Tender Value
₹2.4 Cr
EMD Value
₹2.4 L
Closing Date
7 Jul 2026, 5:00 pm
Similar tender results from the same govt authority in the past 3 years.
Chief Construction Engineer ,Western NH Circle SBP
O/ the CCE , Western NH Circle Sambalpur
Construction of 4 nos of D Type twin NH staff Quarter at Kesinga for the year 2025-26
2026_CENH_132549_1
IFB-03/CCE-WNHC-SBP of 2026-27
National Competitive Bid
Civil Works - Buildings
330 days
Kesinga
Please refer Tender documents.
4 documents required · 4 mandatory
₹10,000
₹2.4 L
Yes
23 Jun 2026
23 Jun 2026
8 Jul 2026
23 Jun 2026
7 Jul 2026
23 Jun 2026
23 Jun 2026 - 30 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Diluting and injecting chemical emulsion (to be supplied free of cost at site of work) for PRE CONSTRUCTIONAL Anti-termite treatment and creating a continuous chemical barrier under and all-round the column pits, wall trenches, basement excavation, top perimeter of building, expansion joints, over the top surface of consolidated earth on which apron is to be laid, surroundings of pipes and conduits etc. complete as per specifications (plinth area of the building at ground floor only shall be measured for payment). | 252 | Sqm | 104.5 | ₹26,334 | 1 |
| 2 | Earth work in excavation of foundation trenches in hard soil including dressing of sides and levelling the bed up to the required depth and depositing the excavated materials away from the work site within 50m initial lead & 1.5m initial lift. complete as directed by the E.I.C.(As Per AR Page No.-1, Item No.-1) | - | Cum | 276.9 | - | 2 |
| 3 | Supplying & filling of foundation with course sand well watered and rammed including cost, cost of all labour, carriage, royalty complete in all respect. (As Per A/R Page No-1, Item No-2) | - | Cum | 581.3 | - | 3 |
| 4 | Cement Concrete (1:3:6) using 40mm size hard granite C.B. metal approved quality from approved quarry including cost, carriage, royalty, cost of all labour. etc complete and as directed by E.I.C. | - | Cum | 5,644.2 | - | 4 |
| 5 | Cement Concrete (1:2:4) using 12mm size hard granite C.B. chips approved quality from approved quarry including cost, carriage, royalty, cost of all labour. etc complete and as directed by E.I.C. | - | Cum | 7,135.6 | - | 5 |
| 5.1 | Providing and lying plain cement concrete of proportion (1:4:8) in foundation and floors using Portland slag cement (PSC) with 40 mm. Size black hard crusher broken granite stone metal and screened and washed sharp sand for mortar of approved quality from approved quarry, washed and cleaned including hoisting, lowering, laying concrete, ramming, watering and curing etc. complete to required levels laid in layers not exceeding 15 cm thick in each layer including cost, conveyance, loading, unloading, royalties and taxes all materials and cost all labours, sundries, T & P required for the work including shoring, shuttering and dewatering if required including hire & running charges of water pump complete as per the instruction of the Engineer-in-Charge. | 16.17 | Cum | 5,336.6 | ₹86,292.82 | 6 |
| 5.11 | Supplying all materials, labour, T&P and providing M.S reinforcement for R.C.C work including cutting, bending, binding, and tying the grills and placing in position including cost of binding wire 18 to 20 gauge, conveyance of all materials to worksite, payment of royalty, taxes etc all complete as per specification and direction of the Engineer-In-Charge. | 28.67 | Qtl | 8,607.8 | ₹2,46,785.63 | 7 |
| 6 | R.C.C. M-20 grade with 20mm and down grade C.B. chips of approved quality from approved quarry including hoisting, laying hire charges of concrete mixture, vibrator, watering, curing and cost of all materials and labour, centering shuttering etc complete but excluding cost of reinforcement.(A) COLUMN BASE FOOTING | - | Cum | 5,963.2 | - | 8 |
| 6.1 | A) COLUMN SUPERSTRUCTURE
a) Ground Floor | - | Cum | 15,219.7 | - | 9 |
| 6.11 | b) First Floor | 11.22 | Cum | 17,267.9 | ₹1,93,745.84 | 10 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.10 MB
DTCNIFB03.pdf
Tender Documents • 2.06 MB
BOQ_597321.xls
BOQ • 0.45 MB
Download all tender documents and submit your bid