Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.2 CrAccepted-Finance E 165 SHASTRI NAGAR DELHI 110052 | NORTH DELHI | DELHI | 110052 | L1 | Accepted-Finance Accept | |
| 2 | L2₹6.2 Cr+₹58,173.40 (0.09%)Accepted-Finance WZ 3 KAILASH PARK OPP KIRTI NAGAR PUNJAB NATIONAL BANK NEW DELHI 110015 | NEW DELHI | NEW DELHI | DELHI | 110015 | L2 | Accepted-Finance Accept | |
| 3 | L3₹6.3 Cr+₹9.2 L (1.49%)Accepted-Finance | L3 | Accepted-Finance Accept | |
| 4 | L4₹6.8 Cr+₹58.5 L (9.43%)Accepted-Finance A 15 1ST FLOOR PRIYADARSHINI VIHAR DELHI 110092 | SHAHDARA | DELHI | 110092 | L4 | Accepted-Finance Accept | |
| 5 | L5₹7.0 Cr+₹78.1 L (12.6%)Accepted-Finance B 37 ASHOK VIHAR PHASE I NEW DELHI 110052 | NEW DELHI | NEW DELHI | DELHI | 110052 | L5 | Accepted-Finance Accept |
Tender Value
₹9.7 Cr
EMD Value
₹19.4 L
Closing Date
21 Oct 2025, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE, NWR-1, PWD, Mukarba Chowk, Delhi-110033
EE, NWR-1, PWD, Mukarba Chowk, Delhi-110033
Strengthening of Jhule Lal Marg, Shri Ram Mandir Marg, ROB Road No. 37, Wazirpur Flyover and Maharaja Aggarsen Marg under PWD North West Road-1 Division dg. 2025-26
2025_PWD_279373_1
67/EE/NWR-1/PWD/2025-26
Open Tender
Civil Works - Roads
Percentage
60 days
EE, NWR-1, PWD, Mukarba Chowk, Delhi-110033
Strengthening of Jhule Lal Marg, Shri Ram Mandir Marg, ROB Road No. 37, Wazirpur Flyover and Maharaja Aggarsen Marg under PWD North West Road-1 Division dg. 2025-26
16 documents required · 16 mandatory
₹0
₹19.4 L
3 Nov 2025
6 Oct 2025
21 Oct 2025
6 Oct 2025
21 Oct 2025
6 Oct 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing and applying tack coat using bitumen emulsion conforming to IS: 8887, using emulsion pressure distributer including preparing the surface & cleaning with mechanical broom. With medium setting bitumen emulsion
(a) On bituminous surface @ 0.25kg/sqm | 1,51,674 | Sqm | 14.05 | ₹21,31,019.7 |
| 2 | DSR 2023 correction factor is 0.973 as per OM 158/SE (TAS)/GST/2024/02-E dt.08/08/2024 | 1 | Sqm | 57,538 | ₹57,538 |
| 3 | Cold Milling of Asphaltic Surface/Pavement (Removal of BC/DBM or any asphaltic material from road Surface/Concrete Surface) in thickness of 25 to 100 mm so as to below in shape, slope and undamaged workable to lay fresh layer of asphaltic material in line, level, size, depths directed by Engineer-in-Charge including transportation and disposal of removed material from site for all lift and leads, cleaning of surface and making good or asphalting work including local repair of damages/ distress occurre after milling etc. complete as per method and machinery prescribed in IRC. | 7,093.65 | Cum | 1,157.7 | ₹82,12,318.6 |
| 4 | Providing and laying Recycled Dense Graded Bituminous Macadam blend of upto 30% (by weight of total hot mix) reclaimed bituminous materials and 70% (by weight of total hot mix) new materials of specified grading permixed with bituminous binder, filler and rejuvenators as required, transporting the hot mix to work site by tippers, laying with paver finisher equipped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem roller as per specification to achieve the desired compaction and density, complete ar per specification and direction of Engineer-in-Charge. 50 to 100 mm average compacted thickness with final bitumen content @5% of grade VG-30 and lime filler @ 2% (percentage by weight of Aggregates) and waste plastic additive @8% (percentage by weight of bitumen) Necessary checks, evaluation as per MORTH specification for job mix design shall be carried out on the expenses of contractor before hauling and stock piling the reclaimed materials near the central recycle plant. (The rate of this item is including of all the operation mentioned in nomenclature and also necessary to complete the execution of this items. No extra shall be paid for hauling & stock piling etc.) | 4,550 | Cum | 9,175.35 | ₹4,17,47,842.5 |
| 5 | Providing and laying stone matrix Asphalt (SMA) using crushed stone aggregates of specified grading, premixed with bituminous binder and lime filler and cellulose fiber transporting the hot to work site by tippers, laying with paver finisher equipped with electronic sensor to the. required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction and density as per MORTH specification (5th revision) clause no. 515, complete in all respects and as per directions of Engineer-in-charge.
40/50 mm compacted thickness with grade PMB 76-10 @ 6% (percentage by weight of total mix) and lime filler @ 3% (minimum) (percentage by weight of Aggregate) and bitumen coated cellulose fiber pellets @ 0.30% of total mix, prepared in Batch Type Hot Plant of 100-120 TPH capacity. Note:- The overall minimum bitumen content shall be 6% of tatal mix and lime filler @ 3% (minimum) (percentage by weight of Aggregate) and bitumen coated cellulose fiber pellets @ 0.30% of total mix. Nothing extra shall be paid for variation in materials in as per mix, design. | 490 | Cum | 16,552.2 | ₹81,10,578 |
| 6 | Providing and laying Bituminous concrete using crushed stone aggregates of specified grading, premixed with bituminous binder and filler, transporting the hot mix to work site by tippers, laying with paver finisher equiped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction and density as per specification, complete and as per directions of Engineer-in-Charge.40/50 mm compacted thickness with bitumen of grade PMB 76-10 @ 5.5% (percentage by weight of total mix) and lime filler @ 3% (percentage by weight of Aggregate) prepared in Batch Type Hot Mix Plant of 100-120 TPH capacity. | 2,641 | Cum | 14,731.8 | ₹3,89,06,683.8 |
| 7 | Credit for salvage value of milled bitumimous material received from cold milling but not used in the recycled bituminous mix . | 5,729 | Cum | 638.2 | ₹36,56,247.8 |
| 8 | Add @3% Cost Index on Item No. 1, 2 & 3 = 52033644/- | 1 | Cum | 15,61,009 | ₹15,61,009 |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.36 MB
BOQ_368720.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .