Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance GHUNI MONDAL PARA NEWTOWN KOLKATA | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance 24 8A MANUJENDRA DUTTA ROAD KOLKATA 700 028 | KOLKATA | 24 PARAGANAS NORTH | WEST BENGAL | 700028 | Admitted-Finance |
| 5 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
11 Sept 2024, 3:00 pmClosed
MD SBSTC
SBSTC HEAD OFFICE , DURGAPUR - 713201
IN HOUSE BUS BODY REPAIR / RENOVATION OF SBSTC BUSES INSIDE WORKSHOP PREMISES
2024_SBSTC_737625_1
SBSTC/E-TND-02/IN HOUSE BUS BODY REPAIR / RENOVATION/ DDW/906/SBSTC/24
Open Tender
Miscellaneous Works
Item Rate
15 days
SBSTC HEAD OFFICE, DURGAPUR - 713201
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
SBSTC HEAD OFFICE , DURGAPUR - 713201
23 Oct 2024
23 Aug 2024
14 Sept 2024
23 Aug 2024
11 Sept 2024
23 Aug 2024
28 Aug 2024
Full body renovation job(For Aluminum Structure):- No. of working days- 35 days (Given in NIT)
Full body renovation job( For M/S Structure):- No. of working days- 40 days (Given in NIT)
Partial body renovation job(For Aluminum Structure):- No. of working days- 30 days (Given in NIT)
Partial body renovation job( For M/S Structure):- No. of working days. – 35 days (Given in NIT)
Full body renovation job(For A.C. Coach):-No. of working days. – 45 days (Given in NIT)
Partial body renovation job(For A.C. Coach):-No. of working days. – 35 days (Given in NIT)
Full body renovation job( For Midi Bus):- No. of working days. – 25 days (Given in NIT)
Partial body renovation job( For Midi Bus):- No. of working days. – 20 days (Given in NIT)
Miscellaneous body repairing jobs:- No. of working days. Mentioned below:-
Looking glass to fit. ⅛ day
Looking glass to fit after braket repairing. ¼ day
Inside LCD Monitor to fit. ¼ day
Radiator mounting braket to repair each. ¼ day
Radiator braket to repair. ¼ day
Timing cover to repair. ¼ day
Passenger gate for A/C to adjust for proper closing & opening. ½ day
Bonnet lock to fit/repair each. ¼ day
Driver gate/Passenger gate door lock to changed. ¼ day
Mudguard to repair. ½ day
Engine bonnet to be repair. ½ day
Roof top cover to repair for A/C. ½ day
Radiator grill to repair. ½ day
Radiator grill to make newly. 2 days
Driver gate to repair. 1 day
Driver gate to make newly. 2 days
Foot rest for A/C passenger seat to repair. 1 day
Passenger seat shock absorber to repair. ¼ day
Dickey lock to repair/changed. ¼ day
Gear lever bottom cover to make by rexine. ¼ day
Electrical G/check. ½ day
Wipper machine to fit. ¼
Wipper machine to fit after linkage modifyng. ½
Roof light to fit each. ¼
Head light L/S & R/S to fit & line to connect. ½
Back light L/S & R/S to fit & line to connect. ½
Electric horn to fit & line to connect. ¼
Indicator light to fit & line to connect. ¼
Combination switch to change. ¼
Stop light line to change. ¼
Louver to change for each pair. ¼
Self to change. ½
Alternator to change. ½
Floor mat pasting for A/C buses. 2 days
Valvate pasting for roof inside ceiling. 1 day
Passenger stair mat to paste for A/C buses. ½
Passenger seat clamp making for each. ¼
Back side grill to repair.½
Back side grill to make newly. 1 day
Electrical wiring newly making & fitting. 4 days
New trolly making. 2.5 days
Trolley repair. 1 day
Back restcap making (each). ⅛ days
Accidental bend chassis to repair (minor). 3 days
Accidental bend chassis to repair (major). 5 days
Stepny braket to repair. 1 day
Propeler Shaft cross member to repair. ½ day
Passenger gate with passenger stair height to shorten. 2 days
Passenger seat handle making (wooden). ⅛ day
Passenger seat handle making (M/S). ½ day
Inside body post to fit. ¼ day
Back seat platform to repair. 1 day
All passenger seat & back rest opening & fitting. 1 day
Head light portion to modify. 2 days
Front left/Right ventilator glass frame repair/newly makeup. ½ day
Window upper glass to fit. ½ day
Marcopolo window glass and rubber to change. ½ day
Marcopolo window glass sliding to change. ¼ day
Left side golai to repair. 3 days
Right side golai to repair. 3 days
Mudguard rubber to fit. ¼ day
Passenger seat frame newly making (each) (3 seater Deluxe). 2 days
Passenger seat frame newly making (each) (2 seater Deluxe). 2 days
Passenger seat frame newly making (each) (3 seater Semi deluxe). 2 days
Passenger seat frame newly making (each) (2 seater Semi deluxe). 2 days
Window glass guard M.S. flat/pipe to fit (each side). ¼ day
Body- u-bolt to tighten/change. 1 day
Front show lower both side newly made & painting. 7 days
Miscellaneous body repairing jobs:-No. of working days mentioned below:-
Front structure to be made new. (Top to bottom)with painting. 08 days
Left or right side structure to be repair. (Major). 04 days
Front structure to be repair. (Minor). 04 days
Front wind screen to change left/right side. ¼ day
Front wind screen to change both side. ½ day
Front wind screen to change after structure repairing. ½ day
Newly making of curved glass structure to fit new curved glass of varying sizes. 04 days
a) Passenger gate with glass frame to be made newly & painting. 04 days
b) Emergency gate with glass frame to be made newly & painting. 03 days
Stair case to repair (minor). 02 days
Stair case to repair (major). 03 days
a) Window glass frame to repair (each). ½ day
b) Window broken glass to changed (each). ¼ day
Window glass frame to making newly (each). 1 day
Window glass rubber to change (each).¼ day
Window glass frame panel structure to repair (each). 1 day
a) Back side body to repair with painting. 3 days
b) Back side body to be made newly including painting. 5days
Roof tar felt to fit. ½ day
Passenger seat frame to repair (Semi deluxe) each (including painting). 1 day
Passenger seat frame to repair (Deluxe) each (including painting). 1day
Front Cabin floor to repair. 2days
Passenger gate golai to repair. 2 days
Diesel tank to washing, repairing & painting. 1 day
Silencer box to repair (opening & fitting). 1 day
Silencer pipe to repair (opening & fitting). 1 day
Air pipe, Diesel pipe, Engine oil pipe to repair (each point). ⅛ day
Front wind screen (Single glass) to change. 1 day
Front wind screen (Single glass) to change after frame repairing. 2 days
Front wind screen (Single glass) to change after frame newly making. 10 days
Front structure to be modify in to two parts from single wind screen. 7 days
A.C. Coach window glass to change (each). ½ day
A.C. Coach window glass to change after structure repairing (each). ½ day
Each passenger seat to repair Rexene changed only (Semi deluxe).½ day
Each passenger seat (Semi deluxe) to repair Rexene & Ply board to changed. ½ day
Each passenger seat back rest Rexene to change only (Semi deluxe).½ day
Each passenger seat back rest Rexene & Ply board to change (Semi deluxe).½ day
Each passenger seat to repair Rexene to change only (Deluxe).½ day
Each passenger seat to repair Rexene & Ply board to change (Deluxe).½ day
Each passenger seat back rest & Rexene changed. ½ day
Each passenger seat back rest Rexene & ply board to changed (Deluxe).½ day
Engine bonnet, Fr. bumper, Fr. cross member & Fr. grill opening & fitting.½ day
a) Front bumper to repair.½ day
b) Front bumper to be made newly & painting. 2 days
a) Rear bumper to repair.½ day
b) Rear bumper to be made newly & painting. 2 days
Front cross member to repair.½ day
Luggage carrier to repair (Inside). 1 day
Luggage Dickey to repair.1 day
Engine Dash board to repair.1 day
Rear glass to fit.½ day
Rear glass to fit after making 2 parts. 1 day
Checker plate (gangway) riveting. 1 day
Checker plate (Full) riveting (after seat frame opening). 3 days
Head light cashing (bed Foard types) making incase of FRB show. 2 days
Air cleaner (damaged) repairing.½ day
Vehicle inside & outside washing.½ day
Each Tyre lever/hammer wooden handle making.½ day
Bolt cutting/welding (each).⅛ day
Any spares heating by gas.⅛ day
Route board making & painting.½ days
Route board with frame making & painting & fitting on the vehicle. 1 day
Vehicle under chassis washing.1 day
Ceiling velvet pasting (full). 2 days
Ceiling velvet pasting (half).1 day
Accidental body panel (8’ X 4’) repairing & painting.3 days
Big window glass to change. 1 day
Floor plywood change with mat pasting of A.C. coach.6 days
Each passenger seat back rest to be made newly of A.C. coach.1 day
Each passenger seat cushion to be made newly of A.C. coach. 1 day
Each chassis u-bolt of body to be changed & fitment with new balata packing. ½ day
Front engine cashing full repair & properly aligned.3 days
Each chassis cross member to be changed (including paint). ½ day
BS-IV & VI wiring harness fitting/repairing (engine portion).2 days
A R ENTERPRISE (BID ID -5541993)
LOKENATH AUTO BODY BULDERS (BID ID -5539156)
PAL ENTERPRISE (BID ID -5537984)
NANDI AUTO BODY BUILDERS (BID ID -5538090)
ROY BODY BUILDERS (BID ID -5537180)
ROY BODY BUILDERS
LOKENATH AUTO BODY BULDERS
A R ENTERPRISE
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .