Loading
Loading…
Loading…
Tender Value
Refer Docs
Closing Date
22 Nov 2023, 3:00 pmClosed
12608-PURNEA LPG REGIONAL OFFICE
This Tender is published for finalization of Purchase on Lowest and competent bidder for carrying out the
GEM/2023/B/4224671
5100007911
Open Tender
Unknown (Unspecified Location)
₹0
Exempted
22 Nov 2023
13 Nov 2023
22 Nov 2023
22 Nov 2023
14 Nov 2023 - 16 Nov 2023
| Item No | Item Title | Description | Qty | Unit |
|---|---|---|---|---|
| 1 | TESTING AND CALIB OF TSV | TESTING AND CALIB OF TSV — LIBRATION OF TSV: THE SCOPE OF THE JOB INVOLVESTESTING AND CALIBRATION OF TSV SET PRESSUREAGAINST MASTER GAUGE. DISMANTLING OF T FROMPROCESS LINE, PROVIDING BLINDING ARRANGEMENT, REFITTING AFTER TESTING IS UNDER VENDOR SCOPE. SAMEHAS TO BE DONE UNDER HPC SUPERVISION. AFTERTESTING, VENDOR TO TAG TSV WITH TESTING DATE, DUEDATE DETAILS. TESTING REPORT TO BE SUBMITTED INHPCL APPROVE FORMAT. ALL EQUIPMENT ANDCONSUMABLES INCLUDING, TESTING BENCH, MASTERGAUGE, PUMP ETC TO BE PROVIDED BY VENDOR. ALLEQUIPMENT US BY VENDOR TO HAVE CALIBRATIONCERTIFICATE TRACEABLE TO NABL/NPL/EQUIVALENTSTANDARDS. TESTING AND CALIBRATION TO BE DONEWITHIN CL PREMISES. JOB FREQUENCY IS HALFYEARLY. | - | Each |
| 2 | CALIBRATION OF PRESSURE | CALIBRATION OF PRESSURE — LIBRATION OF PRESSURE GAUGE: SCOPE OF THE JOBINVOLVES ON SITE CALIBRATION OF PRESSURE GAUGESGENERALLY OF ALL RANGES REMOVAL OF G GE FROMPROCESS PIPING AFTER CLOSING OF ISOLATION VALVE,PROVIDING BLINDING ARRANGEMENT IF REQUIRED,REFIXING OF GAUGE AFTER CALI ATION IS UNDERVENDOR SCOPE. VENDOR MUST HAVE NABL ACCREDITATIONAND ALL MASTER INSTRUMENTS SHOULD HAVECERTIFICATES TRACEABLE TO ABL/NPL. TAGGING OFGAUGE TO BE DONE AFTER CALIBRATION. REPORT TO BESUBMITTED IN HPCL APPROVED FORMAT. CALIBRATIONSHALL BE IN A ORDANCE WITH IS 3624/ISO3567/EQUIVALENT APPLICABLE STANDARDS. JOBFREQUENCY IS HALF YEARLY. | - | Each |
| 3 | TESTING AND CALIB- | TESTING AND CALIB- — HE FOLLOWING ARE THE DETAILS OF THE PRESSURERELIEF VALVES INSTALLED ON THE PRODUCT STORAGETANKS: PRESSURE RELIEF VALVE SIZE 6IN, KE SHANDAND JURS/WESS LEVEL CONTROLS LTD, MODEL NO94126/8306, PRESSURE SETTING: 0.5 OZ (22MM OFW.C.)/75MM OF W.C. THE | - | Each |
| 4 | MASTER GAUGE FOR | MASTER GAUGE FOR — STER PRESSURE GAUGE GAUGE WITH TESTINGCERTIFICATES FOR CALIBRATION OF OTHER GAUGES | - | Each |
| 5 | CAL OF PRESSURE | CAL OF PRESSURE — LIBRATION OF PRESSURE TRANSMITTER. | - | Each |
| 6 | SUP&INST - COMPOUND | SUP&INST - COMPOUND — PPLY, INSTALLATION, TESTING AND COMMISSIONING1/2 INCH NPT, 6 INCH DIAL, STAINLESS STEEL 316COMPOUND GAUGE. ITEM SPECIFICATIONS: MPOUNDRANGE-1 KG/CM2 TO 10 KG/CM2. GLYCERIN FILLED.STAINLESS STEEL CASING 6 INCH DIAMETER. NABLCERTIFIED. ANTI VIBRATION DAMPE APPROVED MAKENOTE TO VENDOR: VENDOR HAS TO GIVE THECALIBRATION CERTIFICATE OF ALL THE GAUGES. REFERDETAIL TECHNICAL SPECIFICAT N. | - | Each |
| 7 | SPRING,TSV | SPRING,TSV — RT NAME:SPRING; PART NUMBER:N/A;MANUFACTURER:N/A; EQUIPMENT NAME:THERMAL SAFETYVALVE; EQUIPMENT MODEL:N/A; EQUIPMENT SERIALNUM R:N/A; HAVING 14 KG/CM2, 10 KG/CM2 AND 4KG/CM2 DESIGN PRESSURE HAVE SPRING (XO9742) ALONGWITH 2 WASHER. | - | Each |
| 8 | PRESSURE GAUGE | PRESSURE GAUGE — PPLY AND INSTALLATION OF PRESSURE GAUGE AS PERINSTALLATION STANDARD,SPECS,DATA SHEETS & P&IDS.BOURDON TYPE WITH 2-WAY MANIFOLD, RECT MOUNT,150MM DIAL, WETTED PART SS316, IP 65 RATED, BLOWOUT PROTECTION AND SHATTER PROOF HEAVY DUTYGLASS. INCLUSIV | - | Each |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
2300007911-HB-01281.pdf
TENDER_DOCUMENT • 11.11 MB
122278.pdf
TENDER_DOCUMENT • 0.10 MB
Download all tender documents and submit your bid