item no 1.1 to 1.9:- Construction of revetment for transmission towers of 220 kv SOW-Mandola Ckt I, II, III & IV. | |||||||
| 2.00 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30cm in depth. 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth, lead upto 50m and for all lift as directed by Eningeer-in-charge.All kinds of soil (2016DSR2.6.1) | 235 | M3 | 23,500 ₹27,730 Lowest | 34,107.9 ₹40,247.32 | 40,349.5 ₹47,612.41 | 30,550 ₹36,049 |
| 3.00 | Excavating, supplying, stacking and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in foundation trenches, plinth, sides of foundation etc. complete for all lifts. (DSR 2.25(a)) | 2,000 | M3 | 10,00,000 ₹11,80,000 | 11,00,000 ₹12,98,000 | 8,64,400 ₹10,19,992 Lowest | 8,80,000 ₹10,38,400 |
| 4.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : - 1:4:8 (1Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) (2016DSR4.1.8) | 20 | M3 | 1,00,000 ₹1,18,000 | 1,10,000 ₹1,29,800 | 93,240 ₹1,10,023.2 Lowest | 1,16,000 ₹1,36,880 |
| 5.00 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources and using recycled concrete aggregate (RCA) as coarse aggregate and fine aggregate within permissible utilization of 20% each, Portland Pozzolana /Ordinary Portland/Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement. All works upto plinth level Concrete of M25 grade with minimum cement content of 330 kg /cum (DSR5.33A.1.1) | 320 | M3 | 28,80,000 ₹33,98,400 | 24,40,320 ₹28,79,577.6 | 23,05,280 ₹27,20,230.4 | 21,76,000 ₹25,67,680 Lowest |
| 6.00 | Centering and shuttering including strutting, propping etc. and removal of form for :Foundations, footings, bases of columns, etc. for mass concrete(DSR5.9.1) | 220 | M2 | 66,000 ₹77,880 | 70,356 ₹83,020.08 | 46,640 ₹55,035.2 Lowest | 70,400 ₹83,072 |
| 7.00 | Centering and shuttering including strutting, propping etc. and removal of form for :Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. (DSR5.9.2) | 720 | m2 | 4,32,000 ₹5,09,760 | 4,95,936 ₹5,85,204.48 | 3,42,000 ₹4,03,560 | 2,73,600 ₹3,22,848 Lowest |
| 8.00 | Centering and shuttering including strutting, propping etc. and removal of form for :Columns, Pillars, Piers, Abutments, Posts and Struts (DSR5.9.6) | 100 | M2 | 85,000 ₹1,00,300 | 78,720 ₹92,889.6 | 50,800 ₹59,944 | 40,000 ₹47,200 Lowest |
| 9.00 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars of grade Fe500 D or more. (DSR5.22.6) | 9,500 | KG | 5,70,000 ₹6,72,600 Lowest | 7,60,000 ₹8,96,800 | 7,69,500 ₹9,08,010 | 8,07,500 ₹9,52,850 |
| 10.00 | Extra rates for quantities of works, executed In or under foul position, including pumping out water as requried. Note for item no. 2.24:- The extra percentage rate is applicable in respect of each item but limited to quantities of work executed in these difficult conditions. The unit, namely, metre depth, to be considered for payment,shall be the depth measured from the sub soil water level up to the centre of gravity of the qty executed in difficult conditions. The depth shall be reckoned correct to 0.10 m, 0.05 m or more shall be taken as 0.10 m and less than 0.05 m ignored. ----Here quantity is taken as sum total amount (in Rs) for item no. 1.1 to 1.8 divided by 100 for adjusting rate quoted in percentage as per item of DSR2.24.2 | 63,794 | Metre depth | 6,37,940 ₹7,52,769.2 | 76,552.8 ₹90,332.3 | 7,65,528 ₹9,03,323.04 | 31,897 ₹37,638.46 Lowest |
Tender Value
₹1.3 Cr
EMD Value
₹2.6 L
Closing Date
18 Aug 2026, 1:00 pmClosed
DGM T Services
Ground Floor, Room No. 2 Maintenance Block Building near 220kv substation Delhi Transco Limited at Indraprastha New Delhi
Construction of revetment towers constr of support trench Dwarka finishing works Masjid Moth
2026_DTL_292493_2
T26P750006
Open Tender
Civil Works
Works
240 days
SOW Mandola Dwarka Masjid moth
Please refer Tender documents.
9 documents required · 9 mandatory
₹0
₹2.6 L
Yes
28 Sept 2026
27 Jul 2026
18 Aug 2026
27 Jul 2026
18 Aug 2026
27 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Sub Head 1 item no 1.1 to 1.9:- Construction of revetment for transmission towers of 220 kv SOW-Mandola Ckt I, II, III & IV. | - | - | - | - |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30cm in depth. 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth, lead upto 50m and for all lift as directed by Eningeer-in-charge.All kinds of soil (2016DSR2.6.1) | 235 | M3 | 100 | ₹23,500 |
| 3 | Excavating, supplying, stacking and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in foundation trenches, plinth, sides of foundation etc. complete for all lifts. (DSR 2.25(a)) | 2,000 | M3 | 100 | ₹2,00,000 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : - 1:4:8 (1Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) (2016DSR4.1.8) | 20 | M3 | 100 | ₹2,000 |
| 5 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources and using recycled concrete aggregate (RCA) as coarse aggregate and fine aggregate within permissible utilization of 20% each, Portland Pozzolana /Ordinary Portland/Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement. All works upto plinth level Concrete of M25 grade with minimum cement content of 330 kg /cum (DSR5.33A.1.1) | 320 | M3 | 100 | ₹32,000 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for :Foundations, footings, bases of columns, etc. for mass concrete(DSR5.9.1) | 220 | M2 | 100 | ₹22,000 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for :Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. (DSR5.9.2) | 720 | m2 | 100 | ₹72,000 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for :Columns, Pillars, Piers, Abutments, Posts and Struts (DSR5.9.6) | 100 | M2 | 100 | ₹10,000 |
| 9 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars of grade Fe500 D or more. (DSR5.22.6) | 9,500 | KG | 100 | ₹9,50,000 |
| 10 | Extra rates for quantities of works, executed In or under foul position, including pumping out water as requried. Note for item no. 2.24:- The extra percentage rate is applicable in respect of each item but limited to quantities of work executed in these difficult conditions. The unit, namely, metre depth, to be considered for payment,shall be the depth measured from the sub soil water level up to the centre of gravity of the qty executed in difficult conditions. The depth shall be reckoned correct to 0.10 m, 0.05 m or more shall be taken as 0.10 m and less than 0.05 m ignored. ----Here quantity is taken as sum total amount (in Rs) for item no. 1.1 to 1.8 divided by 100 for adjusting rate quoted in percentage as per item of DSR2.24.2 | 63,794 | Metre depth | 100 | ₹63,79,400 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.56 MB
NITTowerDwarkaMMoth.pdf
Tender Documents • 1.54 MB
BOQ_393558.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .