Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Responsive Technical bid |
| 2 | Accepted-Technical | Accepted-Technical Responsive Technical bid |
| 3 | Accepted-Technical | Accepted-Technical Responsive Technical bid |
| 4 | Accepted-Technical | Accepted-Technical Responsive Technical bid |
| 5 | Accepted-Technical | Accepted-Technical Responsive Technical bid |
Tender Value
Refer Docs
EMD Value
₹1.1 Cr
Closing Date
22 Apr 2026, 4:00 pmClosed
Project Manager (Executive Engineer, Designs)
CDC, PWD Puducherry
Providing and Laying Underground Sewerage Networks in Zones 12-1 and 12-2 and Constructing In-line Pumping Station 12-2-1 at Odiampet in Puducherry
2026_ADB_21867_1
04/PWD/ADB/PDY/2025-26
Open Tender
Civil Works - Others
Item Rate
Puducherry
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹1.1 Cr
Yes
Puducherry
7 Aug 2026
27 Feb 2026
22 Apr 2026
27 Feb 2026
22 Apr 2026
6 Apr 2026
13 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Preparation of As Built GIS Maps and Surveys | |||||
| 1.1 | As built survey for every sewage and water pipeline and other assets must be done using DGPS based RTK method by transferring the coordinates from the nearest Static GCP of CMWSSB and establishing TBMs for the project area as instructed by CMWSSB Engineer.
Where there are signal interruptions for the RTK method, Total Station can be used. The coordinates from the static GCP shall be transferred to the Total Station by RTK method and the co- ordinates of the assets can then be captured by Total Station.
While surveying by RTK method, it shall be ensured that the values are captured by “fixed” status.
The DGPS RTK survey report including “fixed” or “float” for the coordinates captured and horizontal & vertical precision with raw data in OEM nativity file format like (.mdb, .jxl, .tet, etc) shall be submitted.
All the features, attributes of all the assets, utilities captured shall be Geo referenced as per standard Coordinate reference system (WGS 84 UTM Zone 44N). | 54.36 | km | - | - |
| 1.2 | The final base map with assets and utilities shall be furnished in (.shp) format. The geo referenced assets and utilities along with the attributes shall be converted into proper geo database (FGDB / PGDB) with the attributes.
One set Hard and Soft Copy of all the assets and utility has to be prepared category wise network wise in A0 Print for verification in a print scale of 1:1000 in A0 plot, with standard legends in international and NUIS standards and should be legible and three sets of final Hard Copy in A0 print.
For the Underground / Surface Assets along the roads for the distance above 100 km | - | - | - | - |
| 2DISMANTLING Pavements | |||||
| 2.1 | Cutting open B.T. Road or macadam road for laying water main / sewer lines and stacking the usable materials on road side for reuse in road works. | 6,027.12 | cum | - | - |
| 2.2 | Cutting open concrete road for laying water main/sewer lines & stacking the usable materials on road side for reuse in road works. | 2,702.7 | cum | - | - |
| 3EARTH WORK (SEWER) | |||||
| 3.1 | Earth work excavation above water level | - | - | - | - |
| 3.11 | Earth work excavation above water level and depositing on bank in sandy, silt or other soil, wet sand or silt, light black cotton soil or clay, sandy loam and ordinary soil for infiltration, gallery siphon or connecting pipe line including driving shoring materials as mentioned below. Removing the shoring materials and refilling with excavated earth complying with standard specification etc., complete. -- First depth of 2 m (using close timbering) | 57,220.56 | cum | - | - |
| 3.12 | Earth work excavation above water level and depositing on bank in sandy, silt or other soil, wet sand or silt, light black cotton soil or clay, sandy loam and ordinary soil for infiltration, gallery siphon or connecting pipe line including driving shoring materials as mentioned below. Removing the shoring materials and refilling with excavated earth complying with standard specification etc., complete. --- Second depth of 2 m (using close timbering) | 9,892.29 | cum | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.16 MB
Tendernotice_2.pdf
PDF • 0.14 MB
tenderdocumentvol1.pdf
Tender Documents • 1.68 MB
tenderdocumentvol2.pdf
Tender Documents • 0.52 MB
annexurevol5.pdf
Additional Documents • 2.53 MB
drawings.pdf
Additional Documents • 20.98 MB
BOQ_22303.xls
BOQ • 0.40 MB
corrigendum4pkg3.pdf
PDF • 0.56 MB
corrigendum3ugss3.pdf
PDF • 1.07 MB
pkg3corrigendum2.pdf
PDF • 5.64 MB
918.pdf
PDF • 1.00 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .